4.5.2 Design Revisions Based on VE Recommendations

Depending on the results of the VE workshop, the geometric schematic may need to be modified. If the design and/or layout is revised, the District’s review team should review the revised materials as discussed in .
All review comments from the District review team should be documented and addressed in the Schematic QC Checklist.
Environmental studies or approvals may need to be reevaluated to incorporate VE recommendations and design modifications.