3.4.2 Compliance with Existing Planning Documents

All existing planning documents and programs on the State, regional and local levels that could influence the project scope should be identified and documented in the DSR. The project can encounter significant delays if the proper coordination with stakeholders is not performed during project scoping. Ensure that the project complies with existing plans such as:
  • TxDOT:
    UTP or STIP, ADA Transition Plan, and other statewide plans;
  • Regional:
    TIP, MTP, and transit plans; and
  • Local:
    Thoroughfare plans, master street plans, bicycle plans, economic development plans, water/wastewater, utility, transit, aviation, railroads and ports.