Formal Inspection Documentation
    Document compliance and deficiencies on Form 599 in accordance with the instructions on the reverse side of the form.
At the time of inspection, the Engineer will determine the priority of each deficiency. Priority 1 deficiencies are those deficiencies needing immediate corrective action due to imminent danger. For example, missing or illegible regulatory signs require immediate corrective action. Priority 2 deficiencies are deficiencies needing corrective action but pose minimal risk to the traveling public, e.g., slightly leaning or dirty traffic control devices.
In accordance with the 
ATSSA Quality Guidelines for Temporary Traffic Control Devices and Features
, up to 25% marginal devices (signs, drums, cones, etc.) would be considered Priority 2 deficiencies. Any time greater than 25% of the devices are marginal, the replacement or cleaning of devices is considered a Priority 1 deficiency. Unacceptable devices are Priority 1 deficiencies.Verify Form 599 has been completed.
Once the inspection is complete, the CRP must sign and date Form 599. Provide a signed copy to inform the contractor of corrective action needed. As the contractor corrects deficiencies, document on the original form the completion date for each and initial the verification section.
Form 599 may be filled out electronically. Do not maintain (save) or distribute electronic versions.