Working Drawings

The contract may require that the contractor furnish working drawings such as:
  • shop drawings,
  • supplementary bridge plans, or erection drawings for bridge structure components,
  • sign supports,
  • illumination facilities, and
  • other items.
A licensed professional engineer must sign, seal, and date working drawings in accordance with
the
Standard Specification
, Article 5.2, Table 1 “Signature and Approval Requirements for Working Drawings,” or as otherwise specified in the plans. Handle the review and approval of these drawings and other required information according to instructions found in the specifications. Refer to Item 5 and the webpage for requirements associated with working drawing submittals.