7.3.1 Goal Methodology
DB/CDA projects are reviewed for their potential inclusion into the TxDOT Project-Specific OJT program in accordance with the guidelines set forth in 23 CFR§230.111:
- Dollar value of the construction services contract;
- Duration of the construction work activity;
- Geographic location;
- Availability of minorities, women, and disadvantaged for training;
- The potential for effective training;
- Type of work;
- Total normal work force that the average proposer could be expected to use;
- The need for additional journeymen in the area;
- Recognition of the suggested minimum goal for the State; and
- A satisfactory ratio of trainees to journeymen expected to be on the design-builder/developer's work force during normal operations.
Once a project is selected, the DB/CDA project’s construction cost estimate is used to identify the number of trainees that will be assigned to that project. The formula for assigning project-specific goals is illustrated in the following table: