Section 3: District CUF Verification

Overview

The DDC will review CUF reports completed in DMS.

CUF Sign-off in the DMS Subcontractor Table

Step 1:
Log in to DMS
Step 2:
Locate desired contract and navigate to
Contract Management
page.
Step 3:
Click on the
Subs
tab.
Step 4:
For each subcontractor click
Edit
.
 (click in image to see full-size image)
Step 5:
Select
Yes
from the drop down menu on the
CUF Reviewed
line.
Step 6:
Select
Performing
from the drop down menu on the CUF Determination line.
Step 7:
Enter
Area Engineer Date
and
District Approval Date
.
Step 8:
Click
Review
.
 (click in image to see full-size image)
Step 9:
Click
Save.
 (click in image to see full-size image)
Note: “Yes” will now display in the CUFReviewed Column of the Subcontractors table. (click in image to see full-size image)
Figure 13-1. Note: “Yes” will now display in the CUF Reviewed Column of the Subcontractors table.