Section 2: Locking in Contract Records in DMS

Overview

Each contract will be imported into the DMS system via an automated process. It is the responsibility of the District to review that the contract details have been entered correctly. The contract settings should not be changed unless CIV staff is consulted.

To View All New Records

Step 1
: From the View Menu, click Contracts.
Step 2
: From the Actions list, select New Contract.
 (click in image to see full-size image)

Locking In New Contract Records

Step 1:
Click
View
to view the associated contract record.
 (click in image to see full-size image)
Step 2
: Click
Review Contract
. (An alert displays to provide instructional information.)
Note: All contract alerts are displayed in red. If the contract is a new record, the alert “Contract record is new and must be reviewed for accuracy” will be listed.
 (click in image to see full-size image)
Step 3:
Click
OK
(The contract edit page displays with the contract header data from the import auto-filled into the fields. Many fields will be blank or zero.)
 (click in image to see full-size image)
Step 4:
Review the entire record and update as needed. When finished, click Review at the bottom of the page. When reviewing the data, do the following:
  • Verify Contract title/description
  • Verify CSJ
  • Verify Value of contract
  • Verify (and change if necessary) (Projected) End Date
  • Verify Prime Contractor Information
  • Verify (and change if necessary) Buyer/Project Manager (in-system user)
  • Verify DBE Goal
  • Add funding sources and amount (important for DBE FHWA funded projects)
CIV will post the Federal Contract Update Report in SharePoint, which will include the project CSJ and corresponding percentage of federal funding. Use the information to complete the following:
  1. Select
    Percentage
    from the Funding source based on dropdown menu.
  2. Enter the percentage amount from the Federal Contract Update Report in the FHWA field.
  3. Click the
    Calculate
    link.
 (click in image to see full-size image)
  • Verify subcontractor settings
Do not adjust default settings.
  • Select the appropriate
    County
    .
     (click in image to see full-size image)
  • Select the
    Congressional District of the State of Texas
    number where the project resides. (Multiple selections are allowed if the project encompasses multiple Districts)
  • Verify Waiver information
  • Select the appropriate
    TxDOT Division
    .
  • Select the appropriate
    State Object Code
    .
  • Adjust audit settings (as necessary for DBE prime contractors)
  • Verify Contract compliance officer is correctly assigned.
  • Add notes (if necessary)
  • Attach electronic documentation
Step 5:
Click
Review
to review the contract. (Click
Edit
to make further changes, if needed)
Step 6:
To save the record, click
Save
.
Step 7:
Select the
Change Orders & Task Orders
tab. Click
Add More References
.
 (click in image to see full-size image)
Step 8:
Enter the CSJ and select
Contract Number
. Click
Save References
.
 (click in image to see full-size image)