Policy

MASH requires all barriers, including temporary barriers, to meet its crash test criteria.
Bridge railings that will be permanent in the final bridge, but act as temporary barriers during construction, must be installed with all their components for the full duration of use, and must satisfy the minimum height specified for the rail.