Procedures for Changing Off-System Bridge Non-EV Load Posting
Use the following procedure to place, modify or remove load restrictions, excluding EVs, for off-system bridges where an inspection and subsequent load rating show that the bridge's ability to safely carry state legal loads is compromised:
Step | Responsible Party | Action |
---|---|---|
1 | Consultant/ District/BRG | Inspector determines a change in posting status based on condition ratings and load rating of the structure. A change in posting status may result from one of the following:
|
2 | District | Upon receipt of a recommendation for a change in load restriction, take the following actions:
|
3 | Bridge Division Load Rating Engineer | Provide Districts with monthly reporting that tracks the status of recommended load posting changes. |
4 | District | Take the following steps if signs are ordered for a load posting implementation:
|
5 | District | After signs have been placed or removed:
|