Documentation and Record Keeping

Any repair plans submitted to remedy the damage should be uploaded to the Bridge Inspection Management System. If the condition rating needs to be lowered for Items 58-62 or 65, then a Damage Inspection Report should be completed, and appropriate steps completed in the Bridge Inspection Management System to document the damage and substantiate the change in the rating.