Pile Tip Elevations
To ensure constructed foundation meets the design requirements, pile tip elevations or pile lengths are required on the contract plans. As noted in section 1: Design Process, the final length and tip elevation may be controlled by any or all of the following criteria:
- Pile tip to reach designated bearing layer
- Scour
- Downdrag
- Uplift
- Lateral Loads