Pile Tip Elevations

To ensure constructed foundation meets the design requirements, pile tip elevations or pile lengths are required on the contract plans. As noted in section 1: Design Process, the final length and tip elevation may be controlled by any or all of the following criteria:
  • Pile tip to reach designated bearing layer
  • Scour
  • Downdrag
  • Uplift
  • Lateral Loads