Constructability

Design of foundations must consider the effects of the anticipated method of construction, including the construction sequencing. Such considerations shall consist of, but not be limited to: the need for shoring, the use of cofferdams, tremie seals, dewatering, excavation stability, downdrag considerations, and the need for permanent or temporary casing for drilled shafts or micropiles.