Difficult Driving
If it is necessary to advance the piling through a strong or stiff layer where refusal is possible, a pile penetration note may be required. A typical note may read, “The contractor’s attention is drawn to the hard material in the soil profile, jetting and/or pilot holes may be necessary to advance the piling to the required penetration depth.”