Plans

For projects with bridge plans, follow these preparation guidelines.
  • Obtain preliminary bridge layout approval prior to any percent PS&E submittal. Include preliminary retaining wall layouts with this submittal when necessary. See Section 1 of this chapter for more information.
  • Ensure information on the title sheet corresponds with information on Design and Construction Information System (DCIS)
    and TxDOTCONNECT
    .
  • Include the most current standards. All standards used must be clearly listed on the index of sheets even if unavailable at the time of submission.
  • All modified (MOD) and special (SPL) standards must be signed and sealed by the responsible engineer. Include a brief description of the modifications, typically shown in the Revisions area of the title block.
  • Show all hydraulic documentation correctly in the final plans as required by the Hydraulic Design Manual
    and the PS&E Preparation Manual
    . Hydraulic comments based on the preliminary submissions must be addressed prior to submitting
    next stage of
    PS&E.
  • For projects involving a highway-railroad grade separation, an executed railroad agreement is required prior to letting. On federal oversight projects, send a copy of the agreement to the Federal Highway Administration (FHWA). Further information concerning railroad agreements can be found in Chapter 4 of this manual.