Bridge Division Submission Requirements
Submit all structures to be let under a single project as one submittal to ensure uniformity of design and eliminate duplication of standards. Submittal requirements for typical bridge layouts and those involving a railroad are listed below.
The transmittal e-mail from the
District
to the Bridge Division’s PS&E Review Branch must contain the following information:- District(both lettingDistrictand designingDistrict, if different)
- County
- CSJ
- Facilitycarriedand feature crossed
- Ready-to-let date and proposed letting date
- Project type (new construction, rehabilitation, replacement, widening, etc.)
- Bridge designer (District, division, consultant)
- Point-of-contact information
- Request for review
- Any relevant information that the division may need to complete its review
- Preliminary bridge layout
- Typical sections sheet
- Construction sequence sheet
- Drainage Area Map and Hydraulic Sheet
- H&H Drainage Analysis Reportand HEC RAS models for more complex hydraulic models
- The H&H Drainage Analysis Report, Drainage Area Map, Hydraulic Data Sheet, and Bridge Scour Data Sheetfor all span bridges over a stream crossing.
- Plan and profile sheets showing the project limits and the completed original of Form 1002 (p. 3 of 3) for all projects funded by Category 6.
- A map view of the project illustrating the relationship of the roadways if the project is an interchange, or aninterchangeexists within the vicinity
- The Railroad Exhibit A plan sheets, if applicable. Exhibit A must also be submitted to the Rail Division’s Rail Safety Section.