Bridge Division Submission Requirements

Submit all structures to be let under a single project as one submittal to ensure uniformity of design and eliminate duplication of standards. Submittal requirements for typical bridge layouts and those involving a railroad are listed below.
The transmittal e-mail from the
District
to the Bridge Division’s PS&E Review Branch must contain the following information:
  • District
    (both letting
    District
    and designing
    District
    , if different)
  • County
  • CSJ
  • Facility
    carried
    and feature crossed
  • Ready-to-let date and proposed letting date
  • Project type (new construction, rehabilitation, replacement, widening, etc.)
  • Bridge designer (
    District
    , division, consultant)
  • Point-of-contact information
  • Request for review
  • Any relevant information that the division may need to complete its review
  • Preliminary bridge layout
  • Typical sections sheet
  • Construction sequence sheet
  • Drainage Area Map and Hydraulic Sheet
  • H&H Drainage Analysis Report
    and HEC RAS models for more complex hydraulic models
  • The H&H Drainage Analysis Report, Drainage Area Map, Hydraulic Data Sheet, and Bridge Scour Data Sheet
    for all span bridges over a stream crossing.
  • Plan and profile sheets showing the project limits and the completed original of Form 1002 (p. 3 of 3) for all projects funded by Category 6.
  • A map view of the project illustrating the relationship of the roadways if the project is an interchange, or an
    interchange
    exists within the vicinity
  • The Railroad Exhibit A plan sheets, if applicable. Exhibit A must also be submitted to the Rail Division’s Rail Safety Section.