Submittals
Exhibits submitted by the
District
to the Bridge Division project manager should include the following:- Details on how the line is attached to the bridge -- (Utility Attachment Exhibit A)
- Show proposed location of attachment on elevation view of bridge layout
- Show specific detail of attachment to bridge with appropriate notes to the contractor
- The Utility Attachment Exhibit A must be signed and sealed by a licensed professional engineer
- Identification of control, section, and original job number of the bridge if possible
- National Bridge Inventory (NBI) number of the bridge
- Copies of bridge layout and pertinent details of existing bridge as-built plans (if available)