Excluded Work Categories
The following specific work categories are
not eligible
for funding under the BMIP:- Bridge widening projects that require installation of additional substructure elements. Minor widening in conjunction with deck replacement that can be accommodated using the existing substructure will be eligible.
- Bridge replacements.
- Bridge rail replacement-only projects.
- Debris removal-only projects, although debris removal may be included when addressing other defects on the bridge through BMIP.
- Projects to address critical findings. While the Bridge Division remains available to assist District in responding to critical findings, it is not the goal of the BMIP to serve as a reactionary funding source to address such issues.