Study Description
The scope of this project is for roadway widening.
Current Conditions
The current road is undivided with two 10-foot travel lanes and open ditches for the length of the project, 2.8 miles.
Proposed Improvements
Partners
This project is a partnership between the City of Pearland and TxDOT.
Public Involvement
Contact
TxDOT Houston District
PO Box 1386
Houston, TX 77251-1386
(713) 802-5246
Email
Copyright 2017
•
Texas Department of Transportation
•
All Rights Reserved
•
Disclaimer
•
Privacy & Security Policy
•
Accessibility
125 East 11th Street
•
Austin, Texas 78701