Interstate I-35W Background

Interstate (I)-35W is the main north-south corridor through the cities of Fort Worth, Everman, Crowley and Burleson in Tarrant and Johnson counties. 

According to the U.S. Census Bureau, Tarrant County was ranked as the fifth fastest growing county in the U. S. between 2016 and 2017. This growth is the catalyst for the need to expand the existing transportation infrastructure.

Proposed Benefits

The TxDOT Fort Worth District is conducting a corridor study of I-35W between I-20 and SH 174 to develop proposed improvements that would increase capacity, improve safety and mobility and ease congestion in this area.

I-35W Corridor Study map

Proposed Improvements

As the study progresses, public involvement will be a key component of the project. Interested residents, property and business owners can provide comments anytime throughout the study and at public meetings planned at key milestones during the project.

Get Involved

The public will be able to gather information, review schematic plans, meet with TxDOT and consultant staff, ask questions and leave comments regarding the proposed design, right of way and environmental during these meetings. The following is a tentative meeting schedule:

  • Public Meeting #1: Tentatively scheduled for Summer 2020
  • Public Meeting #2: Tentatively scheduled for 2021
  • Public Hearing: Tentatively scheduled for 2022

Contact Us

For more information about this project, please contact:
Fort Worth District Office
2501 SW Loop 820
Fort Worth, TX 76133
(817) 370-6852