TxDOT is proposing improvements to US 79 from 0.5 mile west of FM 487 (Erie Ave) to 0.2 mile east of Highway 77. The project would also include funding from the Texas Alternatives Set-Aside (TASA) program awarded to the City of Rockdale to rehabilitate and/or replace the existing sidewalks, handicap ramps, railing, and lighting within the downtown area from Burleson St. to Ackerman St. (FM 487).
Proposed improvements
A detailed set of design plans and environmental study are being finalized. The project is funded and anticipated to let for construction bids in the Fall 2019 with estimated construction beginning early 2020.
A public meeting is scheduled for June 27, 2019; TxDOT encourages the public to sign up for email updates to be alerted about the upcoming meeting date.
Downloads
Contact Us
TxDOT Bryan District
Director of Transportation Planning and Development
2591 N. Earl Rudder Freeway
Bryan, TX 77803-5190
(979) 778-2165
Email
Copyright 2020
•
Texas Department of Transportation
•
All Rights Reserved
•
Disclaimer
•
Privacy & Security Policy
•
Accessibility
125 East 11th Street
•
Austin, Texas 78701