Traffic Switches for US 75 Begin on June 17
Skip to main content
Texas Department of Transportation
Connecting You With Texas
  • Family
  • Jobs
  • Education
  • Opportunities
  • Attractions
  • Entertainment
  • Wide Open Spaces
  • History
  • Quality of Life
  • Sports
  • Parks
  • Shopping
  • Services
  • People
  • Wildflowers
  • BBQ
  • Shores
  • Schools
  • Rodeos
  • Music
  • Tacos
  • Adventure
  • Trails
  • Traditions
  • Safely
  • Sunsets
  • Culture
  • Festivals
  • Friends
  • Life
  • Possibilities
  • Legends

 


Contact: Tim McAlavy

Phone: (903) 737-9213

Date: June 13, 2022


TxDOT announced that northbound US 75 mainlane traffic will shift to the existing frontage road south of Lamar Street, transition to the newly-constructed on-ramp at Washington Street, and shift back to existing mainlanes just before North Travis Street beginning at 7:30 p.m. on June 17, 2022, weather permitting.

This switch will allow crews to reconstruct the US 75 mainlanes and the bridge over Lamar and Houston Streets. After this switch, US 75 northbound frontage road traffic will be reduced to one travel lane, while two lanes remain open for US 75 northbound mainlane traffic. A concrete barrier will separate frontage road and mainlane traffic at this location after the switch, officials said.

A similar switch will occur for southbound US 75 mainlane traffic beginning at 7:30 p.m. on June 24, officials said. Southbound US 75 mainlane traffic will shift to the existing frontage road north of North Travis Street and transition back to existing mainlanes just after Lamar Street. After this switch US 75 southbound frontage road traffic will be reduced to one travel lane, while two travel lanes remain open for US 75 southbound mainlane traffic. A concrete barrier will separate frontage road and mainlane traffic at this location after this switch, officials said.

On July 1, 2022, Washington Street will be reopened to through traffic to restore east-to-west connectivity through this street.

Officials anticipate these changes will remain in place for about 12 months. To help motorists plan their travel, video animations of these traffic switches are posted for viewing on YouTube:

Officials advised motorists to watch for road crews, expect some delays and plan their commutes in advance while this closure and traffic switch are in effect. This construction and any necessary temporary lane closures it creates are subject to change due to weather or other unforeseen circumstances, officials said.

Those who frequently travel in this area are asked to pay special attention to all barricades, traffic controls and signs, and to reduce their speed as they approach and travel through work zones. They should also avoid distractions such as cell phones, eating, drinking, or car audio or navigation systems.

###

The Texas Department of Transportation is responsible for maintaining 80,000 miles of road and for supporting aviation, maritime, rail, and public transportation across the state. Through collaboration and leadership, we deliver a safe, reliable, and integrated transportation system that enables the movement of people and goods.  Find out more at TxDOT.gov. "Like" us on Facebook and follow us on Twitter.

 

Copyright 2022  •  Texas Department of Transportation  •  All Rights Reserved  •  Disclaimer  •  Privacy & Security Policy  •  Accessibility
125 East 11th Street  •  Austin, Texas 78701