Contact: Jennifer Wright

Phone: (915) 790-4340

Date: Sept. 6, 2019


Nine Month Closure

Sunday, September 8, beginning at 9pm

  • Ramp F which connects westbound I-10 to Juárez will be closed to all traffic.
  • DETOUR (Sept. 8 and Sept. 9): Take Exit 23B (US 62/180/Chelsea Street/Paisano Drive), turn right on Paisano to access the Bridge of the Americas.
  • LONG-TERM DETOUR: Take Exit 22B (US 54/Alamogordo/Juárez/Fort Bliss) to northbound US 54, take Exit 23 (Cassidy Road/Fort Bliss), take Exit 22B (Pershing Drive), use the turnaround to enter southbound US 54 and follow signs to Juárez.
  •  Crews will begin demolition of parts of Ramp G.

Day-By-Day Breakdown of Other Traffic Impacts

Sunday, September 8, and Monday, September 9

Nightly 9pm to 5am

  • Ramp G which connects eastbound I-10 to Juárez will be closed to all traffic.
  • JUÁREZ DETOUR: Take Exit 23B (US 62/180/Chelsea Street/Paisano Drive), turn right on Paisano to access the Bridge of the Americas.
  • Southbound US 54 will be closed to all traffic at the Pershing Drive underpass.
  • US 54 TO I-10 DETOUR: All traffic will take Exit 21B (I-10 West/Las Cruces) and continue on westbound I-10. Eastbound traffic and traffic bound for Juárez will take Exit 20 (Cotton Street), turn left on Cotton and left on eastbound I-10.
  •  Crews will be removing and replacing temporary safety barriers.

Tuesday, September 10, from 9pm to 5am

  • Westbound I-10 will be closed to all traffic at US 54.
  • DETOUR: Take Exit 22B (US 54/Alamogordo/Juárez/Fort Bliss) to northbound US 54, take Exit 23 (Cassidy Road/Fort Bliss), take Exit 22B (Pershing Drive), use the turnaround to enter southbound US 54 and follow signs to westbound I-10.
  •  
  • Crews will be working on an overhead bridge deck.
  • Ramp G which connects eastbound I-10 to Juárez will be closed to all traffic.
  • DETOUR: Take Exit 22B (US 54/Alamogordo/Juárez/Fort Bliss) to northbound US 54, take Exit 22B (Pershing Drive), use the turnaround to enter southbound US 54 and follow signs to Juárez.
  • Crews will be preparing parts of an existing ramp for demolition.
  • US 62 (Paisano Drive) will be closed to all traffic at US 54.
  • DETOURS: Eastbound traffic will turn right on San Marcial Street, left on Delta Drive, and left on Boone Street before returning to Paisano. Westbound traffic will turn right on Gateway Boulevard North, left on SH 20 (Alameda Avenue), and left on Loop 478 (Copia Street) before returning to Paisano.
  • NOTE: Traffic leaving westbound Look 375 via Exit 20 (US 62/Paisano Drive) will not be able to turn left on Paisano or continue onto Gateway Boulevard North.
  • Crews will be working on an overhead bridge deck.

Wednesday, September 11, and Thursday, September 12

Nightly from 9pm to 5am

  • Eastbound I-10 will be closed to all traffic at US 54.
  • DETOUR: Take Exit 22B (US 54/Alamogordo/Juárez/Fort Bliss) to northbound US 54, take Exit 23 (Cassidy Road/Fort Bliss), take Exit 22B (Pershing Drive), use the turnaround to enter southbound US 54 and follow signs to westbound I-10.
  • Crews will be working on an overhead bridge deck.
  • Ramp G which connects eastbound I-10 to Juárez will be closed to all traffic.
  • DETOUR: Take Exit 22B (US 54/Alamogordo/Juárez/Fort Bliss) to northbound US 54, take Exit 22B (Pershing Drive), use the turnaround to enter southbound US 54 and follow signs to Juárez.
  • Crews will be preparing parts of an existing ramp for demolition.

On-going traffic impacts which will continue during the week of September 8:

  • Ramp E which connects Gateway Boulevard South to southbound US 54 at Yandell Drive remains closed until further notice.
  • Ramp T which connects Gateway Boulevard North to northbound US 54 north of US 62 (Paisano Drive) remains closed until further notice.
  • Alternating complete closures of Durazno Avenue, Rosa Avenue and Uva Street.
  • Both turnarounds under US 54 at US 62 (Paisano Drive) remain closed until further notice.
  • Intermittent lane closures will be in place on US 54 between Loop 375 and Spur 601.
  • Intermittent lane closures will be in place on Gateway Boulevard East between Piedras Street and US 62/180 (Paisano Drive).
  • Intermittent lane closures will be in place on Gateway Boulevard West between Boone Street and Palm Street.
  • Lane closures are in place on eastbound and westbound SH 20 (Alameda Avenue) at US 54 until further notice.
  • Lane closures are in place on eastbound and westbound US 62 (Paisano Drive) between I-110 and US 54 until further notice.
  • Lane closures are in place on Ramp D which connects southbound US 54 to eastbound I-10 until further notice.
  • Lane closures are in place on Gateway Boulevard South between Findley Avenue and US 62 (Paisano Drive) until further notice.
  • All closures are subject to change due to weather or field conditions. On ramps and off ramps may close up to an hour before stated times. 

###

The Texas Department of Transportation is responsible for maintaining 80,000 miles of road and for supporting aviation, rail, and public transportation across the state. Through collaboration and leadership, we deliver a safe, reliable, and integrated transportation system that enables the movement of people and goods.  Find out more at TxDOT.gov. "Like" us on Facebook and follow us on Twitter.

Media Center