Connecting You With Texas
  • Family
  • Jobs
  • Education
  • Opportunities
  • Attractions
  • Entertainment
  • Wide Open Spaces
  • History
  • Quality of Life
  • Sports
  • Parks
  • Shopping
  • Services
  • People
  • Wildflowers
  • BBQ
  • Shores
  • Schools
  • Rodeos
  • Music
  • Tacos
  • Adventure
  • Trails
  • Traditions
  • Safely
  • Sunsets
  • Culture
  • Festivals
  • Friends
  • Life
  • Possibilities
  • Legends

 


Contact: Jennifer Wright

Phone: (915) 790-4340

Date: Nov. 12, 2020


27-HOUR CLOSURE

Sunday, Nov. 15, at 2 a.m. through Monday, Nov. 16, at 5 a.m.

  • I-110, the short freeway spur connecting US 54 to the Bridge of the Americas, will be closed to all traffic.
  • DETOUR: Access BOTA from eastbound Paisano Drive near the Chamizal.
  • Crews will begin demolishing overpasses.

Monday, Nov. 16, through Thursday, Nov. 19

Nightly from 9 p.m. to 5 a.m.

  • I-110, the short freeway spur connecting US 54 to the Bridge of the Americas, will be closed to all traffic.
  • DETOUR: Access BOTA from eastbound Paisano Drive near the Chamizal.
  • Crews will begin demolishing overpasses.

Thursday, Nov. 19, from 9 p.m. to 5 a.m.

  • Ramp H, which connect eastbound I-10 to northbound US 54, will be closed to all traffic
  • DETOUR: Take Exit 24A (Trowbridge Drive), use the newly widened turn around at Trowbridge Drive, enter westbound I-10, take Exit 22B (US 54/Alamogordo/Juárez/Fort Bliss).
  • Crews will be conducting electrical work.

PERMANENT CLOSURE

Beginning at 5 a.m. on Friday, Nov. 20, all access from US 62 (Paisano Drive) to the Bridge of the Americas will be permanently eliminated as part of the I-10 Connect Project. When the project is complete, all traffic bound from I-10 to Juárez via the Spaghetti Bowl will utilize new ramps directly connecting them to BOTA. Until those direct connector ramps are complete, all traffic bound from I-10 to BOTA will follow the “JUAREZ, MEXICO” detour signs on US 54 via the Pershing Drive Turnaround.

The Following Long-term Closures Will Continue Without Interruption Next Week:

  • Ramps F and G, which connect I-10 to Juárez at the Spaghetti Bowl, remain detoured through northbound US 54 to Pershing Drive until further notice.

§  US 62 (Paisano Drive) remains closed to thru traffic between San Marcial Street and Gateway Boulevard South.

  • Gateway Boulevard East remains closed adjacent to Lincoln Park until further notice.
  • The ramp from southbound US 54 to US 62 (Paisano Drive) remains closed until further notice.
  • Both turnarounds under US 54 at US 62 (Paisano Drive) remains closed until further notice.
  • Intermittent closures on Durazno Avenue, Rosa Avenue and Uva Street.
  • Lane closures will be in place on eastbound and westbound SH 20 (Alameda Avenue) at US 54 until further notice.
  • Lane closures will be in place on Ramp D, which connects southbound US 54 to eastbound I-10 until further notice.
  • Lane closures will be in place on Ramp H, which connects eastbound I-10 to northbound US 54, until further notice.
  • Intermittent lane closures on Gateway Boulevard East between Piedras Street and US 62/180 (Paisano Drive).
  • Intermittent lane closures on Gateway Boulevard West between Boone Street and Palm Street.

Onramp and offramp closures may begin up to one hour earlier than stated times. All information is subject to change based upon weather and field conditions.

###

The Texas Department of Transportation is responsible for maintaining 80,000 miles of road and for supporting aviation, maritime, rail, and public transportation across the state. Through collaboration and leadership, we deliver a safe, reliable, and integrated transportation system that enables the movement of people and goods.  Find out more at TxDOT.gov. "Like" us on Facebook and follow us on Twitter.

Media Center