Virtual Public Meeting with In-Person Option - Gulf Freeway PEL Study (I-45 from I-69/US 59 to Beltway 8 South)
Skip to main content
Texas Department of Transportation
Connecting You With Texas
  • Family
  • Jobs
  • Education
  • Opportunities
  • Attractions
  • Entertainment
  • Wide Open Spaces
  • History
  • Quality of Life
  • Sports
  • Parks
  • Shopping
  • Services
  • People
  • Wildflowers
  • BBQ
  • Shores
  • Schools
  • Rodeos
  • Music
  • Tacos
  • Adventure
  • Trails
  • Traditions
  • Safely
  • Sunsets
  • Culture
  • Festivals
  • Friends
  • Life
  • Possibilities
  • Legends

 

Virtual Public Meeting with In-Person Option - Gulf Freeway PEL Study (I-45 from I-69/US 59 to Beltway 8 South)


Where:

The virtual public meeting and in-person option dates and times indicated below.

When:

The pre-recorded presentation (in English and Spanish) will be posted on this page on Tuesday, July 12, 2022, at 5 p.m.

Additionally, TxDOT is providing two in-person options for individuals who would like to participate in-person instead of online. In-person attendees will be able to view the same presentation and materials delivered in the online public meeting, which will be playing on a screen, review hard copies of project materials, ask questions of TxDOT staff, and leave written comments. The in-person option will be held on the following dates and locations:

Purpose:

The purpose of the public meeting is to present the Planning and Environmental Linkages study to the public and receive comments. The Gulf Freeway PEL Study is being conducted on I-45 S from I-69 / US 59 (Downtown) to Beltway 8 in Harris County, Texas. Comments must be received on or before Friday, July 29, 2022, to be a part of the official meeting record.

Description:

The Gulf Freeway PEL Study is exploring transportation alternatives to address the growing safety, mobility, multimodal, and infrastructure needs along the corridor due to the projected population and employment growth in the Houston metropolitan area. This will be accomplished by building on previously completed planning studies, evaluating existing conditions, projecting future conditions, and assessing how various alternatives can address issues related to growth, congestion, mobility, safety, connectivity, freight, and asset management in the study corridor. The study corridor has been identified as a 14-mile stretch of I-45 South from I-69 / US 59 in Downtown Houston to BW 8 South. No changes will be made to the existing roadway at this time. 

Special Accommodations:

TxDOT makes every reasonable effort to accommodate the needs of the public. The virtual public meeting presentation will be in English and Spanish. If you have a special communication accommodation or need for an interpreter, a request can be made. If you have a disability and need assistance, special arrangements can also be made to accommodate most needs. Please call TxDOT’s Environmental Coordinator at (713) 802-5262 no later than 4 p.m. on Thursday, July 7, 2022 to request special accommodations. Please be aware that advance notice is requested as some accommodations may require time for TxDOT to arrange.

Memorandum of Understanding:

The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated Dec. 9, 2019, and executed by FHWA and TxDOT.

Contact:

Reference the following project numbers: CSJ 0500-03-633 
TxDOT Houston District
Public Information Office
P.O. Box 1386
Houston, Texas 77251
(713) 802-5076

Email

Posted: June 13, 2022

 

Copyright 2022  •  Texas Department of Transportation  •  All Rights Reserved  •  Disclaimer  •  Privacy & Security Policy  •  Accessibility
125 East 11th Street  •  Austin, Texas 78701