Virtual Public Meeting with In-Person Option - FM 546 Phase II Corridor Study
Skip to main content
Texas Department of Transportation
Connecting You With Texas
  • Family
  • Jobs
  • Education
  • Opportunities
  • Attractions
  • Entertainment
  • Wide Open Spaces
  • History
  • Quality of Life
  • Sports
  • Parks
  • Shopping
  • Services
  • People
  • Wildflowers
  • BBQ
  • Shores
  • Schools
  • Rodeos
  • Music
  • Tacos
  • Adventure
  • Trails
  • Traditions
  • Safely
  • Sunsets
  • Culture
  • Festivals
  • Friends
  • Life
  • Possibilities
  • Legends

 


Where:

The virtual public meeting will be posted here on Tuesday, April 12, 2022, at 5:30 p.m. and remain online through Wednesday, April 27, 2022, at 11:59 p.m. Please note, this is not a live event. The materials can be viewed at your convenience.

Additionally, TxDOT is providing an in-person meeting option for individuals who would like to participate in person instead of online. In-person attendees will be able to review the same materials and presentation as the online public meeting.     

When:

Virtual Meeting
Tuesday, April 12, 2022, at 5:30 p.m. and remain online through Wednesday, April 27, 2022 at 11:59 p.m.

In-person Meeting
Tuesday, April 12, 2022
5:30 p.m. to 7:30 p.m.
Sheraton McKinney Hotel
Throckmorton Ballroom
1900 Gateway Boulevard
McKinney, TX 75070

Purpose:

Collin County in collaboration with TxDOT is proposing to reconstruct and widen FM 546 from Airport Drive in McKinney to CR 393 in Lowry Crossing. 

Description:

The improvements along FM 546 include constructing a four-lane divided urban arterial roadway with pedestrian accommodations. The median would allow for future expansion to a six-lane roadway. The eastern portion of the project would reconstruct the existing FM 546, a two-lane rural arterial roadway. The western portion of the project would realign and construct a new FM 546 corridor. This corridor was established in the 2014 Update of the Collin County Mobility Plan to improve future mobility in central Collin County and to improve the east-west connectivity to US 380. The FM 546 corridor was divided into two parts, the eastern segment (FM 546/CR 400 Phase I) from CR 393 to US 380 and the western segment (FM 546 Phase II) from Airport Drive to CR 393. This public meeting will focus on FM 546 Phase II from Airport Drive to CR 393.

Special Accommodations:

The in-person public meeting and virtual public meeting will be conducted in English. If you need an interpreter or document translator because English is not your primary language or you have difficulty communicating effectively in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or are a person with a disability who requires an accommodation to attend and participate in the virtual public meeting or in-person option, please contact Leigh Hornsby, Project Public Involvement, at (214) 551-5401 no later than 4 p.m., Tuesday, April 5, 2022. Please be aware that advance notice is required as some services and accommodations may require time for Collin County and TxDOT to arrange.

Memorandum of Understanding:

The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated Dec. 9, 2019, and executed by the Federal Highway Administration and TxDOT.

Downloads:

Contact:

TxDOT Dallas District
Public Information Office
(214) 320-4480
Email

Posted: March 23, 2022

 

Copyright 2022  •  Texas Department of Transportation  •  All Rights Reserved  •  Disclaimer  •  Privacy & Security Policy  •  Accessibility
125 East 11th Street  •  Austin, Texas 78701