TxDOT is seeking qualifications statements (QS) from teams interested in entering into a Design-Build Contract (DBC) in response to a RFQ to develop, design, construct, and potentially maintain approximately 7.0 miles of non-tolled improvements along US 290 from approximately the east end of Circle Drive to Loop 1 (Mopac) and non-tolled improvements along SH 71 from US 290 to Silvermine Drive, including the reconstruction of the US 290 and SH 71 interchange in Austin and southwest Travis County.

Qualification Teams  On Nov. 14, 2018, TxDOT posted the list of qualification teams and their equity members for the Oak Hill Parkway Project.

Legal Disclaimer  The following documents are provided as reference information only project documents. The information contained in these documents reflects information as of any date or time identified therein. TxDOT has not determined whether the project documents are accurate, complete, pertinent, or of any other value to potential developers. TxDOT makes no representation, warranty or guarantee as to, and shall not be responsible for, the accuracy, completeness, or pertinence of the project documents, and, in addition, shall not be responsible for any interpretations thereof or conclusions drawn therefrom. The statements made in the project documents that are not purely historical are forward-looking statements, including TxDOT's hopes, intentions or strategies regarding the future. These statements are based on information currently available to TxDOT and TxDOT assumes no obligation to update any such forward-looking statements.

Request for Qualifications (RFQ) Documents - Oak Hill Parkway Project

Title Format
Cover Letter
RFQ Issued Document (10/12/18)
Design-Build Contract (DBC) Term Sheet
Forms
Reference Information Documents (RID)
Addendum 1 – Issued 10/26/18  
Cover Letter Cover Letter PDF
Addendum 1 Addendum 1 PDF
Addendum 1 Redline Addendum 1 Redline PDF
Forms Forms
Questions and Answers (Q&A) Matrix  
Matrix #1 – 10/26/18 Matrix #1 – 10/26/18 PDF
Industry Workshops  
Presentation - 10/11/18
Workshop Presentation PDF
Sign-in Sheet - 10/11/18
Workshop Sign-in PDF

RFQ Shortlist Teams

On Dec. 13, 2018, TxDOT announced the shortlist of the most qualified teams to compete for the Oak Hill Parkway Project Design-Build Contract. The teams are invited to submit a detailed proposal.

Texas Transportation Commission Meeting PDF
Presentation
Agenda
Name Score Team Members
Colorado River Constructors 80.2
Hill Country Infrastructure 72.1
Granite-Austin Joint Venture 57.7
Flatiron-Lane Oak Hill Joint Venture 55.9

More Information