TxDOT is seeking qualifications statements (QS) from teams interested in entering into a Design-Build Contract (DBC) in response to a RFQ to design, develop, construct, and potentially maintain approximately 7.8 miles of improvements along I-2 from just west of 2nd Street to just east of FM 2557 (S. Stewart Road) and along I-69C from Nolana Loop to I-2 in the cities of McAllen, Pharr, and San Juan, in Hidalgo County (I-2/I-69C Interchange Project).

Qualification Teams – On Aug. 7, 2018, TxDOT posted the list of qualification teams and their equity members for the I-2/I-69C Interchange Project.

Legal Disclaimer – The following documents are provided as reference information only project documents. The information contained in these documents reflects information as of any date or time identified therein. TxDOT has not determined whether the project documents are accurate, complete, pertinent, or of any other value to potential developers. TxDOT makes no representation, warranty or guarantee as to, and shall not be responsible for, the accuracy, completeness, or pertinence of the project documents, and, in addition, shall not be responsible for any interpretations thereof or conclusions drawn therefrom. The statements made in the project documents that are not purely historical are forward-looking statements, including TxDOT's hopes, intentions or strategies regarding the future. These statements are based on information currently available to TxDOT and TxDOT assumes no obligation to update any such forward-looking statements.

Request for Qualifications (RFQ) Documents – I-2/I-69C Interchange

Title Format
Cover Letter
RFQ Issued Document (06/08/18)
Design-Build Contract (DBC) Term Sheet
Capital Maintenance Contract (CMC) Term Sheet
Forms
Reference Information Documents (RID)
Addendum 1 - Issued 06/28/18  
Cover Letter
Addendum 1
Addendum 1 - Redline
Forms
Addendum 2 - Issued 07/27/18  
Cover Letter
Addendum 2
Addendum 2 - Redline
Forms
Industry Workshops  
Presentation - 06/19/18
Sign-in Sheet - 06/19/18

RFQ Shortlist Teams

On Aug. 30, 2018, TxDOT announced the shortlist of the most qualified teams to compete for the I-2/I-69C Interchange Project Design-Build Contract. The teams are invited to submit a detailed proposal.

Texas Transportation Commission Meeting PDF
Presentation
Agenda
Name Score Team Members
Austin | Sundt 75.4
Dragados-Pulice 53.0
I-2 Connector 47.3

More Information
I-2/I-69C Interchange

Divisions