CapEx Central Downtown Project – Pre-Procurement Information
Skip to main content
Texas Department of Transportation
Connecting You With Texas
  • Family
  • Jobs
  • Education
  • Opportunities
  • Attractions
  • Entertainment
  • Wide Open Spaces
  • History
  • Quality of Life
  • Sports
  • Parks
  • Shopping
  • Services
  • People
  • Wildflowers
  • BBQ
  • Shores
  • Schools
  • Rodeos
  • Music
  • Tacos
  • Adventure
  • Trails
  • Traditions
  • Safely
  • Sunsets
  • Culture
  • Festivals
  • Friends
  • Life
  • Possibilities
  • Legends

 


TxDOT intends to hold a Pre-Procurement Partnering Industry Workshop on Aug. 15, 2022, at 1:30 pm (CT) with industry partners to share information related to the development, procurement, and implementation of the CapEx Central Downtown Project. The workshop will be held in-person at the TxDOT Greer Building located at 125 East 11th Street, Austin, Texas.

TxDOT also intends to hold Pre-Procurement Partnering one-on-one meetings with prime contractors and design-build teams to discuss the development, procurement, and implementation of the Project. The meetings will be held in Austin the week of Sept. 12, 2022.

Attendance at the workshop and one-on-one meetings is not mandatory and interested parties shall remain eligible to participate in future project solicitations if they do not attend the workshop. TxDOT is holding the workshop solely to share and obtain information. It does not represent a commitment to issue a Request for Qualifications or a Request for Proposals in the future.

Legal Disclaimer – The following documents are provided as reference information only project documents. The information contained in these documents reflects information as of any date or time identified therein. TxDOT has not determined whether the project documents are accurate, complete, pertinent, or of any other value to potential design-build contractors. TxDOT makes no representation, warranty or guarantee as to, and shall not be responsible for, the accuracy, completeness, or pertinence of the project documents, and, in addition, shall not be responsible for any interpretations thereof or conclusions drawn therefrom. The statements made in the project documents that are not purely historical are forward-looking statements, including TxDOT’s hopes, intentions, or strategies regarding the future. These statements are based on information currently available to TxDOT and TxDOT assumes no obligation to update any such forward-looking statements.

The environmental review process under the National Environmental Policy Act for this project is ongoing, and no final decision has been made regarding selection of an alternative for this project.  The final decision on an alternative for construction will be made in the Record of Decision. Any schematic preparation or other pre-final design development of any alternative under consideration in the National Environmental Policy Act process does not constitute final design, which cannot occur until after the Record of Decision has been issued (see 23 CFR 771.113(a)). Further, any schematic preparation or other pre-final design development of any alternative will not influence the environmental review process for the project, including the decision on need to construct the project, the consideration of any alternatives for the project required by applicable law, and the selection of the design or location for the project.

Pre-Procurement Workshop Documents (07/26/22) Format
Invitation
Pre-Procurement Information Documents Format
Project Status Summary
Draft Design-Build Contract Term Sheet
Draft Capital Maintenance Contract Term Sheet