***** OFFICIAL NOTICE ***** *** STATE LET MAINTENANCE CONTRACT *** COUNTY: LEON HIGHWAY: FM1469 LENGTH: 5.809 MI CONTROL NUMBER: 6241-93-001 SBE GOAL: 0.0 % PROJECT NUMBER: RMC - 624193001 TYPE: ROADWAY RESTORATION TIME FOR COMPLETION: 94 WORKING DAYS GUARANTY: 35,000.00 BIDS RECEIVED UNTIL: 1:00 PM December 4, 2012 * EST.COST: 1,755,195.88 BIDS WILL BE OPENED: 1:00 PM December 4, 2012 MAIL OR DELIVER BIDS TO: FOR QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATION BAHM, MICHAEL AUSTIN HQ - RIVERSIDE ANNEX 2800 COMMERCE ST. E. 200 E RIVERSIDE ROOM 1B.1 BUFFALO TX 75831 AUSTIN TX 78704-1204 (903)322-4648 (512)416-2498 LIMITS FROM: FM 1146 LIMITS TO: FM 1512 ------------------------------------------------------------------------------ ITEM DES S.P APPROXIMATE ALT NO. CD. NO. ITEM DESCRIPTION UNIT QUANTITIES ------------------------------------------------------------------------------ 110 2001 EXCAVATION (ROADWAY) CY 695.000 112 2002 SUBGRADE WIDENING (DENS CONT) STA 300.730 134 2002 BACKFILL (TY B) STA 306.730 150 2001 BLADING STA 306.730 164 2033 002 DRILL SEEDING (PERM) (RURAL) (SANDY) SY 40,898.000 164 2041 002 DRILL SEEDING (TEMP) (WARM) SY 20,451.000 164 2043 002 DRILL SEEDING (TEMP) (COOL) SY 20,451.000 168 2001 VEGETATIVE WATERING MG 409.000 247 2350 036 FL BS (CMP IN PLC) (TY A GR 2) (4") SY 86,877.000 251 2001 REWORK BS MTL (TY A) (6") (ORD COMP) STA 300.730 275 2001 003 CEMENT TON 1,664.000 275 2006 003 CEMENT TREAT (EXIST MATL) (10") SY 59,757.000 275 2011 003 CEMENT TREAT(EXIST MATL)(8") SY 36,041.000 276 2238 CEM TRT(PLNT MX)(CL N)(TY E)(GR 4)(12") SY 2,156.000 316 2015 016 ASPH (RC-250) GAL 17,780.000 316 2406 016 AGGR (TY-B GR-5 OR TY-L GR-5 SAC-B) CY 659.000 316 2706 016 ASPH (TIER II) GAL 32,017.000 316 2718 016 AGGR (TIER II) CY 712.000 500 2001 005 MOBILIZATION LS 1.000 502 2001 033 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 530 2008 003 DRIVEWAYS (ACP) EA 13.000 530 2009 003 DRIVEWAYS (SURF TREAT) EA 6.000 530 2015 003 TURNOUTS (SURF TREAT) EA 28.000 530 2058 003 DRIVEWAYS (OTHER) EA 39.000 560 2007 001 MAILBOX INSTALL-D (TWW-POST)TY 4 FND-TB EA 4.000 560 2015 001 MAILBOX INSTALL-S(TWW-POST)TY 4 FND-TB EA 24.000 662 2015 WK ZN PAV MRK NON-REMOV (W) 18" (SLD) LF 1,532.000 662 2030 WK ZN PAV MRK NON-REMOV (Y) 4" (BRK) LF 3,849.000 662 2032 WK ZN PAV MRK NON-REMOV (Y) 4" (SLD) LF 44,336.000 666 2012 REFL PAV MRK TY I (W) 4" (SLD)(100MIL) LF 57,650.000 666 2105 REFL PAV MRK TY I (Y) 4" (BRK)(100MIL) LF 3,849.000 666 2111 REFL PAV MRK TY I (Y) 4" (SLD)(100MIL) LF 44,336.000 672 2015 034 REFL PAV MRKR TY II-A-A EA 745.000 1122 2001 001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 1,325.000 1122 2009 001 ROCK FILTER DAMS (REMOVE) LF 1,325.000 1122 2037 001 TEMPORARY SEDIMENT CONTROL FENCE INSTLL LF 4,910.000 1122 2057 001 TEMPORARY SEDIMENT CONTROL FENCE REMOVE LF 4,910.000 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT (NON-PART) $ 1,420.00