***** OFFICIAL NOTICE ***** *** STATE LET CONSTRUCTION CONTRACT *** COUNTY: DICKENS HIGHWAY: SH 208 LENGTH: 3.079 MI CONTROL NUMBER: 2011-01-008 DBE GOAL: 3.0 % PROJECT NUMBER: STP 2008(358) TYPE: REHABILITATION OF EXISTING ROADWAY TIME FOR COMPLETION: 171 WORKING DAYS GUARANTY: 25,000.00 BIDS RECEIVED UNTIL: 1:00 PM December 5, 2012 * EST.COST: 1,274,119.25 BIDS WILL BE OPENED: 1:00 PM December 5, 2012 MAIL OR DELIVER BIDS TO: FOR QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATION MIZER, GARY AUSTIN HQ - RIVERSIDE ANNEX P.O. BOX 349 200 E RIVERSIDE ROOM 1B.1 MUNDAY TX 76371 AUSTIN TX 78704-1204 (940)422-4350 (512)416-2498 LIMITS FROM: SH 70, S. LIMITS TO: KENT C/L ------------------------------------------------------------------------------ ITEM DES S.P APPROXIMATE ALT NO. CD. NO. ITEM DESCRIPTION UNIT QUANTITIES ------------------------------------------------------------------------------ 112 2002 SUBGRADE WIDENING (DENS CONT) STA 162.600 134 2002 BACKFILL (TY B) STA 162.600 150 2002 BLADING HR 10.000 164 2034 002 DRILL SEEDING (PERM) (RURAL) (SANDY) AC 11.200 164 2042 002 DRILL SEEDING (TEMP) (WARM) AC 5.600 164 2044 002 DRILL SEEDING (TEMP) (COOL) AC 5.600 168 2001 VEGETATIVE WATERING MG 437.000 314 2013 EMULS ASPH (EROSN CONT)(CSS-1H) GAL 10,842.000 401 2001 FLOWABLE BACKFILL CY 7.000 430 2009 CL C CONC FOR EXT STRU(CULV)(6'X 3') LF 60.000 430 2012 CL C CONC FOR EXT STRU (CULV)(3'X 2') LF 11.000 430 2023 CL C CONC FOR EXT STRU (CULV)(5' X 3') LF 10.000 432 2030 RIPRAP (CONC)(CL C) CY 27.400 462 2007 015 CONC BOX CULV (5 FT X 3 FT) LF 80.000 467 2101 SET (TY I)(S= 3 FT)(HW= 3 FT)(4:1)(C) EA 2.000 467 2114 SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1)(C) EA 6.000 467 2120 SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1)(C) EA 12.000 480 2001 CLEAN EXIST CULVS EA 4.000 500 2001 011 MOBILIZATION LS 1.000 502 2001 033 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 8.000 644 2056 RELOCATE SM RD SN SUP & AM TY 10BWG EA 21.000 658 2328 REMOVE DELIN & OBJECT MARKERS ASSMS EA 12.000 658 2342 INSTL OM ASSM (OM-2X) (FLX) (GND) EA 12.000 662 2115 WK ZN PAV MRK SHT TERM (TAB) TY Y-2 EA 1,169.000 672 2015 034 REFL PAV MRKR TY II-A-A EA 215.000 1122 2016 001 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 250.000 1122 2019 001 CONSTRUCTION EXITS (REMOVE) SY 250.000 1122 2049 001 BIOGRD EROSN CONT LOGS (18" DIA)INSTALL LF 640.000 1122 2056 001 BIODEGRADBLE EROSION CONTROL LOGS REMOV LF 640.000 3224 2085 D-GR HMA(QCQA) TY-D SAC-A PG 76-28 TON 4,975.000 3224 2087 D-GR HMA (QCQA)TY-B PG 76-28 TON 4,670.000 5369 2001 CENTERLINE TEXTURING STA 169.800 8251 2006 005 RE PM W/RET REQ TY I(W)4"(SLD)(100MIL) LF 34,460.000 8251 2015 005 RE PM W/RET REQ TY I(Y)4"(BRK)(100MIL) LF 4,163.000 8251 2018 005 RE PM W/RET REQ TY I(Y)4"(SLD)(100MIL) LF 8,413.000 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $ 1,000.00