Detail Letting Schedule for Comal County (FY 2023)

Last Update: Friday, June 24, 2022

Bid Tabulations Dashboard

Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months.

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Comal County (FY 2023)

CCSJ: 0016-05-122

District:SAN ANTONIOLet Date:Oct 2022
Highway:IH 35Let Status:Approved
Project ID:C 16-5-122CSJ:0016-05-122
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:SOLMS ROADFund Cat:1
Limits To:WALNUT STREETESTIMATE:$102,333
Length:3.1Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:IH 35Let Status:Approved
Project ID:C 16-5-123CSJ:0016-05-123
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:SOLMS RD.Fund Cat:1
Limits To:SL 337ESTIMATE:$56,012
Length:1.2Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:IH 10Let Status:Approved
Project ID:C 72-6-85CSJ:0072-06-085
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:AUSTIN DR SOUTHFund Cat:1
Limits To:FREDERICK CREEKESTIMATE:$55,053
Length:1.7Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:IH 10Let Status:Approved
Project ID:C 72-6-86CSJ:0072-06-086
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:IH 10 WB EXIT RAMPFund Cat:1
Limits To:JOHN'S ROADESTIMATE:$2,267
Length:1.1Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:IH 10Let Status:Approved
Project ID:C 72-6-87CSJ:0072-06-087
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:BOERNE CITY PARK ENTRANCEFund Cat:1
Limits To:JOHN'S ROADESTIMATE:$23,087
Length:0.5Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:SH 41Let Status:Approved
Project ID:C 201-7-17CSJ:0201-07-017
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:KERR/REAL COUNTY LINEFund Cat:1
Limits To:3.3 MI E OF FM 1340ESTIMATE:$209,848
Length:11.0Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:SH 41Let Status:Approved
Project ID:C 201-7-18CSJ:0201-07-018
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:3.3 MI E OF FM 1340Fund Cat:1
Limits To:0.33 MI W OF HENRY PRIOUR RANCH ROADESTIMATE:$319,800
Length:7.0Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:SH 41Let Status:Approved
Project ID:C 201-8-24CSJ:0201-08-024
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:0.33 MI W OF HENRY PRIOURFund Cat:1
Limits To:IH 10ESTIMATE:$595,032
Length:12.0Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 466Let Status:Approved
Project ID:C 216-3-35CSJ:0216-03-035
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:US 90Fund Cat:1
Limits To:FM 477ESTIMATE:$125,909
Length:3.8Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 117Let Status:Approved
Project ID:C 236-1-23CSJ:0236-01-023
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:US 83Fund Cat:1
Limits To:UVALDE/ZAVALA COUNTY LINEESTIMATE:$280,284
Length:8.7Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:SH 173Let Status:Approved
Project ID:C 421-7-15CSJ:0421-07-015
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:MEDINA RIVER BRIDGEFund Cat:1
Limits To:BANDERA/MEDINA COUNTY LINEESTIMATE:$299,552
Length:7.2Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:SH 173Let Status:Approved
Project ID:C 609-1-23CSJ:0609-01-023
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:SH 16Fund Cat:1
Limits To:CAMP MEETING CREEKESTIMATE:$110,732
Length:1.6Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:RM 187Let Status:Approved
Project ID:C 678-1-34CSJ:0678-01-034
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:UVALDE/BANDERA COUNTY LINEFund Cat:1
Limits To:SH 127ESTIMATE:$685,666
Length:21.1Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 1023Let Status:Approved
Project ID:C 678-3-15CSJ:0678-03-015
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:US 90Fund Cat:1
Limits To:FM 1049ESTIMATE:$323,192
Length:10.0Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 1340Let Status:Approved
Project ID:C 829-4-34CSJ:0829-04-034
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:SH 41Fund Cat:1
Limits To:SH 39ESTIMATE:$698,876
Length:21.3Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 306Let Status:Approved
Project ID:C 857-1-38CSJ:0857-01-038
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:FM 3424Fund Cat:1
Limits To:.085 MI S OF N PARK ROADESTIMATE:$151,217
Length:3.1Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 140Let Status:Approved
Project ID:C 875-1-19CSJ:0875-01-019
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:FM 117Fund Cat:1
Limits To:UVALDE/ZAVALA COUNTY LINEESTIMATE:$638,882
Length:16.9Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 1049Let Status:Approved
Project ID:C 1168-2-17CSJ:1168-02-017
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:SH 127Fund Cat:1
Limits To:US 90ESTIMATE:$398,040
Length:0.0Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 1049Let Status:Approved
Project ID:C 1168-3-14CSJ:1168-03-014
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:US 90Fund Cat:1
Limits To:FM 1023ESTIMATE:$161,960
Length:4.0Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:RM 1050Let Status:Approved
Project ID:C 1169-1-27CSJ:1169-01-027
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:US 83Fund Cat:1
Limits To:RM 187ESTIMATE:$396,056
Length:14.7Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 306Let Status:Approved
Project ID:C 1728-2-64CSJ:1728-02-064
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:0.85 MI SOUTH OF N PARK ROADFund Cat:1
Limits To:GRUENE HAVENESTIMATE:$277,725
Length:8.6Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 2369Let Status:Approved
Project ID:C 2175-1-16CSJ:2175-01-016
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:US 90 WESTFund Cat:1
Limits To:SPUR 144ESTIMATE:$296,826
Length:6.5Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 2369Let Status:Approved
Project ID:C 2175-2-14CSJ:2175-02-014
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:SPUR 144Fund Cat:1
Limits To:US 90 EASTESTIMATE:$201,860
Length:4.4Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 539Let Status:Approved
Project ID:C 2233-2-7CSJ:2233-02-007
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:FM 467Fund Cat:1
Limits To:GUADALUPE/WILSON COUNTY LINEESTIMATE:$119,853
Length:3.7Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 1023Let Status:Approved
Project ID:C 2563-1-10CSJ:2563-01-010
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:FM 2369Fund Cat:1
Limits To:US 90ESTIMATE:$54,243
Length:1.7Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 2438Let Status:Approved
Project ID:C 2651-1-11CSJ:2651-01-011
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:US 90Fund Cat:1
Limits To:US 90AESTIMATE:$197,348
Length:6.1Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 3009Let Status:Approved
Project ID:C 3107-1-44CSJ:3107-01-044
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:SH 46Fund Cat:1
Limits To:BAT CAVE LOOPESTIMATE:$397,678
Length:9.2Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 3351Let Status:Approved
Project ID:C 3212-3-19CSJ:3212-03-019
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:RM 473Fund Cat:1
Limits To:SH 46ESTIMATE:$412,221
Length:0.0Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 1403Let Status:Approved
Project ID:C 3253-1-9CSJ:3253-01-009
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:SH 55Fund Cat:1
Limits To:FM 2369ESTIMATE:$9,931
Length:0.0Actual$0
 
Back...
Totals for 0016-05-122
Length:190.2
Estimate:$7,601,483
Actual:

CCSJ: 0016-19-025

District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 482Let Status:Approved
Project ID:C 16-19-25CSJ:0016-19-025
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:IH 35 NFund Cat:1
Limits To:IH 35 SESTIMATE:$242,524
Length:7.5Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:IH 35Let Status:Approved
Project ID:C 17-2-79CSJ:0017-02-079
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:IH 410Fund Cat:1
Limits To:NEW LAREDO HIGHWAYESTIMATE:$13,116
Length:0.3Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:IH 35Let Status:Approved
Project ID:C 17-9-107CSJ:0017-09-107
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:IH 410Fund Cat:1
Limits To:SOMERSET ROADESTIMATE:$88,732
Length:2.6Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:IH 35Let Status:Approved
Project ID:C 17-9-108CSJ:0017-09-108
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:NEW LAREDO HIGHWAYFund Cat:1
Limits To:SOMERSET ROADESTIMATE:$71,245
Length:2.6Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:SH 132Let Status:Approved
Project ID:C 17-14-19CSJ:0017-14-019
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:MEDINA/ATASCOSA COUNTY LINEFund Cat:1
Limits To:FM 471 (WALTON ST.)ESTIMATE:$232,368
Length:3.9Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:US 90Let Status:Approved
Project ID:C 24-6-68CSJ:0024-06-068
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:CR 4643 (DUNLAY RD)Fund Cat:1
Limits To:FM 1343ESTIMATE:$457,316
Length:5.4Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:IH 37Let Status:Approved
Project ID:C 73-5-73CSJ:0073-05-073
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:1.4 NI N OF FM 791Fund Cat:1
Limits To:0.5 MI N OF PULLIN ROADESTIMATE:$313,060
Length:10.7Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:IH 37Let Status:Approved
Project ID:C 73-10-54CSJ:0073-10-054
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:CASAREZ ROADFund Cat:1
Limits To:SH 97ESTIMATE:$77,776
Length:2.6Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:IH 37Let Status:Approved
Project ID:C 73-10-55CSJ:0073-10-055
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:SH 97Fund Cat:1
Limits To:END FRONTAGE ROADESTIMATE:$69,464
Length:2.4Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:IH 37Let Status:Approved
Project ID:C 73-10-56CSJ:0073-10-056
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:0.5 MI N OF PULLIN ROADFund Cat:1
Limits To:SS 199 (LEAL ROAD)ESTIMATE:$58,304
Length:1.9Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:IH 37Let Status:Approved
Project ID:C 73-10-57CSJ:0073-10-057
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:ATASCOSA RIVERFund Cat:1
Limits To:CORGEY ROADESTIMATE:$24,936
Length:0.9Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:IH 37Let Status:Approved
Project ID:C 73-10-58CSJ:0073-10-058
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:US 281NFund Cat:1
Limits To:0.5 MI N OF PULLIN ROADESTIMATE:$112,244
Length:1.5Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:IH 37Let Status:Approved
Project ID:C 73-10-59CSJ:0073-10-059
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:0.5 MI N OF PULLIN ROADFund Cat:1
Limits To:US 281 SOUTHESTIMATE:$220,825
Length:1.4Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:US 87Let Status:Approved
Project ID:C 143-3-50CSJ:0143-03-050
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:BEXAR/WILSONCOUNTY LINEFund Cat:1
Limits To:POST OAK RD.ESTIMATE:$514,216
Length:7.6Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:US 87Let Status:Approved
Project ID:C 143-4-69CSJ:0143-04-069
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:FM 539Fund Cat:1
Limits To:FM 538ESTIMATE:$298,580
Length:9.2Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:US 57Let Status:Approved
Project ID:C 276-7-32CSJ:0276-07-032
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:FM 140Fund Cat:1
Limits To:IH 35ESTIMATE:$550,265
Length:13.1Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:SH 97Let Status:Approved
Project ID:C 328-2-45CSJ:0328-02-045
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:BU 181Fund Cat:1
Limits To:US 181ESTIMATE:$20,726
Length:0.6Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 541Let Status:Approved
Project ID:C 366-9-33CSJ:0366-09-033
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:US 181Fund Cat:1
Limits To:SH 123ESTIMATE:$327,305
Length:10.1Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 462Let Status:Approved
Project ID:C 848-1-42CSJ:0848-01-042
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:FM 2200Fund Cat:1
Limits To:FRIO/MEDINA COUNTY LINEESTIMATE:$232,733
Length:5.4Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 463Let Status:Approved
Project ID:C 849-6-7CSJ:0849-06-007
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:SH 132Fund Cat:1
Limits To:IH 35ESTIMATE:$34,732
Length:0.0Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 3432Let Status:Approved
Project ID:C 850-4-30CSJ:0850-04-030
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:WILSON/BEXAR COUNTY LINEFund Cat:1
Limits To:FM 775ESTIMATE:$131,511
Length:4.1Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 1334Let Status:Approved
Project ID:C 853-3-6CSJ:0853-03-006
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:US 281Fund Cat:1
Limits To:.15 MI E JOE K. WILLIAMS ROADESTIMATE:$40,027
Length:1.2Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 537Let Status:Approved
Project ID:C 1009-2-19CSJ:1009-02-019
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:US 181Fund Cat:1
Limits To:FM 1922ESTIMATE:$192,469
Length:0.0Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 2252Let Status:Approved
Project ID:C 1433-2-48CSJ:1433-02-048
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:FM 482Fund Cat:1
Limits To:FM 3009ESTIMATE:$94,885
Length:2.9Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 1346Let Status:Approved
Project ID:C 1437-2-17CSJ:1437-02-017
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:US 87Fund Cat:1
Limits To:FM 775ESTIMATE:$35,328
Length:0.7Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 3499Let Status:Approved
Project ID:C 1479-2-5CSJ:1479-02-005
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:FM 1937Fund Cat:1
Limits To:LP 1604ESTIMATE:$18,418
Length:0.5Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 1582Let Status:Approved
Project ID:C 1500-1-26CSJ:1500-01-026
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:SPUR 581Fund Cat:1
Limits To:SH 85ESTIMATE:$348,020
Length:9.9Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 1937Let Status:Approved
Project ID:C 2255-1-86CSJ:2255-01-086
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:US 281Fund Cat:1
Limits To:LP 1604ESTIMATE:$217,135
Length:6.7Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 624Let Status:Approved
Project ID:C 2373-2-18CSJ:2373-02-018
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:LASALLE/MCMULLEN COUNTY LINEFund Cat:1
Limits To:SH 16ESTIMATE:$551,147
Length:14.0Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 624Let Status:Approved
Project ID:C 2373-3-16CSJ:2373-03-016
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:SH 16Fund Cat:1
Limits To:MCMULLEN/LIVE OAK COUNTY LINEESTIMATE:$635,709
Length:16.1Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 2536Let Status:Approved
Project ID:C 2440-1-26CSJ:2440-01-026
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:LP 1604Fund Cat:1
Limits To:IH 410ESTIMATE:$128,662
Length:3.9Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 2537Let Status:Approved
Project ID:C 2441-1-13CSJ:2441-01-013
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:PLEASANTON ROADFund Cat:1
Limits To:US 281ESTIMATE:$48,770
Length:1.5Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 775Let Status:Approved
Project ID:C 3440-1-14CSJ:3440-01-014
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:FM 3432Fund Cat:1
Limits To:FM 1303ESTIMATE:$340,485
Length:0.0Actual$0
 
District:SAN ANTONIOLet Date:Oct 2022
Highway:FM 3510Let Status:Approved
Project ID:C 3576-1-5CSJ:3576-01-005
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:FM 3351Fund Cat:1
Limits To:SH 97ESTIMATE:$58,221
Length:1.5Actual$0
 
Back...
Totals for 0016-19-025
Length:152.7
Estimate:$6,801,254
Actual:

CCSJ: 0915-17-076

District:SAN ANTONIOLet Date:May 2023
Highway:VALet Status:Tentative
Project ID:STP ()TPCSJ:0915-17-076
Description:CONSTRUCT PEDESTRIAN INFRASTRUCTUREHandling
Code:
LC
Limits From:IN NEW BRAUNFELS ON COMMON ST.Fund Cat:3
Limits To:FROM LIBERTY AVE. TO SH 46/LP 337ESTIMATE:$1,321,637
Length:0.0Actual$0
 
Back...
Totals for 0915-17-076
Length:0
Estimate:$1,321,637
Actual:

CCSJ: 1433-02-044

District:SAN ANTONIOLet Date:May 2023
Highway:FM 2252Let Status:Tentative
Project ID:STP ()MMCSJ:1433-02-044
Description:WIDEN ROAD - ADD LANESHandling
Code:
 
Limits From:BEXAR/COMAL COUNTY LINEFund Cat:1
Limits To:FM 3009ESTIMATE:$37,400,000
Length:2.7Actual$0
 
District:SAN ANTONIOLet Date:May 2023
Highway:FM 2252Let Status:Tentative
Project ID:STP ( )CSJ:1433-01-028
Description:WIDEN ROAD - ADD LANESHandling
Code:
 
Limits From:EVANS ROADFund Cat:11
Limits To:COMAL/BEXAR COUNTY LINEESTIMATE:$500,000
Length:0.1Actual$0
 
Back...
Totals for 1433-02-044
Length:2.8
Estimate:$37,900,000
Actual:

CCSJ: 1728-02-065

District:SAN ANTONIOLet Date:Jul 2023
Highway:FM 306Let Status:Tentative
Project ID:STP ()MMCSJ:1728-02-065
Description:BICYCLE AND PEDESTRIAN IMPROVEMENTSHandling
Code:
 
Limits From:GUADALUPE RIVER- EASTERN CROSSSINGFund Cat:1
Limits To:GUADALUPE RIVER- WESTERN CROSSINGESTIMATE:$3,502,400
Length:0.4Actual$0
 
Back...
Totals for 1728-02-065
Length:0.4
Estimate:$3,502,400
Actual:

Handling CodeDefinition
XXProject not processed through statewide letting
TRTransfer of funds
LCProject let through local entity
LCProject not charged against district apportionment



Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract