The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

San Augustine County (FY 2021)

CCSJ: 0064-04-040

District:LUFKINLet Date:Sep 2019
Highway:SH 21Let Status:Tentative
Project ID:STP ( )HESCSJ:0064-04-040
Description:Hazard Elimination & SafetyHandling
Code:
 
Limits From:FM 3483Fund Cat:8
Limits To:0.352 MILES EAST OF FM 1ESTIMATE:$89,404
Length:6.6Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:SH 21Let Status:Tentative
Project ID:STP ( )HESCSJ:0064-04-041
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:FM 3483Fund Cat:8
Limits To:0.352 MILES EAST OF FM 1ESTIMATE:$71,030
Length:0.0Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:US 96Let Status:Tentative
Project ID:STP ( )HESCSJ:0064-06-056
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:FM 83Fund Cat:8
Limits To:0.383 MILES SOUTH OF SL 149ESTIMATE:$83,583
Length:7.7Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:SH 21Let Status:Tentative
Project ID:STP ( )HESCSJ:0118-10-067
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:0.256 MILES WEST OF FM 1196Fund Cat:8
Limits To:US 96ESTIMATE:$112,834
Length:10.6Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 353Let Status:Tentative
Project ID:STP ()HESCSJ:0118-12-020
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:SH 147Fund Cat:8
Limits To:2.629 MILES NORTH OF FM 2785ESTIMATE:$76,369
Length:0.0Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 2457Let Status:Tentative
Project ID:STP ( )HESCSJ:0213-13-015
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:0.228 MILES WEST OF FM 3277Fund Cat:8
Limits To:US 190ESTIMATE:$52,655
Length:4.6Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:SH 103Let Status:Tentative
Project ID:STP ( )HESCSJ:0336-06-030
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:2.761 MILES WEST OF FM 226Fund Cat:8
Limits To:0.375 MILES EAST OF FM 95ESTIMATE:$91,966
Length:8.5Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:SH 103Let Status:Tentative
Project ID:STP ( )HESCSJ:0336-08-028
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:0.798 MILES EAST OF US 96Fund Cat:8
Limits To:SH 21ESTIMATE:$127,878
Length:9.6Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 224Let Status:Tentative
Project ID:STP ( )HESCSJ:0403-02-021
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:SH 156Fund Cat:8
Limits To:SH 156ESTIMATE:$82,893
Length:7.7Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 1277Let Status:Tentative
Project ID:STP ( )HESCSJ:0597-02-024
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:US 96Fund Cat:8
Limits To:SH 103ESTIMATE:$203,880
Length:14.4Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 2923Let Status:Tentative
Project ID:STP ( )HESCSJ:0597-04-004
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:1.558 MILES WEST OF FM 1277Fund Cat:8
Limits To:FM 1277ESTIMATE:$23,408
Length:1.6Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 83Let Status:Tentative
Project ID:STP ( )HESCSJ:0694-01-028
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:FM 1Fund Cat:8
Limits To:0.617 MILES EAST OF FM 1175ESTIMATE:$121,081
Length:10.3Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 83Let Status:Tentative
Project ID:STP ( )HESCSJ:0694-01-029
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:FM 1Fund Cat:8
Limits To:FM 1175ESTIMATE:$102,012
Length:9.6Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 95Let Status:Tentative
Project ID:STP ( )HESCSJ:0706-03-027
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:US 59Fund Cat:8
Limits To:SH 7ESTIMATE:$180,602
Length:13.6Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 132Let Status:Tentative
Project ID:STP ( )HESCSJ:0737-02-017
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:7.179 MILES SOUTH OF SH 7Fund Cat:8
Limits To:SH 7ESTIMATE:$77,081
Length:2.7Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 417Let Status:Tentative
Project ID:STP ( )HESCSJ:0810-02-020
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:SH 87Fund Cat:8
Limits To:FM 139ESTIMATE:$150,412
Length:11.3Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 326Let Status:Tentative
Project ID:STP ( )HESCSJ:0893-03-016
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:US 69Fund Cat:8
Limits To:6.766 MILES SOUTH OF US 69ESTIMATE:$91,324
Length:1.2Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 343Let Status:Tentative
Project ID:STP ( )HESCSJ:0926-02-013
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:2.899 MILES EAST OF FM 851Fund Cat:8
Limits To:FM 225ESTIMATE:$74,566
Length:6.9Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 350Let Status:Tentative
Project ID:STP ( )HESCSJ:0928-01-014
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:US 190Fund Cat:8
Limits To:0.189 MILES SOUTH OF FM 3126ESTIMATE:$55,262
Length:0.0Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 352Let Status:Tentative
Project ID:STP ( )HESCSJ:0929-01-022
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:US 59Fund Cat:8
Limits To:US 287ESTIMATE:$85,501
Length:8.0Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 1280Let Status:Tentative
Project ID:STP ( )HESCSJ:0931-02-021
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:SH 19Fund Cat:8
Limits To:0.052 MI W OF TRINITY COUNTY LINEESTIMATE:$98,233
Length:7.3Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 1280Let Status:Tentative
Project ID:STP ( )HESCSJ:0931-02-023
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:0.494 MILES EAST OF SH 19Fund Cat:8
Limits To:TRINITY COUNTY LINEESTIMATE:$72,855
Length:6.8Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 227Let Status:Tentative
Project ID:STP ( )HESCSJ:0937-01-026
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:5.135 MILES WEST OF FM 2544Fund Cat:8
Limits To:0.585 MILES WEST OF FM 1272ESTIMATE:$153,816
Length:11.5Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 1275Let Status:Tentative
Project ID:STP ( )HESCSJ:1407-01-030
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:0.866 MILES SOUTH OF SL 224Fund Cat:8
Limits To:0.967 MILES SOUTH OF RAPSILVER LNESTIMATE:$90,763
Length:6.6Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 1279Let Status:Tentative
Project ID:STP ( )HESCSJ:1409-02-014
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:1.434 MILES EAS OF SH 147Fund Cat:8
Limits To:SH 87ESTIMATE:$77,918
Length:5.7Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 1592Let Status:Tentative
Project ID:STP ( )HESCSJ:1510-01-020
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:FM 1Fund Cat:8
Limits To:SH 184ESTIMATE:$117,103
Length:8.7Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 343Let Status:Tentative
Project ID:STP ( )HESCSJ:2300-01-021
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:FM 225Fund Cat:8
Limits To:US 59ESTIMATE:$189,443
Length:14.3Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 1316Let Status:Tentative
Project ID:STP ( )HESCSJ:2510-01-019
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:SH 146Fund Cat:8
Limits To:2.205 MILES EAST OF SH 146ESTIMATE:$25,826
Length:2.2Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 2497Let Status:Tentative
Project ID:STP ( )HESCSJ:2589-01-025
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:SH 94Fund Cat:8
Limits To:US 59ESTIMATE:$115,476
Length:8.6Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 2610Let Status:Tentative
Project ID:STP ( )HESCSJ:2591-01-013
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:SH 146Fund Cat:8
Limits To:4.962 MILES SOUTH OF SH 146ESTIMATE:$54,221
Length:5.0Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 83Let Status:Tentative
Project ID:STP ( )HESCSJ:2637-01-027
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:SH 147Fund Cat:8
Limits To:FM 2866ESTIMATE:$201,793
Length:15.2Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 2663Let Status:Tentative
Project ID:STP ( )HESCSJ:2663-01-009
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:1.435_MILES EAST OF US 287Fund Cat:8
Limits To:FM 2022ESTIMATE:$41,808
Length:3.0Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 2694Let Status:Tentative
Project ID:STP ( )HESCSJ:2700-01-020
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:FM 417Fund Cat:8
Limits To:1.584 MILES EAST OF FM 3172ESTIMATE:$185,622
Length:13.4Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 2782Let Status:Tentative
Project ID:STP ( )HESCSJ:2808-02-008
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:FM 225Fund Cat:8
Limits To:US 59ESTIMATE:$121,224
Length:9.0Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 2782Let Status:Tentative
Project ID:STP ( )HESCSJ:2808-02-010
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:FM 225Fund Cat:8
Limits To:US 59ESTIMATE:$96,168
Length:9.0Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 3126Let Status:Tentative
Project ID:STP ( )HESCSJ:3160-03-008
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:US 190Fund Cat:8
Limits To:FM 2457ESTIMATE:$38,731
Length:2.7Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 3278Let Status:Tentative
Project ID:STP ( )HESCSJ:3198-02-016
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:FM 222Fund Cat:8
Limits To:0.850 MILES WEST OF FM 1988ESTIMATE:$40,297
Length:3.6Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 3152Let Status:Tentative
Project ID:STP ( )HESCSJ:3220-01-011
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:US 190Fund Cat:8
Limits To:FM 350ESTIMATE:$89,339
Length:6.6Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 1475Let Status:Tentative
Project ID:STP ( )HESCSJ:3264-01-011
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:FM 841Fund Cat:8
Limits To:FM 326ESTIMATE:$23,721
Length:1.6Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 1336Let Status:Tentative
Project ID:STP ( )HESCSJ:3418-01-013
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:1.814 MILES WEST OF FM 324Fund Cat:8
Limits To:FM 324ESTIMATE:$21,786
Length:1.8Actual$0
 
District:LUFKINLet Date:Sep 2019
Highway:FM 3520Let Status:Tentative
Project ID:STP ( )HESCSJ:3584-01-003
Description:HAZARD ELIMINATION & SAFETYHandling
Code:
 
Limits From:FM 3382Fund Cat:8
Limits To:1.854 MILES EAST OF FM 3382ESTIMATE:$27,268
Length:1.9Actual$0
 
Back...
Totals for 0064-04-040
Length:279.4
Estimate:$3,837,152
Actual:

CCSJ: 0064-04-042

District:LUFKINLet Date:Nov 2019
Highway:FM 1Let Status:Tentative
Project ID:STP ()CSJ:0064-04-042
Description:Resurface RoadwayHandling
Code:
 
Limits From:SH 21Fund Cat:1
Limits To:SAN AUGUSTINE COUNTY LINEESTIMATE:$132,607
Length:2.3Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:FM 1Let Status:Tentative
Project ID:STP ( )CSJ:0064-05-062
Description:Resurface RoadwayHandling
Code:
 
Limits From:SH 103Fund Cat:1
Limits To:SH 184ESTIMATE:$173,503
Length:4.6Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:US 287Let Status:Tentative
Project ID:STP ( )CSJ:0109-03-038
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:BU 287Fund Cat:1
Limits To:2.193 MI N OF FM 2663ESTIMATE:$285,824
Length:4.1Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:US 287Let Status:Tentative
Project ID:STP ( )CSJ:0109-04-032
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:2.193 MI N OF FM 2663Fund Cat:1
Limits To:SL 304ESTIMATE:$444,576
Length:6.3Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:SH 19Let Status:Tentative
Project ID:STP ( )CSJ:0109-06-043
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:LOVELADY CITY LIMITS SOUTHFund Cat:1
Limits To:TRINITY COUNTY LINEESTIMATE:$249,327
Length:4.0Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:SH 19Let Status:Tentative
Project ID:STP ( )CSJ:0109-07-052
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:HOUSTON COUNTY LINE_SOUTHFund Cat:1
Limits To:0.128 MILES S FM 1617ESTIMATE:$632,286
Length:10.2Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:SH 19Let Status:Tentative
Project ID:STP ( )CSJ:0109-08-048
Description:Resurface RoadwayHandling
Code:
 
Limits From:0.128 MILES S FM 1617Fund Cat:1
Limits To:TRINITY RIVER BRIDGEESTIMATE:$589,600
Length:5.3Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:SH 21Let Status:Tentative
Project ID:STP ( )CSJ:0118-02-035
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:FM 1733Fund Cat:1
Limits To:FM 227 NORTHESTIMATE:$324,666
Length:7.2Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:SH 21Let Status:Tentative
Project ID:STP ()CSJ:0118-06-074
Description:Resurface RoadwayHandling
Code:
 
Limits From:3.4 Miles W of Mill CreekFund Cat:1
Limits To:US 59ESTIMATE:$253,692
Length:3.3Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:SH 21Let Status:Tentative
Project ID:STP ()CSJ:0118-06-075
Description:Resurface RoadwayHandling
Code:
 
Limits From:FM 225Fund Cat:1
Limits To:3.48 Miles West of Mill CreekESTIMATE:$238,505
Length:5.1Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:FM 415Let Status:Tentative
Project ID:STP ( )CSJ:0123-08-014
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:SH 87Fund Cat:1
Limits To:FM 138ESTIMATE:$280,844
Length:7.8Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:US 59Let Status:Tentative
Project ID:STP ( )CSJ:0175-05-044
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:SH 87Fund Cat:1
Limits To:RUSK COUNTY LINEESTIMATE:$613,751
Length:5.2Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:US 59Let Status:Tentative
Project ID:NH ( )CSJ:0176-05-191
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:BU 59 NFund Cat:1
Limits To:US 190ESTIMATE:$130,445
Length:2.0Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:US 59Let Status:Tentative
Project ID:NH ( )CSJ:0177-01-111
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:US 190Fund Cat:1
Limits To:1.6 MILES S. US 190ESTIMATE:$104,827
Length:1.6Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:US 190Let Status:Tentative
Project ID:STP ( )CSJ:0213-05-041
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:JUST WEST OF FM 1276Fund Cat:1
Limits To:TYLER COUNTY LINEESTIMATE:$665,905
Length:10.2Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:SH 94Let Status:Tentative
Project ID:STP ( )CSJ:0319-04-087
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:FM 706Fund Cat:1
Limits To:SL 287ESTIMATE:$478,755
Length:3.9Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:SH 103Let Status:Tentative
Project ID:NH ( )CSJ:0336-05-065
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:PAUL STREETFund Cat:1
Limits To:FM 326ESTIMATE:$422,453
Length:3.4Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:SH 103Let Status:Tentative
Project ID:NH ( )CSJ:0336-07-070
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:SH 147 NORTHFund Cat:1
Limits To:FM 1751ESTIMATE:$400,000
Length:5.9Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:SH 147Let Status:Tentative
Project ID:STP ( )CSJ:0390-02-049
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:FM 83Fund Cat:1
Limits To:ANGELINA RIVER BRIDGEESTIMATE:$211,335
Length:5.5Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:SH 150Let Status:Tentative
Project ID:STP ( )CSJ:0395-03-044
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:FM 222 N INTERSECTIONFund Cat:1
Limits To:US 59ESTIMATE:$566,093
Length:9.4Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:SH 156Let Status:Tentative
Project ID:STP ( )CSJ:0403-01-046
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:US 190Fund Cat:1
Limits To:SH 150ESTIMATE:$525,470
Length:14.2Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:SH 7Let Status:Tentative
Project ID:STP ( )CSJ:0553-02-018
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:US 69Fund Cat:1
Limits To:NACOGDOCHES COUNTY LINEESTIMATE:$218,205
Length:3.4Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:SH 7Let Status:Tentative
Project ID:STP ( )CSJ:0553-03-036
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:FM 2782Fund Cat:1
Limits To:BU 59-FESTIMATE:$420,587
Length:7.7Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:FM 1277Let Status:Tentative
Project ID:STP ( )CSJ:0597-03-013
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:SH 103Fund Cat:1
Limits To:SH 147ESTIMATE:$226,207
Length:5.9Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:FM 699Let Status:Tentative
Project ID:STP ( )CSJ:0809-01-032
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:US 84Fund Cat:1
Limits To:FM 1656ESTIMATE:$294,847
Length:8.2Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:FM 699Let Status:Tentative
Project ID:STP ( )CSJ:0809-06-001
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:FM 1656Fund Cat:1
Limits To:SPUR 699ESTIMATE:$67,507
Length:1.8Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:FM 226Let Status:Tentative
Project ID:STP ( )CSJ:0893-01-037
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:SH 103Fund Cat:1
Limits To:END OF STATE MAINTENANCEESTIMATE:$199,690
Length:5.7Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:SH 7Let Status:Tentative
Project ID:STP ( )CSJ:0894-01-021
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:SH 103Fund Cat:1
Limits To:US 69ESTIMATE:$450,149
Length:6.6Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:FM 138Let Status:Tentative
Project ID:STP ( )CSJ:0926-06-016
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:US 59Fund Cat:1
Limits To:1.1 MI W OF FM 415ESTIMATE:$206,483
Length:5.8Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:FM 705Let Status:Tentative
Project ID:STP ( )CSJ:1079-01-035
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:FM 83Fund Cat:1
Limits To:COUCHATAMA CREEKESTIMATE:$91,825
Length:2.5Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:FM 705Let Status:Tentative
Project ID:STP ( )CSJ:1079-02-018
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:COUCHATAMA CREEKFund Cat:1
Limits To:END OF PAVEMENTESTIMATE:$338,934
Length:9.5Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:FM 947Let Status:Tentative
Project ID:STP ( )CSJ:1195-01-030
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:US 59 IN TIMPSONFund Cat:1
Limits To:US 59 IN TENAHAESTIMATE:$351,208
Length:11.3Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:FM 2022Let Status:Tentative
Project ID:STP ( )CSJ:1875-02-025
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:FM 2423Fund Cat:1
Limits To:FM 2663ESTIMATE:$300,000
Length:8.0Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:FM 1988Let Status:Tentative
Project ID:STP ( )CSJ:1876-01-038
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:US 59Fund Cat:1
Limits To:0.44 MILES SOUTH OF FM 3278ESTIMATE:$224,949
Length:5.9Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:FM 942Let Status:Tentative
Project ID:STP ( )CSJ:1877-02-017
Description:Resurface RoadwayHandling
Code:
 
Limits From:US 59Fund Cat:1
Limits To:FM 62ESTIMATE:$276,637
Length:0.0Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:FM 357Let Status:Tentative
Project ID:STP ( )CSJ:2117-02-014
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:FM 2262Fund Cat:1
Limits To:POLK COUNTY LINEESTIMATE:$178,358
Length:5.1Actual$0
 
District:LUFKINLet Date:Nov 2019
Highway:FM 3152Let Status:Tentative
Project ID:STP ( )CSJ:3220-01-012
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:US 190Fund Cat:1
Limits To:FM 350ESTIMATE:$252,915
Length:6.6Actual$0
 
Bid List
Back...
Totals for 0064-04-042
Length:215.5
Estimate:$11,822,965
Actual:

CCSJ: 0336-07-071

District:LUFKINLet Date:Jan 2020
Highway:SH 103Let Status:Tentative
Project ID:NH ( )CSJ:0336-07-071
Description:RESURFACE ROADWAYHandling
Code:
 
Limits From:ATTOYAC RIVERFund Cat:1
Limits To:SH 147NESTIMATE:$8,700,000
Length:8.3Actual$0
 
Back...
Totals for 0336-07-071
Length:8.3
Estimate:$8,700,000
Actual:

CCSJ: 0390-05-006

District:LUFKINLet Date:Jan 2020
Highway:FM 2558Let Status:Tentative
Project ID:BR ( )CSJ:0390-05-006
Description:REPLACE BRIDGE AND APPROACHESHandling
Code:
 
Limits From:FM 2558 AT LITTLE OWL CREEKFund Cat:6
Limits To:.ESTIMATE:$907,600
Length:0.0Actual$0
 
Back...
Totals for 0390-05-006
Length:0
Estimate:$907,600
Actual:

CCSJ: 0809-03-040

District:LUFKINLet Date:May 2020
Highway:US 96Let Status:Tentative
Project ID:STP ( )CSJ:0809-03-040
Description:Construct New Roadway LanesHandling
Code:
 
Limits From:FM 3451Fund Cat:11
Limits To:SH 21ESTIMATE:$6,000,000
Length:2.7Actual$0
 
Back...
Totals for 0809-03-040
Length:2.7
Estimate:$6,000,000
Actual:

Handling CodeDefinition
XXProject not processed through statewide letting
TRTransfer of funds
LCProject let through local entity
LCProject not charged against district apportionment



Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract