Letting Schedule for Houston District (FY 2021)
Bid Tabulations Dashboard
This report will no longer be updated, please access links on the Contract Letting page. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
Houston District (FY 2021) |
Brazoria | Fort Bend | Galveston | Harris | Montgomery | Waller | | |||||||
Brazoria County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
---|---|---|---|---|---|---|---|
1412-02-019 | FM 1301 | Tentative | Feb 2020 | $150,800 | 8 | INSTALL LED FLASHING CHEVRONS (CURVE) | 0.0 |
1003-01-096 | FM 523 | Tentative | Feb 2020 | $150,800 | 8 | INSTALL LED FLASHING CHEVRONS (CURVE) | 0.0 |
0178-03-156 | SH 35 | Tentative | Aug 2020 | $6,695,000 | 1 | WIDEN SHOULDERS, 1.5 IN LEVEL UP, 1.5 IN ACP OVERLAY, | 0.0 |
1004-01-061 | FM 521 | Tentative | Jun 2020 | $127,227 | 8 | MILLED EDGELINE RUMBLE STRIPS AND MILLED CENTERLINE RUMBLE | 0.0 |
0111-04-035 | FM 521 | Tentative | Apr 2020 | $1,842,000 | 1 | PAVEMENT REPAIR, SEAL COAT AND 1.5 IN PFC OVERLAY | 0.0 |
0192-02-054 | SH 6 | Tentative | Mar 2020 | $322,114 | 8 | IMPROVE TRAFFIC SIGNALS, INSTALL ADVANCED WARNING SIGNALS | 0.0 |
0598-02-118 | SH 288 | Tentative | Mar 2020 | $5,708,000 | 1 | MILL, SEAL COAT AND 1.5 IN PFC OVERLAY | 0.0 |
0192-02-055 | SH 6 | Tentative | Mar 2020 | $322,114 | 8 | IMPROVE TRAFFIC SIGNALS, INSTALL ADVANCED WARNING SIGNALS | 0.0 |
1004-02-017 | FM 524 | Tentative | Apr 2020 | $1,774,000 | 1 | PAVEMENT REPAIR, SEAL COAT AND 1.5 IN ACP OVERLAY | 0.0 |
0111-08-100 | SH 36 | Tentative | Dec 2019 | $8,500,000 | 2M | WIDEN TO 4-LANE DIVIDED | 0.0 |
1004-01-060 | FM 521 | Tentative | Apr 2020 | $953,000 | 1 | PAVEMENT REPAIR, SEAL COAT AND 1.5 IN ACP OVERLAY | 0.0 |
0192-02-056 | SH 6 | Tentative | Dec 2019 | $321,835 | 6 | REPLACE BEARING PADS (NBI# 12020019202029) | 0.0 |
2523-02-068 | FM 2004 | Tentative | May 2020 | $32,000,000 | 1 | ADD SHOULDERS, WIDEN BRIDGES, REPLACE BRIDGE AT CHOCOLATE | 0.0 |
0912-31-310 | VA | Tentative | Feb 2020 | $4,033,000 | 11 | CONSTRUCT BRAZORIA COUNTY BICYCLE LOOP BY WIDENING SHOULDERS | 0.0 |
0912-31-293 | CS | Tentative | May 2020 | $4,948,242 | 3 | WIDEN TO 4 LANES | 0.0 |
2524-02-022 | FM 2611 | Tentative | Sep 2019 | $9,621,216 | 6 | REPLACE BRIDGE AND APPROACHES (NBI# 12020252402001) | 4.5 |
0188-06-054 | SH 36 | Tentative | Feb 2020 | $150,800 | 8 | INSTALL LED FLASHING CHEVRONS (CURVE) | 0.0 |
0912-31-319 | CS | Tentative | May 2020 | $40,033,000 | 3 | WIDEN TO 4-LANE BLVD SECTION | 0.0 |
1003-01-095 | FM 523 | Tentative | Feb 2020 | $67,704 | 8 | INSTALL INTERSECTION FLASHING BEACON, INSTALL ADVANCED | 0.0 |
0111-09-042 | BS 288B | Tentative | Jul 2020 | $5,445,000 | 1 | WIDEN TO ADD 8 FT SHOULDERS, PAVEMENT REPAIR, OCST, 1.5 IN | 0.0 |
Fort Bend County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
1415-03-012 | FM 2759 | Tentative | Mar 2020 | $900,000 | 11 | CONSTRUCT SOUNDWALL | 0.0 |
0912-34-192 | VA | Tentative | Mar 2020 | $6,092,000 | 3 | INSTALL WIRELESS TRAFFIC SIGNAL COMMUNICATION SYSTEM | 0.0 |
0192-01-100 | SH 6 | Tentative | Mar 2020 | $150,800 | 8 | INSTALL LED FLASHING CHEVRONS (CURVE) | 0.0 |
0543-03-076 | FM 762 | Tentative | Sep 2019 | $710,279 | 1 | BASE REPAIR, PLANING AND 2 IN ACP OVERLAY | 0.0 |
0192-01-099 | SH 6 | Tentative | Mar 2020 | $5,826,000 | 2M | INSTALL ITS EQUIPMENT & INFRASTRUCTURE - 144-STRAND FIBER | 0.0 |
0912-34-200 | CS | Tentative | May 2020 | $1,025,528 | 10 | REMOVE AND REPLACE DAMAGED CONCRETE SLABS AND RIP RAP | 0.0 |
0188-10-021 | FM 1463 | Tentative | Jun 2020 | $33,400,000 | 2M | WIDEN FROM 2 TO 4 AND 6 LANES URBAN DIVIDED | 0.0 |
0912-34-195 | VA | Tentative | Jun 2020 | $18,000,000 | 5 | REIMBURSEMENT FOR FORT BEND COUNTY TRANSIT ADMINISTRATION | 0.0 |
3510-04-049 | SH 99 | Tentative | Aug 2020 | $10,800,000 | 3 | CONSTRUCT OVERPASS AND APPROACHES (SEGMENT D NON-TOLL) | 0.0 |
0188-09-040 | FM 723 | Tentative | Aug 2020 | $176,000,000 | 2M | WIDEN ROAD - ADD LANES | 0.0 |
1685-06-035 | SH 6 | Tentative | Mar 2020 | $322,134 | 8 | IMPROVE TRAFFIC SIGNALS, INSTALL ADVANCED WARNING SIGNALS | 0.0 |
0271-10-012 | US 90 | Tentative | Jul 2020 | $180,002 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
2093-01-010 | FM 2218 | Tentative | Jan 2020 | $40,187,493 | 2M | WIDEN FROM 2 LANES TO 4-LANE DIVIDED | 0.0 |
0543-02-077 | FM 359 | Tentative | Jan 2020 | $0 | 8 | INSTALL INTERSECTION FLASHING BEACON | 0.0 |
3420-01-012 | FM 3345 | Tentative | Nov 2019 | $600,000 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
0543-02-078 | FM 359 | Tentative | Nov 2019 | $2,600,000 | 3 | HIGHWAY IMPROVEMENT | 0.0 |
2940-02-011 | FM 2919 | Tentative | Dec 2019 | $871,150 | 1 | 1.5 IN ACP OVERLAY | 0.0 |
3510-04-054 | SH 99 | Tentative | Dec 2019 | $22,500,000 | 3 | Highway Improvement | 0.0 |
1257-01-051 | FM 1092 | Tentative | Oct 2019 | $322,114 | 8 | IMPROVE TRAFFIC SIGNALS, INSTALL ADVANCED WARNING SIGNALS | 0.0 |
0192-01-101 | SH 6 | Tentative | Nov 2019 | $1,010,100 | 6 | REPLACE BEARING PADS (NBI# 12080019201041) | 0.0 |
Galveston County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
2523-01-026 | FM 2004 | Tentative | Aug 2020 | $5,790,000 | 1 | WIDEN FOR 8 FT SHOULDERS, 1 IN LEVEL UP AND 1 IN TOM | 0.0 |
0978-01-038 | FM 646 | Tentative | Jun 2020 | $350,000 | 8 | IMPROVE TRAFFIC SIGNALS | 0.0 |
0976-03-104 | FM 518 | Tentative | Apr 2020 | $2,321,368 | 1 | CONSTRUCT 10 FT WIDE SHARED USE PATH ADJACENT TO HOT WATER | 0.0 |
0912-73-202 | VA | Tentative | Dec 2019 | $358,023 | 3 | CONSTRUCT ON-STREET BICYCLE NETWORK (SIGNAGE, PAVEMENT | 0.0 |
1414-01-020 | FM 528 | Tentative | Jan 2020 | $322,114 | 8 | IMPROVE TRAFFIC SIGNALS, INSTALL ADVANCED WARNING SIGNALS | 0.0 |
Harris County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
0912-72-360 | CS | Tentative | Jan 2020 | $10,750,000 | 3 | RECONSTRUCT ROADWAY | 0.0 |
0389-13-062 | SH 146 | Tentative | Dec 2019 | $232,402 | 6 | REPLACE BEARING PADS (NBI# 12102038913118) | 0.0 |
0912-72-386 | CS | Tentative | Jan 2020 | $3,032,000 | 3 | RECONSTRUCT INTERSECTION AS URBAN ROUNDABOUT INCLUDING | 0.0 |
0912-00-563 | VA | Tentative | Jan 2020 | $1,250,000 | 3 | REGIONAL VANPOOL PROGRAM- CMAQ FY19 | 0.0 |
0912-72-354 | CS | Tentative | Jan 2020 | $321,000 | 6 | REPLACE BRIDGE & APPROACHES NBI# 12102B28193532 | 0.0 |
0912-00-577 | VA | Tentative | Jan 2020 | $1,750,000 | 1 | INSTALL NEW TRAFFIC SIGNALS | 0.0 |
0912-72-355 | CS | Tentative | Jan 2020 | $1,100,000 | 6 | REPLACE BRIDGE & APPROACHES NBI# 12102B62905002 | 0.0 |
0912-72-353 | CS | Tentative | Jan 2020 | $502,000 | 6 | REPLACE BRIDGE & APPROACHES NBI# 12102B08961039 | 0.0 |
0912-72-179 | CR | Tentative | Dec 2019 | $12,900,000 | 3 | WIDEN ROADWAY FROM 4 TO 6 LANES INCLUDING DRAINAGE | 0.0 |
0912-00-578 | VA | Tentative | Feb 2020 | $2,200,000 | 1 | TRAFFIC SIGNAL UPGRADES | 0.0 |
0912-72-541 | CS | Tentative | Jul 2020 | $5,105,000 | 3 | CONSTRUCT 4-LANE DIVIDED ROADWAY ON NEW ALIGNMENT WITH | 0.0 |
0912-00-555 | VA | Tentative | Jan 2020 | $2,000,000 | 3 | REGIONAL ITS INFRASTRUCTURE - HARDWARE/SOFTWARE, UTILITIES | 0.0 |
0912-72-394 | CS | Tentative | Dec 2019 | $2,743,000 | 3 | RECONSTRUCT BACK OF CURB INFRASTRUCTURE - SIDEWALKS, CURBS, | 0.0 |
0912-72-573 | VA | Tentative | Dec 2019 | $2,700,000 | 11 | TRANSPORTATION NON-ROADWAY | 0.0 |
3256-02-098 | SL 8 | Tentative | Dec 2019 | $600,000 | 1 | CRCP MAINLANE WIDENING AND FRONTAGE ROAD RECONSTRUCTION TO | 0.0 |
0389-12-092 | SH 146 | Tentative | Oct 2019 | $1,000,000 | 11 | INTERSECTION IMPROVEMENTS | 0.0 |
0111-01-096 | FM 521 | Tentative | Oct 2019 | $322,114 | 8 | IMPROVE TRAFFIC SIGNALS, INSTALL ADVANCED WARNING SIGNALS | 0.0 |
1685-01-112 | FM 1960 | Tentative | Dec 2019 | $1,610,570 | 8 | IMPROVE TRAFFIC SIGNALS, INSTALL ADVANCED WARNING SIGNALS_IN | 0.0 |
0508-01-354 | IH 10 | Tentative | Feb 2020 | $4,047,000 | 1 | BASE REPAIR, MILL AND OVERLAY OF THE EB AND WB FRONTAGE RDS | 0.0 |
0912-00-562 | VA | Tentative | Jan 2020 | $3,750,000 | 3 | REGIONAL VANPOOL PROGRAM- STP FY 19 | 0.0 |
1685-01-090 | FM 1960 | Tentative | Feb 2020 | $31,367,000 | 1 | INTERSECTION IMPROVEMENTS | 0.0 |
0912-72-565 | VA | Tentative | Sep 2019 | $1,109,062 | 3 | SIGNING AND PAVEMENT MARKINGS FOR OFF-PEAK HOV LANE | 0.0 |
0027-13-201 | IH 69 | Tentative | Aug 2020 | $210,000,000 | 2M | RECONSTRUCT TO 10 MAIN LANES | 0.0 |
0508-01-355 | IH 10 | Tentative | Oct 2019 | $633,000 | 1 | INSTALL PAVEMENT MARKINGS | 0.0 |
3510-06-018 | SH 99 | Tentative | Feb 2020 | $500,000 | 11 | CONSTRUCT UTURN | 0.0 |
3256-03-097 | SL 8 | Tentative | Jun 2020 | $350,000 | 8 | IMPROVE TRAFFIC SIGNALS SAFETY LIGHTING AT INTERSECTION | 0.0 |
3256-03-098 | SL 8 | Tentative | Jun 2020 | $350,000 | 8 | IMPROVE TRAFFIC SIGNALS SAFETY LIGHTING AT INTERSECTION | 0.0 |
1258-04-065 | FM 1093 | Tentative | Sep 2019 | $12,009,758 | 3 | RECONST BACK OF CURB INFRASTRUCTURE (WIDER SIDEWALKS, STREET | 0.0 |
1685-01-109 | FM 1960 | Tentative | Jun 2020 | $350,000 | 8 | IMPROVE TRAFFIC SIGNALS | 0.0 |
1685-02-050 | FM 1960 | Tentative | Jun 2020 | $350,000 | 8 | IMPROVE TRAFFIC SIGNALS | 0.0 |
0912-00-500 | VA | Tentative | May 2020 | $1,380,000 | 5 | COMMUTE SOLUTIONS STAFF AND OUTREACH (C.S. FUNDING INCLUDING | 0.0 |
0912-00-526 | VA | Tentative | May 2020 | $1,000,000 | 1 | Install/Upgrade Roadway Lighting | 0.0 |
0912-72-401 | VA | Tentative | Aug 2020 | $36,530,369 | 3 | CONSTRUCT RAILROAD UNDERPASS AT YORK ST AND CLOSE AT-GRADE | 0.0 |
0050-06-093 | US 290 | Tentative | May 2020 | $32,109,300 | 3 | CONSTRUCT RAMP PROVIDING ACCESS TO THE US 290 HOV/HOT | 0.0 |
0508-01-369 | IH 10 | Tentative | May 2020 | $4,740,633 | 10 | REPLACE/REPAIR FENDER AND DOLPHINS | 0.0 |
0912-00-543 | VA | Tentative | May 2020 | $40,033,000 | 3 | WIDEN TO 4-LANE BLVD SECTION | 0.0 |
0912-00-580 | VA | Tentative | May 2020 | $1,383,770 | 3 | SIDEWALK AND ADA RAMP CONSTRUCTION | 0.0 |
0508-07-288 | SS 330 | Tentative | Oct 2019 | $420,000 | 1 | INSTALL PAVEMENT MARKINGS | 0.0 |
0912-00-558 | VA | Tentative | May 2020 | $10,000,000 | 3 | REGIONAL FREEWAY INCIDENT MANAGEMENT - TOWING (FY 2019) | 0.0 |
0720-03-141 | SH 249 | Tentative | Oct 2019 | $3,319,571 | 1 | RAMP REVERSAL,CRCP,ASB,CSB,LTS,STORMSEWER CTMS,SIGNING AND | 0.0 |
0508-01-353 | IH 10 | Tentative | Nov 2019 | $8,700,000 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
0110-06-143 | IH 45 | Tentative | Nov 2019 | $804,653 | 8 | IMPROVE TRAFFIC SIGNALS, INSTALL ADVANCED WARNING SIGNALS | 0.0 |
3256-03-096 | SL 8 | Tentative | Mar 2020 | $500,000 | 11 | RESTRIPING FROM 6 TO 8 LANES | 0.0 |
1685-05-128 | SH 6 | Tentative | Mar 2020 | $322,114 | 8 | IMPROVE TRAFFIC SIGNALS, INSTALL ADVANCED WARNING SIGNALS | 0.0 |
0508-01-359 | IH 10 | Tentative | Sep 2019 | $5,500,000 | 3 | EB RAMPS REVERSAL | 0.0 |
1685-05-123 | SH 6 | Tentative | Mar 2020 | $399,932 | 8 | IMPROVE TRAFFIC SIGNALS, INSTALL ADVANCED WARNING SIGNALS | 0.0 |
0028-01-099 | US 90A | Tentative | Apr 2020 | $3,726,000 | 1 | Surfacing/Roadway Restoration | 0.0 |
0720-03-146 | Tentative | Oct 2019 | $2,961,461 | 3 | HIKE AND/OR BIKE | 0.0 | |
3510-06-007 | SH 99 | Tentative | Apr 2020 | $63,000,000 | 3 | CONSTRUCT 4 DCS (TOLL) (SEGMENT F-1) | 0.0 |
1258-04-062 | FM 1093 | Tentative | Mar 2020 | $2,710,000 | 1 | FULL DEPTH CONCRETE REPAIR, CRACK & SPALL REPAIR, SEAL COAT, | 0.0 |
0912-72-536 | CR | Tentative | Oct 2019 | $5,238,360 | 3 | REHABILITATION OF EXISTING FERRY AND BERTHING FACILITIES. | 0.0 |
0912-72-397 | VA | Tentative | Apr 2020 | $1,552,000 | 3 | CONSTRUCT NEW 5 FT SIDEWALKS ALONG CITY OWNED ROADWAYS | 0.0 |
0912-00-574 | VA | Tentative | Sep 2019 | $5,000,000 | 1 | ITS SUPPORT NON-LETTING | 0.0 |
3256-02-093 | SL 8 | Tentative | Jan 2020 | $10,500,000 | 1 | RECONSTRUCT EB AND WB FRONTAGE ROADS | 0.0 |
3256-04-077 | SL 8 | Tentative | Jan 2020 | $804,653 | 8 | IMPROVE TRAFFIC SIGNALS, INSTALL ADVANCED WARNING SIGNALS | 0.0 |
3256-04-078 | SL 8 | Tentative | Jan 2020 | $64,883 | 8 | IMPROVE TRAFFIC SIGNALS, INSTALL ADVANCED WARNING SIGNALS | 0.0 |
0912-72-365 | VA | Tentative | Nov 2019 | $4,031,000 | 3 | IMPLEMTATION OF AUTOMATED PARKING GUIDANCE SYSTEM, INCLUDING | 0.0 |
2941-01-031 | FM 2920 | Tentative | Jan 2020 | $1,250,000 | 11 | CONSTRUCT DRAINAGE STRUCTURE | 0.0 |
0271-07-320 | IH 10 | Tentative | Dec 2019 | $144,800 | 6 | REPLACE BEARING PADS (NBI# 12102027107613) | 0.0 |
0271-15-093 | IH 610 | Tentative | Dec 2019 | $8,000,000 | 1 | PERMAMENT BRIDGE REPAIRS NBI# 12102027115377 | 0.0 |
0912-72-393 | CS | Tentative | Jan 2020 | $1,562,000 | 3 | RECONSTRUCT BACK OF CURB INFRASTRUCTURE - SIDEWALKS, CURBS, | 0.0 |
0912-00-594 | VA | Tentative | Sep 2019 | $0 | 1 | COMMUNICATION BACKBONE REHABILITATION (NON-LETTING) | 0.0 |
1685-05-109 | SH 6 | Tentative | Jan 2020 | $5,870,000 | 1 | 2.5" PLANING, SEAL COAT, 1" CAM, 1" TOM & PAVEMENT MARKINGS | 0.0 |
1685-03-098 | FM 1960 | Tentative | May 2020 | $69,055,631 | 2M | WIDEN TO 6-LN DIVIDED W/ RAISED MEDIANS, CHANNELIZED TURN | 0.0 |
0051-02-102 | SH 3 | Tentative | Jun 2020 | $350,000 | 8 | IMPROVE TRAFFIC SIGNALS AND SAFETY LIGHTING AT INTERSECTION | 0.0 |
1685-03-058 | FM 1960 | Tentative | May 2020 | $65,032,652 | 2M | WIDEN TO 6-LN DIVIDED W/ RAISED MEDIANS, CHANNELIZED TURN | 0.0 |
0912-71-836 | CS | Tentative | May 2020 | $16,000,000 | 3 | WIDEN TO 4 LANE DIVIDED | 0.0 |
0912-72-391 | CS | Tentative | May 2020 | $17,132,000 | 3 | RECONSTRUCT ROADWAY INCLUDING DRAINAGE, ACCESS MANAGEMENT & | 0.0 |
0110-06-140 | IH 45 | Tentative | Jun 2020 | $550,000 | 8 | IMPROVE TRAFFIC SIGNALS | 0.0 |
0508-01-357 | IH 10 | Tentative | Oct 2019 | $2,459,000 | 9 | CONSTRUCT SHARED USE PATH | 0.0 |
0720-03-132 | SH 249 | Tentative | Nov 2019 | $440,000 | 1 | SURFACING/ROADWAY RESTORATION | 0.0 |
0912-00-548 | VA | Tentative | Jun 2020 | $3,750,000 | 3 | METRO STAR VANPOOL PROGRAM (FY 2018) | 0.0 |
0028-01-067 | BU 90-U | Tentative | Aug 2020 | $17,000,000 | 2M | WIDEN TO 6 LANE DIVIDED URBAN_(PHASE 2) | 0.0 |
0720-03-136 | SH 249 | Tentative | Jun 2020 | $350,000 | 8 | IMPROVE TRAFFIC SIGNALS | 0.0 |
0177-07-001 | IH 69 | Tentative | Jul 2020 | $1,000,000 | 1 | CONSTRUCT U-TURN AT BF 1960A AND RAMP RELOCATION AT WILL | 0.0 |
Montgomery County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
1986-01-065 | FM 1314 | Tentative | Oct 2019 | $1,000,000 | 3 | INSTALL CULVERTS | 0.0 |
0675-08-111 | IH 45 | Tentative | Jan 2020 | $7,333,000 | 2M | INSTALL ITS EQUIPMENT AND INFRASTRUCTURE | 0.0 |
0523-10-042 | FM 1488 | Tentative | Aug 2020 | $947,943 | 1 | INTERSECTION IMPROVEMENTS | 0.0 |
0720-02-094 | SH 249 | Tentative | Jan 2020 | $150,800 | 8 | INSTALL LED FLASHING CHEVRONS (CURVE) | 0.0 |
0720-02-093 | SH 249 | Tentative | Jan 2020 | $322,114 | 8 | IMPROVE TRAFFIC SIGNALS, INSTALL ADVANCED WARNING SIGNALS | 0.0 |
1912-01-021 | FM 2090 | Tentative | Sep 2019 | $3,400,000 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
3158-01-043 | FM 3083 | Tentative | Jan 2020 | $322,114 | 8 | IMPROVE TRAFFIC SIGNALS, INSTALL ADVANCED WARNING SIGNALS | 0.0 |
0720-02-092 | FM 149 | Tentative | Jan 2020 | $15,800 | 8 | INSTALL LED FLASHING CHEVRONS (CURVE) | 0.0 |
Waller County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
0523-02-049 | FM 362 | Tentative | Jan 2020 | $4,594,000 | 11 | SEAL COAT, 1.5 IN ACP OVERLAY, ADD SHOULDER AND CENTERLINE | 0.0 |
0050-05-067 | BU 290H | Tentative | Feb 2020 | $4,962,550 | 1 | PLANING, SEAL COAT AND 1.5 IN ACP OVERLAY | 0.0 |
0543-01-066 | FM 359 | Tentative | Apr 2020 | $150,800 | 8 | INSTALL LED FLASHING CHEVRONS (CURVE) | 0.0 |
0912-56-058 | CR | Tentative | Aug 2020 | $510,000 | 6 | Bridge Replacement | 0.0 |
0271-09-024 | US 90 | Tentative | Sep 2019 | $2,966,166 | 1 | BASE REPAIR, PLANING, SEAL COAT AND 1.5 IN ACP OVERLAY | 0.0 |
0543-01-065 | FM 359 | Tentative | Feb 2020 | $1,706,000 | 1 | ADD CONTINUOUS TURN LANES AT IH 10 S, SEAL COAT, 1.5 IN ACP | 0.0 |
0271-09-023 | US 90 | Tentative | Feb 2020 | $2,051,000 | 1 | ADD 5 IN SHOULDER, PLANING, LEVEL-UP AND 1.5 IN PFC OVERLAY | 0.0 |
|