Detail Letting Schedule for Bexar County (FY 2021)
Bid Tabulations Dashboard
Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
Bexar County (FY 2021) |
CCSJ: 0016-08-039 |
|||
District: | SAN ANTONIO | Let Date: | Apr 2021 |
Highway: | SL 368 | Let Status: | Actual |
Project ID: | BR 2021(485) | CSJ: | 0016-08-039 |
Description: | BRIDGE REPLACEMENT | Handling Code: | |
Limits From: | AT SALADO CREEK AND IRA LEE RD. | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $7,127,370 |
Length: | 0.1 | Actual | $6,694,602 |
District: | SAN ANTONIO | Let Date: | Apr 2021 |
Highway: | SL 368 | Let Status: | Actual |
Project ID: | ROW 16-8-44 | CSJ: | 0016-08-044 |
Description: | RIGHT OF WAY | Handling Code: | |
Limits From: | AT SALADO CREEK AND IRA LEE RD. | Fund Cat: | ROW |
Limits To: | . | ESTIMATE: | $205,294 |
Length: | 0.1 | Actual | $280,195 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0016-08-039 | ||
---|---|---|---|
Length: | 0.2 | ||
Estimate: | $7,332,664 | ||
Actual: | $6,974,797 | ||
CCSJ: 0017-02-080 |
|||
District: | SAN ANTONIO | Let Date: | Mar 2021 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | NH 2021(203) | CSJ: | 0017-02-080 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | 1.8 MI. EAST OF LP 1604 (QUEST RD.) | Fund Cat: | 8 |
Limits To: | 0.3 MI. NORTH OF IH 410 | ESTIMATE: | $235,934 |
Length: | 3.1 | Actual | $146,973 |
District: | SAN ANTONIO | Let Date: | Mar 2021 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | NH 2021(203) | CSJ: | 0017-03-069 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | LP 1604 | Fund Cat: | 8 |
Limits To: | 1.8 MI. NORTH OF LP 1604 (QUEST RD. | ESTIMATE: | $96,293 |
Length: | 1.7 | Actual | $79,024 |
District: | SAN ANTONIO | Let Date: | Mar 2021 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | NH 2021(203) | CSJ: | 0017-09-110 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | 0.3 MI. NORTH OF IH 410 | Fund Cat: | 8 |
Limits To: | LP 13 (SW MILITARY) | ESTIMATE: | $349,834 |
Length: | 6.1 | Actual | $260,981 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0017-02-080 | ||
Length: | 10.9 | ||
Estimate: | $682,061 | ||
Actual: | $486,979 | ||
CCSJ: 0024-07-063 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2021 |
Highway: | US 90 | Let Status: | Actual |
Project ID: | F 2021(778) | CSJ: | 0024-07-063 |
Description: | INTERSECTION IMPROVEMENT | Handling Code: | |
Limits From: | AT MONTGOMERY ROAD | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $2,508,773 |
Length: | 1.1 | Actual | $2,885,971 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0024-07-063 | ||
Length: | 1.1 | ||
Estimate: | $2,508,773 | ||
Actual: | $2,885,971 | ||
CCSJ: 0073-02-080 |
|||
District: | SAN ANTONIO | Let Date: | Jun 2021 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | C 73-2-80 | CSJ: | 0073-02-080 |
Description: | INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TURN LANES | Handling Code: | |
Limits From: | FM 1937 | Fund Cat: | 1 |
Limits To: | 2.6 MI SOUTH OF FM 1937 | ESTIMATE: | $5,066,580 |
Length: | 2.6 | Actual | $4,316,413 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0073-02-080 | ||
Length: | 2.6 | ||
Estimate: | $5,066,580 | ||
Actual: | $4,316,413 | ||
CCSJ: 0073-08-200 |
|||
District: | SAN ANTONIO | Let Date: | Sep 2020 |
Highway: | IH 37 | Let Status: | Actual |
Project ID: | NH 2021(012) | CSJ: | 0073-08-200 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | 0.25 MILES S OF S NEW BRAUNFELS AVE | Fund Cat: | 10 |
Limits To: | S NEW BRAUNFELS AVE | ESTIMATE: | $198,291 |
Length: | 0.2 | Actual | $164,889 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0073-08-200 | ||
Length: | 0.2 | ||
Estimate: | $198,291 | ||
Actual: | $164,889 | ||
CCSJ: 0073-09-040 |
|||
District: | SAN ANTONIO | Let Date: | Jan 2021 |
Highway: | IH 37 | Let Status: | Actual |
Project ID: | NH 2021(226) | CSJ: | 0073-09-040 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: | |
Limits From: | 0.3 MILES S OF HARDY ROAD | Fund Cat: | 10 |
Limits To: | 0.2 MILES N OF HARDY ROAD | ESTIMATE: | $328,444 |
Length: | 0.5 | Actual | $292,836 |
Proposal Request Bid List List Showing Order Bid Tabulations Award Status Back... | Totals for 0073-09-040 | ||
Length: | 0.5 | ||
Estimate: | $328,444 | ||
Actual: | $292,836 | ||
CCSJ: 0073-12-015 |
|||
District: | SAN ANTONIO | Let Date: | May 2021 |
Highway: | US 181 | Let Status: | Actual |
Project ID: | C 73-12-15 | CSJ: | 0073-12-015 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | IH 37 | Fund Cat: | 1 |
Limits To: | SS 122 | ESTIMATE: | $1,450,429 |
Length: | 0.6 | Actual | $971,991 |
District: | SAN ANTONIO | Let Date: | May 2021 |
Highway: | US 181 | Let Status: | Actual |
Project ID: | C 100-2-67 | CSJ: | 0100-02-067 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | SPUR 122 | Fund Cat: | 1 |
Limits To: | BEXAR/WILSON COUNTY LINE | ESTIMATE: | $8,173,326 |
Length: | 7.1 | Actual | $5,450,819 |
District: | SAN ANTONIO | Let Date: | May 2021 |
Highway: | US 87 | Let Status: | Actual |
Project ID: | C 143-1-60 | CSJ: | 0143-01-060 |
Description: | RESURFACE ROADWAY | Handling Code: | |
Limits From: | AMANDA ST. | Fund Cat: | 1 |
Limits To: | IH 410 | ESTIMATE: | $2,942,403 |
Length: | 2.9 | Actual | $1,965,069 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0073-12-015 | ||
Length: | 10.6 | ||
Estimate: | $12,566,158 | ||
Actual: | $8,387,879 | ||
CCSJ: 0100-02-068 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2021 |
Highway: | US 181 | Let Status: | Actual |
Project ID: | F 2021(779) | CSJ: | 0100-02-068 |
Description: | INSTALL FLASHING BEACON | Handling Code: | |
Limits From: | AT KILOWATT RD | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $155,242 |
Length: | 0.2 | Actual | $113,354 |
District: | SAN ANTONIO | Let Date: | Aug 2021 |
Highway: | US 87 | Let Status: | Actual |
Project ID: | F 2021(779) | CSJ: | 0143-01-061 |
Description: | INSTALL FLASHING BEACON | Handling Code: | |
Limits From: | AT KIRKNER RD. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $69,463 |
Length: | 0.2 | Actual | $83,881 |
District: | SAN ANTONIO | Let Date: | Aug 2021 |
Highway: | SH 173 | Let Status: | Actual |
Project ID: | F 2021(780) | CSJ: | 0421-04-034 |
Description: | INSTALL FLASHING BEACON | Handling Code: | |
Limits From: | AT FM 1333 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $54,811 |
Length: | 0.2 | Actual | $62,643 |
District: | SAN ANTONIO | Let Date: | Aug 2021 |
Highway: | FM 1044 | Let Status: | Actual |
Project ID: | F 2021(780) | CSJ: | 2021-02-020 |
Description: | INSTALL FLASHING BEACON | Handling Code: | |
Limits From: | AT YOUNGSFORD RD. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $52,740 |
Length: | 0.2 | Actual | $63,473 |
District: | SAN ANTONIO | Let Date: | Aug 2021 |
Highway: | FM 3009 | Let Status: | Actual |
Project ID: | F 2021(780) | CSJ: | 3107-01-045 |
Description: | INSTALL FLASHING BEACON | Handling Code: | |
Limits From: | AT NATURAL BRIDGE CAVERNS RD. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $68,956 |
Length: | 0.4 | Actual | $88,151 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0100-02-068 | ||
Length: | 1.2 | ||
Estimate: | $401,211 | ||
Actual: | $411,503 | ||
CCSJ: 0521-05-148 |
|||
District: | SAN ANTONIO | Let Date: | Apr 2021 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | STP 2021(486)MM | CSJ: | 0521-05-148 |
Description: | CONSTRUCT RAMPS | Handling Code: | |
Limits From: | FM 2536 -PEARSALL ROAD | Fund Cat: | 1 |
Limits To: | VALLEY HI DRIVE | ESTIMATE: | $19,890,658 |
Length: | 3.6 | Actual | $19,004,543 |
District: | SAN ANTONIO | Let Date: | Apr 2021 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | ROW 521-5-152 | CSJ: | 0521-05-152 |
Description: | RIGHT OF WAY | Handling Code: | |
Limits From: | FM 2536 -PEARSALL ROAD | Fund Cat: | ROW |
Limits To: | VALLEY HI DRIVE | ESTIMATE: | $50,301 |
Length: | 3.6 | Actual | $69,486 |
District: | SAN ANTONIO | Let Date: | Apr 2021 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | C 521-5-156 | CSJ: | 0521-05-156 |
Description: | SURFACING/ROADWAY RESTORATION | Handling Code: | |
Limits From: | FM 2536-PEARSALL RD | Fund Cat: | 1 |
Limits To: | US 90 | ESTIMATE: | $4,006,909 |
Length: | 4.3 | Actual | $3,223,557 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 0521-05-148 | ||
Length: | 11.5 | ||
Estimate: | $23,947,868 | ||
Actual: | $22,297,586 | ||
CCSJ: 0521-06-138 |
|||
District: | SAN ANTONIO | Let Date: | Mar 2021 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | F 2021(404) | CSJ: | 0521-06-138 |
Description: | CONSTRUCT DIRECT CONNECTORS | Handling Code: | |
Limits From: | AT IH 10 E | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | 108,044,335 |
Length: | 1.0 | Actual | $95,603,519 |
District: | SAN ANTONIO | Let Date: | Mar 2021 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | NH 2019(214) | CSJ: | 0521-06-140 |
Description: | RIGHT OF WAY | Handling Code: | |
Limits From: | AT IH 10 E | Fund Cat: | ROW |
Limits To: | . | ESTIMATE: | $3,281,800 |
Length: | 1.0 | Actual | $4,599,151 |
List Showing Order Proposal Request Bid List Bid Tabulations Award Status Back... | Totals for 0521-06-138 | ||
Length: | 2 | ||
Estimate: | $111,326,135 | ||
Actual: | $100,202,671 | ||
CCSJ: 0658-01-045 |
|||
District: | SAN ANTONIO | Let Date: | Jan 2021 |
Highway: | FM 1535 | Let Status: | Actual |
Project ID: | STP 2021(227)MM | CSJ: | 0658-01-045 |
Description: | HIGHWAY IMPROVEMENT | Handling Code: | |
Limits From: | LP 1604 | Fund Cat: | 1 |
Limits To: | HUEBNER ROAD | ESTIMATE: | $10,224,953 |
Length: | 2.1 | Actual | $10,878,266 |
District: | SAN ANTONIO | Let Date: | Jan 2021 |
Highway: | FM 1535 | Let Status: | Actual |
Project ID: | ROW 658-1-46 | CSJ: | 0658-01-046 |
Description: | RIGHT OF WAY | Handling Code: | |
Limits From: | LP 1604 | Fund Cat: | ROW |
Limits To: | HUEBNER ROAD | ESTIMATE: | $3,180,716 |
Length: | 2.1 | Actual | $4,645,102 |
Proposal Request Bid List List Showing Order Bid Tabulations Award Status Back... | Totals for 0658-01-045 | ||
Length: | 4.2 | ||
Estimate: | $13,405,668 | ||
Actual: | $15,523,367 | ||
CCSJ: 0915-00-199 |
|||
District: | SAN ANTONIO | Let Date: | Dec 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 1809(759) | CSJ: | 0915-00-199 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $291,350 |
Length: | 0.0 | Actual | $282,661 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0915-00-199 | ||
Length: | 0 | ||
Estimate: | $291,350 | ||
Actual: | $282,661 | ||
CCSJ: 0915-00-200 |
|||
District: | SAN ANTONIO | Let Date: | May 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 915-00-200 | CSJ: | 0915-00-200 |
Description: | INSTALL ADVANCED TRAFFIC MANAGEMENT SYSTEM | Handling Code: | |
Limits From: | IH 37S: LP 1604S TO LIVE OAK C/L & | Fund Cat: | 1 |
Limits To: | IH 10E: LP 1604E TO GONZALES C/L | ESTIMATE: | $639,149 |
Length: | 0.0 | Actual | $477,879 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0915-00-200 | ||
Length: | 0 | ||
Estimate: | $639,149 | ||
Actual: | $477,879 | ||
CCSJ: 0915-00-202 |
|||
District: | SAN ANTONIO | Let Date: | May 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 915-00-202 | CSJ: | 0915-00-202 |
Description: | PURCHASE AND INSTALL SIGNS & EQUIP | Handling Code: | |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $636,414 |
Length: | 0.0 | Actual | $676,228 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0915-00-202 | ||
Length: | 0 | ||
Estimate: | $636,414 | ||
Actual: | $676,228 | ||
CCSJ: 0915-00-224 |
|||
District: | SAN ANTONIO | Let Date: | Feb 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2021(361) | CSJ: | 0915-00-224 |
Description: | HIGHWAY IMPROVEMENT | Handling Code: | |
Limits From: | VARIOUS LOCATIONS IN BEXAR COUNTY | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $1,502,655 |
Length: | 0.0 | Actual | $1,955,754 |
District: | SAN ANTONIO | Let Date: | Feb 2021 |
Highway: | SH 16 | Let Status: | Actual |
Project ID: | STP 2021(361) | CSJ: | 0613-01-068 |
Description: | INTERSECTION IMPROVEMENT | Handling Code: | |
Limits From: | AT LP 1604 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $669,840 |
Length: | 0.0 | Actual | $809,120 |
Proposal Request Bid List List Showing Order Bid Tabulations Award Status Back... | Totals for 0915-00-224 | ||
Length: | 0 | ||
Estimate: | $2,172,495 | ||
Actual: | $2,764,875 | ||
CCSJ: 0915-00-228 |
|||
District: | SAN ANTONIO | Let Date: | Feb 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2021(362) | CSJ: | 0915-00-228 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | DISTRICTWIDE TRAFFIC CNTRL FY 2021 | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $1,496,283 |
Length: | 0.0 | Actual | $1,625,676 |
Proposal Request Bid List List Showing Order Bid Tabulations Award Status Back... | Totals for 0915-00-228 | ||
Length: | 0 | ||
Estimate: | $1,496,283 | ||
Actual: | $1,625,676 | ||
CCSJ: 0915-00-229 |
|||
District: | SAN ANTONIO | Let Date: | Apr 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 915-00-229 | CSJ: | 0915-00-229 |
Description: | HIGHWAY IMPROVEMENT | Handling Code: | |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $1,084,790 |
Length: | 0.0 | Actual | $916,531 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0915-00-229 | ||
Length: | 0 | ||
Estimate: | $1,084,790 | ||
Actual: | $916,531 | ||
CCSJ: 0915-00-231 |
|||
District: | SAN ANTONIO | Let Date: | Jan 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2021(231) | CSJ: | 0915-00-231 |
Description: | HIGHWAY IMPROVEMENT | Handling Code: | |
Limits From: | VARIOUS LOCATIONS IN MEDINA | Fund Cat: | 1 |
Limits To: | AND ATASCOSA COUNTIES | ESTIMATE: | $3,478,257 |
Length: | 0.0 | Actual | $3,127,185 |
District: | SAN ANTONIO | Let Date: | Jan 2021 |
Highway: | FM 471 | Let Status: | Actual |
Project ID: | STP 2021(352) | CSJ: | 1547-01-051 |
Description: | INTERSECTION IMPROVEMENT | Handling Code: | |
Limits From: | AT BIPPETT (CR 482) | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $346,716 |
Length: | 0.2 | Actual | $289,278 |
Proposal Request Bid List List Showing Order Bid Tabulations Award Status Back... | Totals for 0915-00-231 | ||
Length: | 0.2 | ||
Estimate: | $3,824,973 | ||
Actual: | $3,416,463 | ||
CCSJ: 0915-00-232 |
|||
District: | SAN ANTONIO | Let Date: | Nov 2020 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2021(177) | CSJ: | 0915-00-232 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | DISTRICTWIDE TRAFFIC CNTRL FY 2020 | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $1,505,104 |
Length: | 0.0 | Actual | $1,637,297 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0915-00-232 | ||
Length: | 0 | ||
Estimate: | $1,505,104 | ||
Actual: | $1,637,297 | ||
CCSJ: 0915-00-234 |
|||
District: | SAN ANTONIO | Let Date: | Jul 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | C 915-00-234 | CSJ: | 0915-00-234 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $1,562,265 |
Length: | 0.0 | Actual | $1,384,854 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0915-00-234 | ||
Length: | 0 | ||
Estimate: | $1,562,265 | ||
Actual: | $1,384,854 | ||
CCSJ: 0915-00-235 |
|||
District: | SAN ANTONIO | Let Date: | Apr 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | F 2021(487) | CSJ: | 0915-00-235 |
Description: | TRAFFIC SIGNAL IMPROVEMENTS | Handling Code: | |
Limits From: | DISTRICTWIDE TRAFFIC CNTRL FY 2021 | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $1,496,202 |
Length: | 0.0 | Actual | $1,609,699 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0915-00-235 | ||
Length: | 0 | ||
Estimate: | $1,496,202 | ||
Actual: | $1,609,699 | ||
CCSJ: 0915-12-509 |
|||
District: | SAN ANTONIO | Let Date: | Dec 2020 |
Highway: | CR | Let Status: | Actual |
Project ID: | STP 2020(792)MM | CSJ: | 0915-12-509 |
Description: | WIDEN ROAD - ADD LANES | Handling Code: | LC |
Limits From: | ON BULVERDE RD FROM MARSHALL RD | Fund Cat: | 3 |
Limits To: | WILDERNESS OAK | ESTIMATE: | $8,097,480 |
Length: | 0.0 | Actual | $12,955,794 |
Back... | Totals for 0915-12-509 | ||
Length: | 0 | ||
Estimate: | $8,097,480 | ||
Actual: | $12,955,794 | ||
CCSJ: 0915-12-562 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2021 |
Highway: | CR | Let Status: | Approved |
Project ID: | STP 2021(250)MM | CSJ: | 0915-12-562 |
Description: | WIDEN ROAD - ADD LANES | Handling Code: | LC |
Limits From: | ON WATSON RD FROM FM 2790-SOMERSET | Fund Cat: | 3 |
Limits To: | 0.62 MI EAST TO SOMERSET RD. | ESTIMATE: | $4,886,116 |
Length: | 0.6 | Actual | $0 |
Back... | Totals for 0915-12-562 | ||
Length: | 0.6 | ||
Estimate: | $4,886,116 | ||
Actual: | |||
CCSJ: 0915-12-609 |
|||
District: | SAN ANTONIO | Let Date: | Oct 2020 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2021(208)MM | CSJ: | 0915-12-609 |
Description: | ENGINEERING DESIGN/STUDY | Handling Code: | XX |
Limits From: | IN SAN ANTONIO | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $1,000,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0915-12-609 | ||
Length: | 0 | ||
Estimate: | $1,000,000 | ||
Actual: | |||
CCSJ: 0915-12-610 |
|||
District: | SAN ANTONIO | Let Date: | Dec 2020 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2B20(060)MM | CSJ: | 0915-12-610 |
Description: | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | Handling Code: | LC |
Limits From: | IN SAN ANTONIO | Fund Cat: | 3 |
Limits To: | ALONG SAN PEDRO AVE | ESTIMATE: | $1,000,000 |
Length: | 0.0 | Actual | $519,069 |
Back... | Totals for 0915-12-610 | ||
Length: | 0 | ||
Estimate: | $1,000,000 | ||
Actual: | $519,069 | ||
CCSJ: 0915-12-625 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2021 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2021(676)HES | CSJ: | 0915-12-625 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | ON COMMERCE ST AT HAMILTON AVE | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $238,945 |
Length: | 0.2 | Actual | $219,383 |
District: | SAN ANTONIO | Let Date: | Aug 2021 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2021(676)HES | CSJ: | 0915-12-631 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | ON FLORES ST AT SOUTHCROSS BLVD | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $264,011 |
Length: | 0.2 | Actual | $239,931 |
District: | SAN ANTONIO | Let Date: | Aug 2021 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2021(676)HES | CSJ: | 0915-12-648 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | ON SAN PEDRO AVE AT JACKSON KELLER | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $365,316 |
Length: | 0.0 | Actual | $348,426 |
District: | SAN ANTONIO | Let Date: | Aug 2021 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2021(676)HES | CSJ: | 0915-12-650 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | ON SANTA ROSA ST AT MARTIN ST | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $329,644 |
Length: | 0.2 | Actual | $307,537 |
District: | SAN ANTONIO | Let Date: | Aug 2021 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2021(676)HES | CSJ: | 0915-12-652 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | ON NEW BRAUNSFELS AVE AT PORTER | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $72,276 |
Length: | 0.2 | Actual | $69,605 |
District: | SAN ANTONIO | Let Date: | Aug 2021 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2021(676)HES | CSJ: | 0915-12-653 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | ON VANCE JACKSON AVE AT GARDINA ST | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $248,761 |
Length: | 0.2 | Actual | $221,906 |
District: | SAN ANTONIO | Let Date: | Aug 2021 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2021(676)HES | CSJ: | 0915-12-659 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | ON FREDERICKSBURG RD AT ZARZAMORA | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $88,026 |
Length: | 0.2 | Actual | $87,593 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0915-12-625 | ||
Length: | 1.2 | ||
Estimate: | $1,606,979 | ||
Actual: | $1,494,380 | ||
CCSJ: 0915-12-633 |
|||
District: | SAN ANTONIO | Let Date: | Feb 2021 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2021(363)HESG | CSJ: | 0915-12-633 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | ON GENERAL MCMULLEN AT CERALVO ST | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $304,610 |
Length: | 0.2 | Actual | $266,398 |
District: | SAN ANTONIO | Let Date: | Feb 2021 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2021(363)HESG | CSJ: | 0915-12-634 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | ON GENERAL MCMULLEN DR | Fund Cat: | 3 |
Limits To: | AT CASTROVILLE RD | ESTIMATE: | $296,294 |
Length: | 0.2 | Actual | $284,099 |
District: | SAN ANTONIO | Let Date: | Feb 2021 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2021(363)HESG | CSJ: | 0915-12-635 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | ON GENERAL MCMULLEN DR | Fund Cat: | 3 |
Limits To: | AT COMMERCE ST | ESTIMATE: | $332,699 |
Length: | 0.2 | Actual | $322,029 |
Proposal Request Bid List List Showing Order Bid Tabulations Award Status Back... | Totals for 0915-12-633 | ||
Length: | 0.6 | ||
Estimate: | $933,602 | ||
Actual: | $872,525 | ||
CCSJ: 0915-12-664 |
|||
District: | SAN ANTONIO | Let Date: | Mar 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2021(405) | CSJ: | 0915-12-664 |
Description: | INSTALL ADVANCED TRAFFIC MANAGEMENT SYSTEM | Handling Code: | |
Limits From: | VARIOUS LOCATION ON | Fund Cat: | 1 |
Limits To: | IH 35 S AND IH 37 S | ESTIMATE: | $4,939,085 |
Length: | 0.0 | Actual | $5,046,004 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 0915-12-664 | ||
Length: | 0 | ||
Estimate: | $4,939,085 | ||
Actual: | $5,046,004 | ||
CCSJ: 0915-12-665 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2021 |
Highway: | VA | Let Status: | Tentative |
Project ID: | CM 2021(964) | CSJ: | 0915-12-665 |
Description: | TRANSPORTATION NON-ROADWAY | Handling Code: | XX |
Limits From: | IN BEXAR COUNTY | Fund Cat: | 5 |
Limits To: | . | ESTIMATE: | $75,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0915-12-665 | ||
Length: | 0 | ||
Estimate: | $75,000 | ||
Actual: | |||
CCSJ: 0915-12-667 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2021(935) | CSJ: | 0915-12-667 |
Description: | TRANSPORTATION NON-ROADWAY | Handling Code: | XX |
Limits From: | VARIOUS LOCATIONS WITHIN | Fund Cat: | 3 |
Limits To: | THE CITY OF SAN ANTONIO | ESTIMATE: | $1,500,000 |
Length: | 0.0 | Actual | $1,500,000 |
Back... | Totals for 0915-12-667 | ||
Length: | 0 | ||
Estimate: | $1,500,000 | ||
Actual: | $1,500,000 | ||
CCSJ: 0915-12-668 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2021 |
Highway: | VA | Let Status: | Approved |
Project ID: | CM 2021(782) | CSJ: | 0915-12-668 |
Description: | INTEGRATED CORRIDOR MANAGEMENT | Handling Code: | LC |
Limits From: | VARIOUS LOCATIONS WITHIN | Fund Cat: | 3 |
Limits To: | THE CITY OF SAN ANTONIO | ESTIMATE: | $1,000,000 |
Length: | 0.0 | Actual | $0 |
District: | SAN ANTONIO | Let Date: | Aug 2021 |
Highway: | VA | Let Status: | Approved |
Project ID: | CM 2021(782) | CSJ: | 0915-12-674 |
Description: | INTEGRATED CORRIDOR MANAGEMENT | Handling Code: | LC |
Limits From: | VARIOUS LOCATIONS WITHIN | Fund Cat: | 3 |
Limits To: | THE CITY OF SAN ANTONIO | ESTIMATE: | $1,000,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0915-12-668 | ||
Length: | 0 | ||
Estimate: | $2,000,000 | ||
Actual: | |||
CCSJ: 0915-12-669 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2021 |
Highway: | VA | Let Status: | Tentative |
Project ID: | CM 2021(962) | CSJ: | 0915-12-669 |
Description: | TRANSPORTATION NON-ROADWAY | Handling Code: | XX |
Limits From: | IN THE CITY OF SAN ANTONIO | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $250,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0915-12-669 | ||
Length: | 0 | ||
Estimate: | $250,000 | ||
Actual: | |||
CCSJ: 0915-12-671 |
|||
District: | SAN ANTONIO | Let Date: | Jan 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2021(456) | CSJ: | 0915-12-671 |
Description: | TRANSPORTATION NON-ROADWAY | Handling Code: | XX |
Limits From: | UNIVERSITY OF TEXAS AT SAN ANTONIO | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $129,855 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0915-12-671 | ||
Length: | 0 | ||
Estimate: | $129,855 | ||
Actual: | |||
CCSJ: 0915-12-678 |
|||
District: | SAN ANTONIO | Let Date: | Aug 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2021(963) | CSJ: | 0915-12-678 |
Description: | TRANSPORTATION NON-ROADWAY | Handling Code: | XX |
Limits From: | UNIVERSITY OF TEXAS AT SAN ANTONIO | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $129,225 |
Length: | 0.0 | Actual | $129,225 |
Back... | Totals for 0915-12-678 | ||
Length: | 0 | ||
Estimate: | $129,225 | ||
Actual: | $129,225 | ||
CCSJ: 0915-12-679 |
|||
District: | SAN ANTONIO | Let Date: | Feb 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2021(507) | CSJ: | 0915-12-679 |
Description: | TRANSIT | Handling Code: | TR |
Limits From: | IN VIA SERVICE AREA | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $7,553,334 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0915-12-679 | ||
Length: | 0 | ||
Estimate: | $7,553,334 | ||
Actual: | |||
CCSJ: 0915-12-680 |
|||
District: | SAN ANTONIO | Let Date: | Feb 2021 |
Highway: | VA | Let Status: | Actual |
Project ID: | CM 2021(508) | CSJ: | 0915-12-680 |
Description: | TRANSIT SYSTEM OPERATIONS | Handling Code: | TR |
Limits From: | IN VIA SERVICE AREA | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $2,181,429 |
Length: | 0.0 | Actual | $2,181,430 |
Back... | Totals for 0915-12-680 | ||
Length: | 0 | ||
Estimate: | $2,181,429 | ||
Actual: | $2,181,430 | ||
CCSJ: 2452-02-083 |
|||
District: | SAN ANTONIO | Let Date: | Apr 2021 |
Highway: | SL 1604 | Let Status: | Actual |
Project ID: | F 2021(488) | CSJ: | 2452-02-083 |
Description: | WIDEN ROAD - ADD LANES | Handling Code: | |
Limits From: | SH 16 | Fund Cat: | 1 |
Limits To: | IH 10 | ESTIMATE: | 166,009,497 |
Length: | 5.3 | Actual | 144,233,735 |
District: | SAN ANTONIO | Let Date: | Apr 2021 |
Highway: | SL 1604 | Let Status: | Actual |
Project ID: | ROW 2452-2-132 | CSJ: | 2452-02-132 |
Description: | RIGHT OF WAY | Handling Code: | |
Limits From: | SH 16 | Fund Cat: | ROW |
Limits To: | IH 10 | ESTIMATE: | $2,809,935 |
Length: | 5.3 | Actual | $3,839,369 |
Proposal Request List Showing Order Bid List Bid Tabulations Award Status Back... | Totals for 2452-02-083 | ||
Length: | 10.6 | ||
Estimate: | $168,819,432 | ||
Actual: | $148,073,104 | ||
CCSJ: 2452-02-128 |
|||
District: | SAN ANTONIO | Let Date: | Jun 2021 |
Highway: | SL 1604 | Let Status: | Actual |
Project ID: | STP 2021(616)MM | CSJ: | 2452-02-128 |
Description: | WIDEN ROAD - ADD LANES | Handling Code: | |
Limits From: | IH 10 | Fund Cat: | 1 |
Limits To: | US 281 | ESTIMATE: | 206,543,262 |
Length: | 8.0 | Actual | 195,816,873 |
District: | SAN ANTONIO | Let Date: | Jun 2021 |
Highway: | SL 1604 | Let Status: | Actual |
Project ID: | F 2021(615) | CSJ: | 2452-02-117 |
Description: | HIGHWAY IMPROVEMENT | Handling Code: | |
Limits From: | AT FM 2696- BLANCO RD | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $40,136,013 |
Length: | 0.5 | Actual | $36,911,674 |
District: | SAN ANTONIO | Let Date: | Jun 2021 |
Highway: | SL 1604 | Let Status: | Actual |
Project ID: | ROW 2452-2-121 | CSJ: | 2452-02-121 |
Description: | RIGHT OF WAY | Handling Code: | |
Limits From: | AT FM 2696- BLANCO RD | Fund Cat: | ROW |
Limits To: | . | ESTIMATE: | $5,783,043 |
Length: | 0.5 | Actual | $6,764,543 |
District: | SAN ANTONIO | Let Date: | Jun 2021 |
Highway: | SL 1604 | Let Status: | Actual |
Project ID: | ROW 2452-2-131 | CSJ: | 2452-02-131 |
Description: | RIGHT OF WAY | Handling Code: | |
Limits From: | IH 10 | Fund Cat: | ROW |
Limits To: | US 281 | ESTIMATE: | $3,782,800 |
Length: | 8.0 | Actual | $4,448,755 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 2452-02-128 | ||
Length: | 17 | ||
Estimate: | $256,245,119 | ||
Actual: | $243,941,845 | ||
CCSJ: 3544-04-002 |
|||
District: | SAN ANTONIO | Let Date: | Nov 2020 |
Highway: | SH 211 | Let Status: | Actual |
Project ID: | PTF 1702(682) | CSJ: | 3544-04-002 |
Description: | CONSTRUCT NEW ROAD | Handling Code: | LC |
Limits From: | FM 1957 (POTRANCO RD), N 2.9 MI | Fund Cat: | 3 |
Limits To: | MEDINA C/L | ESTIMATE: | $7,000,001 |
Length: | 2.9 | Actual | $12,572,434 |
District: | SAN ANTONIO | Let Date: | Nov 2020 |
Highway: | SH 211 | Let Status: | Actual |
Project ID: | PTF 1702(682) | CSJ: | 3544-03-002 |
Description: | CONSTRUCT NEW ROAD | Handling Code: | LC |
Limits From: | BEXAR C/L, 2.0 MI S OF FM 471, N | Fund Cat: | 3 |
Limits To: | FM 471 (CULEBRA RD) | ESTIMATE: | $4,400,000 |
Length: | 2.0 | Actual | $4,009,004 |
District: | SAN ANTONIO | Let Date: | Nov 2020 |
Highway: | SH 211 | Let Status: | Actual |
Project ID: | PTF 1702(682) | CSJ: | 3544-05-001 |
Description: | CONSTRUCT NEW ROAD | Handling Code: | LC |
Limits From: | MEDINA C/L, 4.5 MI N OF FM 1957, N | Fund Cat: | 3 |
Limits To: | MEDINA C/L, 2.0 MI S OF FM 471 | ESTIMATE: | $2,600,001 |
Length: | 1.1 | Actual | $2,486,599 |
District: | SAN ANTONIO | Let Date: | Nov 2020 |
Highway: | SH 211 | Let Status: | Actual |
Project ID: | PTF 1702(682) | CSJ: | 3544-06-001 |
Description: | CONSTRUCT NEW ROAD | Handling Code: | LC |
Limits From: | BEXAR C/L, 2.9 MI N OF FM 1957, N | Fund Cat: | 3 |
Limits To: | BEXAR C/L, 4.5 MI N OF FM 1957 | ESTIMATE: | $4,100,000 |
Length: | 1.6 | Actual | $4,273,998 |
Back... | Totals for 3544-04-002 | ||
Length: | 7.6 | ||
Estimate: | $18,100,001 | ||
Actual: | $23,342,035 | ||
CCSJ: 7774-01-004 |
|||
District: | SAN ANTONIO | Let Date: | Jul 2021 |
Highway: | PA 1502 | Let Status: | Actual |
Project ID: | F 2021(678) | CSJ: | 7774-01-004 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | FM 1535 | Fund Cat: | 8 |
Limits To: | O'CONNOR/CROSSWINDS WAY | ESTIMATE: | $22,969,734 |
Length: | 10.7 | Actual | $19,520,130 |
Proposal Request List Showing Order Bid List Addenda Bid Tabulations Award Status Back... | Totals for 7774-01-004 | ||
Length: | 10.7 | ||
Estimate: | $22,969,734 | ||
Actual: | $19,520,130 |
Handling Code | Definition |
---|---|
XX | Project not processed through statewide letting |
TR | Transfer of funds |
LC | Project let through local entity |
LC | Project not charged against district apportionment |
Let Status | Definition |
---|---|
Tentative | Estimated letting date for this project |
Approved | Project has administrative approval to be let |
Actual | Project was let to contract |