Detail Letting Schedule for Dallas County (FY 2020)

Last Update: Tuesday, August 13, 2024

Bid Tabulations Dashboard

This report will no longer be updated, please access links on the Contract Letting page.

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Dallas County (FY 2020)

CCSJ: 0009-02-065

District:DALLASLet Date:Mar 2020
Highway:SH 78Let Status:Tentative
Project ID:STP ( )CSJ:0009-02-065
Description:MILL, FULL DEPTH REPAIR & OVERLAYHandling
Code:
 
Limits From:LEON RDFund Cat:1
Limits To:STRATFORD DRESTIMATE:$1,129,509
Length:0.7Actual$0
 
District:DALLASLet Date:Mar 2020
Highway:US 80Let Status:Tentative
Project ID:STP ( )CSJ:0095-02-117
Description:REHABILITATE EXISTING ROADWAYHandling
Code:
 
Limits From:PRESIDENTIAL ROWFund Cat:1
Limits To:GALLOWAY AVENUEESTIMATE:$793,555
Length:0.8Actual$0
 
Back...
Totals for 0009-02-065
Length:1.5
Estimate:$1,923,064
Actual:

CCSJ: 0048-01-063

District:DALLASLet Date:Mar 2020
Highway:SH 342Let Status:Tentative
Project ID:STP ( )CSJ:0048-01-063
Description:REHABILITATE EXISTING ROADWAYHandling
Code:
 
Limits From:SIMPSON STUART RDFund Cat:1
Limits To:SL 12ESTIMATE:$2,002,773
Length:1.8Actual$0
 
District:DALLASLet Date:Mar 2020
Highway:SH 342Let Status:Tentative
Project ID:STP ( )CSJ:0048-01-066
Description:REHABILITATE EXISTING ROADWAYHandling
Code:
 
Limits From:BELTLINE ROADFund Cat:1
Limits To:IH 20ESTIMATE:$4,765,585
Length:13.1Actual$0
 
Proposal Request
Back...
Totals for 0048-01-063
Length:14.9
Estimate:$6,768,358
Actual:

CCSJ: 0091-06-059

District:DALLASLet Date:Jun 2020
Highway:SH 289Let Status:Tentative
Project ID:STP ( )HESCSJ:0091-06-059
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:AT CAMPBELL RDFund Cat:8
Limits To:IN THE CITY OF DALLASESTIMATE:$302,665
Length:0.2Actual$0
 
District:DALLASLet Date:Jun 2020
Highway:SL 12Let Status:Tentative
Project ID:STP ( )HESCSJ:0581-01-146
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:AT LAKE JUNE RDFund Cat:8
Limits To:IN THE CITY OF DALLASESTIMATE:$281,299
Length:0.2Actual$0
 
District:DALLASLet Date:Jun 2020
Highway:SL 12Let Status:Tentative
Project ID:STP ( )HESCSJ:0581-01-148
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:AT FORNEY RDFund Cat:8
Limits To:IN THE CITY OF DALLASESTIMATE:$309,365
Length:0.2Actual$0
 
District:DALLASLet Date:Jun 2020
Highway:SL 12Let Status:Tentative
Project ID:STP ( )HESCSJ:0581-01-150
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:AT JIM MILLER RDFund Cat:8
Limits To:IN THE CITY OF DALLASESTIMATE:$310,986
Length:0.2Actual$0
 
District:DALLASLet Date:Jun 2020
Highway:SL 12Let Status:Tentative
Project ID:STP ( )HESCSJ:0581-01-151
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:AT SINGING HILLSFund Cat:8
Limits To:IN THE CITY OF DALLASESTIMATE:$220,714
Length:0.2Actual$0
 
Back...
Totals for 0091-06-059
Length:1
Estimate:$1,425,029
Actual:

CCSJ: 0196-03-279

District:DALLASLet Date:Mar 2020
Highway:IH 35ELet Status:Tentative
Project ID:NH ( )CSJ:0196-03-279
Description:REPLACEMENT OF LIGHTING CONDUIT, CONDUCTORS AND SERVICESHandling
Code:
 
Limits From:SOUTH OF OAK LAWN AVEFund Cat:1
Limits To:HARRY HINES BLVDESTIMATE:$1,500,941
Length:5.5Actual$0
 
Back...
Totals for 0196-03-279
Length:5.5
Estimate:$0
Actual:TOTAL

CCSJ: 0197-02-127

District:DALLASLet Date:Jun 2020
Highway:US 175Let Status:Tentative
Project ID:STP ( )HESCSJ:0197-02-127
Description:Install/Replace SignsHandling
Code:
 
Limits From:LA PAZ DRFund Cat:8
Limits To:S PRAIRIE CREEK RDESTIMATE:$379,507
Length:0.4Actual$0
 
Back...
Totals for 0197-02-127
Length:0.4
Estimate:$379,507
Actual:

CCSJ: 0430-01-057

District:DALLASLet Date:Mar 2020
Highway:SH 352Let Status:Tentative
Project ID:NH ( )CSJ:0430-01-057
Description:Repair RoadwayHandling
Code:
 
Limits From:NORTH OF KEARNEY STREETFund Cat:11
Limits To:US 80 EB FRONTAGE RDESTIMATE:$8,711,890
Length:1.1Actual$0
 
Back...
Totals for 0430-01-057
Length:1.1
Estimate:$8,711,890
Actual:

CCSJ: 0918-00-206

District:DALLASLet Date:May 2020
Highway:VALet Status:Tentative
Project ID:CM ( )CSJ:0918-00-206
Description:REGIONAL ITS FUNDING POOLHandling
Code:
XX
Limits From:NCTCOG REGIONAL ITS FUNDING POOLFund Cat:5
Limits To:FY 2019ESTIMATE:$1,150,000
Length:0.0Actual$0
 
Back...
Totals for 0918-00-206
Length:0
Estimate:$1,150,000
Actual:

CCSJ: 0918-00-218

District:DALLASLet Date:Apr 2020
Highway:VALet Status:Tentative
Project ID:CM ( )CSJ:0918-00-218
Description:SUSTAINABLE DEVELOPMENT INITIATIVES; SAFETY AUDIT ANDHandling
Code:
XX
Limits From:REGIONAL BICYCLE AND PEDESTRIANFund Cat:3
Limits To:SUSTAINABLE DEVELOPMENT (FY 2016)ESTIMATE:$892,819
Length:0.0Actual$0
 
Back...
Totals for 0918-00-218
Length:0
Estimate:$892,819
Actual:

CCSJ: 0918-00-219

District:DALLASLet Date:May 2020
Highway:VALet Status:Tentative
Project ID:CM ( )CSJ:0918-00-219
Description:REGIONAL ITS FUNDING POOLHandling
Code:
XX
Limits From:NCTCOG REGIONAL ITS FUNDING POOLFund Cat:5
Limits To:FY 2020ESTIMATE:$991,874
Length:0.0Actual$0
 
Back...
Totals for 0918-00-219
Length:0
Estimate:$991,874
Actual:

CCSJ: 0918-00-277

District:DALLASLet Date:Jan 2020
Highway:VALet Status:Tentative
Project ID:STP ()CSJ:0918-00-277
Description:Transportation Non-RoadwayHandling
Code:
XX
Limits From:VARIOUS LOCATIONSFund Cat:1
Limits To:.ESTIMATE:$300,000
Length:0.0Actual$0
 
Back...
Totals for 0918-00-277
Length:0
Estimate:$300,000
Actual:

CCSJ: 0918-00-289

District:DALLASLet Date:Jan 2020
Highway:VALet Status:Tentative
Project ID:STP ( )CSJ:0918-00-289
Description:DMS REHABILITATIONHandling
Code:
 
Limits From:VARIOUS LOCATIONSFund Cat:1
Limits To:IN THE DALLAS DISTRICTESTIMATE:$1,071,589
Length:0.0Actual$0
 
Back...
Totals for 0918-00-289
Length:0
Estimate:$1,071,589
Actual:

CCSJ: 0918-47-073

District:DALLASLet Date:Aug 2020
Highway:CSLet Status:Tentative
Project ID:HP ( )CSJ:0918-47-073
Description:PLANNING AND IMPLEMENTATION STUDY FOR IRVING BLVD/2ND ST TOHandling
Code:
XX
Limits From:IRVING BLVD CORRIDOR ENHANCEMENTSFund Cat:3
Limits To:FROM IRBY LN E TO N O'CONNOR BLVDESTIMATE:$380,000
Length:0.0Actual$0
 
Back...
Totals for 0918-47-073
Length:0
Estimate:$380,000
Actual:

CCSJ: 0918-47-077

District:DALLASLet Date:Aug 2020
Highway:CSLet Status:Tentative
Project ID:CM 1702(595)CSJ:0918-47-077
Description:BIKE AND PEDESTRIAN IMPROVEMENTSHandling
Code:
LC
Limits From:ON DUCK CREEK TRAIL, FROM PLANO RDFund Cat:3
Limits To:CAMPBELL/US 75 IN RICHARDSONESTIMATE:$2,615,804
Length:0.0Actual$0
 
Back...
Totals for 0918-47-077
Length:0
Estimate:$2,615,804
Actual:

CCSJ: 0918-47-144

District:DALLASLet Date:Aug 2020
Highway:CSLet Status:Tentative
Project ID:CM 2019(465)CSJ:0918-47-144
Description:SKYLINE TRAIL - CONSTRUCT HIKE AND BIKE TRAILHandling
Code:
LC
Limits From:ALONG TOWN EAST BLVD FROM MILITARYFund Cat:3
Limits To:SKYLINE DRESTIMATE:$500,000
Length:0.7Actual$0
 
Back...
Totals for 0918-47-144
Length:0.7
Estimate:$500,000
Actual:

CCSJ: 0918-47-179

District:DALLASLet Date:Feb 2020
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-179
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:DNT-INWOOD AT HARVEST HILL RDFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$394,139
Length:0.2Actual$0
 
District:DALLASLet Date:Feb 2020
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-185
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:ON CAMPBELL RD AT HILLCREST RDFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$335,073
Length:0.2Actual$0
 
District:DALLASLet Date:Feb 2020
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-186
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:ON DOUGLAS AVE AT LEMMON AVEFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$268,779
Length:0.2Actual$0
 
District:DALLASLet Date:Feb 2020
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-187
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:ON AIRDROME DR AT LEMMON AVEFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$268,156
Length:0.2Actual$0
 
District:DALLASLet Date:Feb 2020
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-188
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:ON HARRY HINES BLVD AT MOODY STFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$329,833
Length:0.2Actual$0
 
District:DALLASLet Date:Feb 2020
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-193
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:ON LEMMON AVE AT WELBORN STFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$274,432
Length:0.2Actual$0
 
Back...
Totals for 0918-47-179
Length:1.2
Estimate:$1,870,412
Actual:

CCSJ: 0918-47-180

District:DALLASLet Date:Nov 2019
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-180
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:ON ILLINOIS AVE AT KIEST BLVDFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$338,647
Length:0.2Actual$0
 
District:DALLASLet Date:Nov 2019
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-182
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:ON MOCKINGBIRD LN AT WILLIAMSON RDFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$266,911
Length:0.2Actual$0
 
District:DALLASLet Date:Nov 2019
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-183
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:ON ELAM RD AT PRAIRIE CREEK RDFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$314,828
Length:0.2Actual$0
 
District:DALLASLet Date:Nov 2019
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-184
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:ON CORINTH ST AT ILLINOIS AVEFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$314,021
Length:0.2Actual$0
 
District:DALLASLet Date:Nov 2019
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-192
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:ON JEFFERSON BLVD @ WESTMORELAND RDFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$376,447
Length:0.2Actual$0
 
District:DALLASLet Date:Nov 2019
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-194
Description:IMPROVE TRAFFIC SIGNALSHandling
Code:
 
Limits From:ON MLK BLVD AT HOLMES STFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$267,492
Length:0.2Actual$0
 
Bid List
Back...
Totals for 0918-47-180
Length:1.2
Estimate:$1,878,346
Actual:

CCSJ: 0918-47-199

District:DALLASLet Date:Jul 2020
Highway:CSLet Status:Tentative
Project ID:STP ( )FRS4CSJ:0918-47-199
Description:INSTALL RAILROAD CROSSING PROTECTION DEVICESHandling
Code:
XX
Limits From:CEDAR SPRINGS RD IN DALLASFund Cat:8
Limits To:AT DGNO DOT # 414 842TESTIMATE:$300,000
Length:0.2Actual$0
 
Back...
Totals for 0918-47-199
Length:0.2
Estimate:$300,000
Actual:

CCSJ: 0918-47-200

District:DALLASLet Date:Jul 2020
Highway:CSLet Status:Tentative
Project ID:STP ( )FRS4CSJ:0918-47-200
Description:INSTALL RAILROAD CROSSING PROTECTION DEVICESHandling
Code:
XX
Limits From:MARKET CENTER BLVD IN DALLASFund Cat:8
Limits To:AT TRE DOT# 597 759WESTIMATE:$200,000
Length:0.2Actual$0
 
Back...
Totals for 0918-47-200
Length:0.2
Estimate:$200,000
Actual:

CCSJ: 0918-47-202

District:DALLASLet Date:Aug 2020
Highway:CSLet Status:Tentative
Project ID:STP ( )TPCSJ:0918-47-202
Description:SHARED-USE PATH AND PEDESTRIAN IMPROVEMENTHandling
Code:
LC
Limits From:S CLARK RD TR VELOWEB;RED OAK CR TRFund Cat:3
Limits To:E BELT LINE RDESTIMATE:$1,316,439
Length:0.0Actual$0
 
Back...
Totals for 0918-47-202
Length:0
Estimate:$1,316,439
Actual:

CCSJ: 0918-47-204

District:DALLASLet Date:Aug 2020
Highway:VALet Status:Tentative
Project ID:STP ( )TPCSJ:0918-47-204
Description:SAFETY LIGHTING ALONG EXISTING RIDGEWOOD TRLHandling
Code:
LC
Limits From:UNIVERSITY CROSSING TRAIL LIGHTINGFund Cat:3
Limits To:FROM ELLSWORTH AVE TO SKILLMAN STESTIMATE:$859,100
Length:0.0Actual$0
 
Back...
Totals for 0918-47-204
Length:0
Estimate:$859,100
Actual:

CCSJ: 0918-47-207

District:DALLASLet Date:Aug 2020
Highway:VALet Status:Tentative
Project ID:STP ( )TPCSJ:0918-47-207
Description:SAFE ROUTES TO SCHOOL PEDESTRIAN IMPROVEMENT IN PROXIMITY TOHandling
Code:
LC
Limits From:MILLER RD AND CHIESA RD SIDEWALKFund Cat:3
Limits To:.ESTIMATE:$436,685
Length:0.0Actual$0
 
Back...
Totals for 0918-47-207
Length:0
Estimate:$436,685
Actual:

CCSJ: 0918-47-209

District:DALLASLet Date:Aug 2020
Highway:CSLet Status:Tentative
Project ID:STP 1092(098)TPCSJ:0918-47-209
Description:Bicycle And Pedestrian ImprovementsHandling
Code:
LC
Limits From:SIDEWALKS IN VARIOUS LOCATIONSFund Cat:3
Limits To:IN CITY OF CEDAR HILLESTIMATE:$1,949,824
Length:0.0Actual$0
 
Back...
Totals for 0918-47-209
Length:0
Estimate:$1,949,824
Actual:

CCSJ: 0918-47-227

District:DALLASLet Date:Apr 2020
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-227
Description:IMPROVE TRAFFIC SIGNAL, INSTALL SIDEWALKSHandling
Code:
 
Limits From:WEBB CHAPEL EXT AT LARGA DRFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$312,737
Length:0.2Actual$0
 
District:DALLASLet Date:Apr 2020
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-228
Description:IMPROVE TRAFFIC SIGNAL, INSTALL SIDEWALKSHandling
Code:
 
Limits From:ILLINOIS AVE AT DUNCANVILLE RDFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$356,264
Length:0.2Actual$0
 
District:DALLASLet Date:Apr 2020
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-229
Description:IMPROVE TRAFFIC SIGNAL, INSTALL SIDEWALKSHandling
Code:
 
Limits From:WHEATLAND RD AT BOLTON BOONE DRFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$312,041
Length:0.2Actual$0
 
District:DALLASLet Date:Apr 2020
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-230
Description:IMPROVE TRAFFIC SIGNAL, INSTALL SIDEWALKSHandling
Code:
 
Limits From:LAKE JUNE RD AT HOLCOMB RDFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$312,715
Length:0.2Actual$0
 
District:DALLASLet Date:Apr 2020
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-231
Description:IMPROVE TRAFFIC SIGNAL, INSTALL SIDEWALKSHandling
Code:
 
Limits From:COMMERCE ST AT GRIFFIN STFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$245,067
Length:0.2Actual$0
 
District:DALLASLet Date:Apr 2020
Highway:CSLet Status:Tentative
Project ID:STP ( )HESCSJ:0918-47-232
Description:IMPROVE TRAFFIC SIGNAL, INSTALL SIDEWALKSHandling
Code:
 
Limits From:AUDELIA RD AT ROYAL LNFund Cat:3
Limits To:IN THE CITY OF DALLASESTIMATE:$341,282
Length:0.2Actual$0
 
Proposal Request
Back...
Totals for 0918-47-227
Length:1.2
Estimate:$1,880,106
Actual:

CCSJ: 0918-47-269

District:DALLASLet Date:Aug 2020
Highway:CSLet Status:Tentative
Project ID:C 918-47-269CSJ:0918-47-269
Description:RECONSTRUCT FROM 3 TO 2 LANES WITH A BICYCLE LANE, SIDEWALKHandling
Code:
XX
Limits From:ON SH 356/IRVING BLVD FROM O'CONNORFund Cat:3
Limits To:STRICKLAND PLAZAESTIMATE:$12,000,000
Length:0.1Actual$0
 
Back...
Totals for 0918-47-269
Length:0.1
Estimate:$12,000,000
Actual:

Handling CodeDefinition
XXProject not processed through statewide letting
TRTransfer of funds
LCProject let through local entity
LCProject not charged against district apportionment



Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract