Letting Schedule for January, 2019 County (FY 2019)
Bid Tabulations Dashboard
Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
|
January, 2019 (FY 2019) | (see Links) |
SEP 2018 | OCT 2018 | NOV 2018 | DEC 2018 | JAN 2019 | FEB 2019 | MAR 2019 | APR 2019 | MAY 2019 | JUN 2019 | JUL 2019 | AUG 2019 | | |||||||
CCSJ | County/ District | Highway | Let Status | Contract Cost | Fund Cat | Description | DBE Goal |
---|---|---|---|---|---|---|---|
0527-03-027 | Austin/ Yoakum | FM 1458 | Actual | $38,511 | 10 | EMERGENCY REPAIR-FHWA ER | 0.0 |
1411-02-013 | Austin/ Yoakum | FM 1457 | Actual | $13,282 | 10 | EMERGENCY REPAIR | 0.0 |
0446-06-015 | Austin/ Yoakum | FM 1093 | Actual | $9,745 | 10 | EMERGENCY REPAIR-FHWA ER | 0.0 |
0471-05-046 | Bastrop/ Austin | SH 21 | Actual | $549,851 | 8 | INSTALL TRAFFIC SIGNAL | 0.0 |
0100-08-099 | Bee/ Corpus Christi | US 181 | Actual | $17,340 | 10 | EMERGENCY WORK REPAIR FOR SMALL SIGNS, FLASHING BEACONS, ILL | 0.0 |
0015-14-126 | Bell/ Waco | IH 35 | Actual | $7,788,332 | 1 | MILL AND PFC OVERLAY | 0.0 |
0836-02-075 | Bell/ Waco | SH 195 | Actual | $320,716 | 8 | INSTALL TRAFFIC SIGNAL, ADVANCED WARNING SIGNAL, AND SIGNS | 0.0 |
0184-03-038 | Bell/ Waco | SH 53 | Actual | $1,204,128 | 1 | MILL/OVERLAY | 0.0 |
0320-01-073 | Bell/ Waco | SS 290 | Actual | $1,421,278 | 11 | MILL AND INLAY | 0.0 |
0113-03-031 | Blanco/ Austin | US 290 | Actual | $1,648,000 | 1 | FULL DEPTH REPAIR, UNDERSEAL AND TOM | 0.0 |
0111-09-043 | Brazoria/ Houston | BS 288B | Actual | $296,773 | 10 | LANDSCAPE DEVELOPMENT | 0.0 |
0186-04-032 | Burleson/ Bryan | SH 36 | Actual | $130,129 | 11 | GOVERNORS COMMUNITY ACHIEVEMENT AWARD PROJECT TO IMPROVE | 0.0 |
0144-04-042 | Calhoun/ Yoakum | SH 238 | Actual | $15,857 | 10 | EMERGENCY REPAIR-FHWA ER | 0.0 |
0580-01-036 | Calhoun/ Yoakum | SH 316 | Actual | $52,027 | 10 | EMERGENCY REPAIR-FHWA ER | 0.0 |
0432-01-066 | Calhoun/ Yoakum | SH 185 | Actual | $25,955 | 10 | EMERGENCY REPAIR-FHWA ER | 0.0 |
0144-03-042 | Calhoun/ Yoakum | US 87 | Actual | $15,719 | 10 | EMERGENCY REPAIR-FHWA ER | 0.0 |
0437-02-017 | Callahan/ Abilene | US 283 | Actual | $3,706,738 | 11 | 3"OVERLAY | 4.0 |
0327-08-097 | Cameron/ Pharr | BU 77-X | Actual | $1,904,500 | 8 | HAZARD ELIMINATION & SAFETY | 0.0 |
0275-04-052 | Carson/ Amarillo | IH 40 | Actual | $8,055,543 | 1 | BRIDGE JOINTS AND OVERLAY | 0.0 |
0926-01-023 | Cherokee/ Tyler | FM 343 | Actual | $741,897 | 1 | IMPROVE DRAINAGE AND CULVERTS FOR SAFETY | 0.0 |
0345-03-023 | Cherokee/ Tyler | SH 110 | Actual | $777,263 | 8 | INSTALL PROFILE EDGELINE & CENTERLINE MARKINGS | 0.0 |
0925-00-069 | Childress/ Childress | VA | Actual | $804,805 | 1 | DISTRICT WIDE STRIPING | 0.0 |
0816-04-096 | Collin/ Dallas | FM 455 | Actual | $2,537,880 | 1 | RESTORE EXISTING PAVEMENT AND ADD SHOULDERS | 0.0 |
0027-01-043 | Colorado/ Yoakum | US 90 | Actual | $6,012 | 10 | EMERGENCY REPAIR-FHWA ER | 0.0 |
0724-01-053 | Coryell/ Waco | FM 116 | Actual | $1,751,017 | 11 | BASE REPAIR, SEAL AND OVERLAY | 0.0 |
0581-01-137 | Dallas/ Dallas | SL 12 | Actual | $5,597,830 | 6 | REPLACE BRIDGE AND APPROACHES | 8.0 |
0009-02-069 | Dallas/ Dallas | SH 78 | Actual | $14,933,128 | 5 | 9 INTERSECTION IMPROVEMENTS | 6.5 |
0009-11-245 | Dallas/ Dallas | IH 30 | Actual | $1,499,792 | 1 | FULL DEPTH CONCRETE REPAIR | 0.0 |
2208-02-022 | Dallas/ Dallas | SS 303 | Actual | $2,647,374 | 1 | FULL DEPTH REPAIR CONCRETE PAVEMENT, OVERLAY AND PAVEMENT | 0.0 |
1310-01-027 | Denton/ Dallas | FM 407 | Actual | $3,863,043 | 6 | REPLACE BRIDGE AND APPROACHES | 5.5 |
0913-00-104 | Dewitt/ Yoakum | VA | Actual | $2,510,125 | 1 | PAVEMENT MARKINGS | 0.0 |
0048-08-051 | Ellis/ Dallas | IH 35E | Actual | $1,538,229 | 1 | FULL DEPTH CONCRETE REPAIR | 0.0 |
0510-04-013 | Fannin/ Paris | FM 898 | Actual | $15,429,879 | 1 | REHABILITATION OF EXISTING ROAD | 6.5 |
0026-03-045 | Fayette/ Yoakum | US 90 | Actual | $254,946 | 8 | INSTALL SAFETY LIGHTING | 0.0 |
0146-06-030 | Foard/ Childress | US 70 | Actual | $4,143,103 | 1 | REHABILITATION OF EXISTING ROADWAY | 0.0 |
0057-03-042 | Freestone/ Bryan | US 84 | Actual | $12,175,857 | 1 | ASPHALT RUBBER SEAL | 0.0 |
0301-03-026 | Frio/ San Antonio | SH 85 | Actual | $1,388,950 | 1 | REHABILITATE EXISTING ROADWAY | 0.0 |
0155-03-042 | Goliad/ Corpus Christi | US 183 | Actual | $9,003 | 10 | EMERGENCY WORK REPAIR FOR SMALL SIGNS AND FLASHING BEACONS | 0.0 |
0155-03-037 | Goliad/ Corpus Christi | US 183 | Actual | $2,984,650 | 6 | BRIDGE REPLACEMENT | 5.0 |
0687-01-013 | Gonzales/ Yoakum | FM 77 | Actual | $1,619,053 | 6 | BRIDGE REPLACEMENT | 5.0 |
0045-03-050 | Grayson/ Paris | SH 56 | Actual | $30,015 | 3 | SH 56 AND RUSK STREET PEDESTRIAN CURB RAMP IMPROVEMENT | 0.0 |
0901-19-192 | Grayson/ Paris | VA | Actual | $1,567,271 | 1 | FY 2019 CONCRETE PAVEMENT PROJECTS ON US 75 | 0.0 |
0495-07-076 | Gregg/ Tyler | IH 20 | Actual | $1,801,088 | 1 | PLANE AND RESURFACE ROADWAY-WBL | 0.0 |
0200-10-067 | Hardin/ Beaumont | US 69 | Actual | $2,191,839 | 2U | WIDEN EXISTING HIGHWAY TO 4 LANES WITH A CONTINUOUS LEFT | 3.0 |
0271-07-322 | Harris/ Houston | IH 10 | Actual | $682,889 | 1 | INSTALL STRIPING | 0.0 |
0177-07-114 | Harris/ Houston | IH 69 | Actual | $1,106,323 | 1 | BRIDGE DECK REPLACEMENT | 0.0 |
1685-05-121 | Harris/ Houston | SH 6 | Actual | $22,463 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
1685-05-110 | Harris/ Houston | SH 6 | Actual | $3,002,721 | 10 | CONSTRUCT SIDEWALKS | 7.0 |
0912-72-500 | Harris/ Houston | CS | Actual | $21,036 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
3256-01-113 | Harris/ Houston | SL 8 | Actual | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-499 | Harris/ Houston | CS | Actual | $22,463 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-00-596 | Harris/ Houston | VA | Actual | $2,082,499 | 3 | CONDUCT 9 LIVABLE CENTER STUDIES (NON-LETTING) | 0.0 |
0912-00-530 | Harris/ Houston | VA | Actual | $3,000,000 | 1 | ITS SUPPORT | 0.0 |
0500-03-594 | Harris/ Houston | IH 45 | Actual | $1,772,367 | 1 | MILLING, 2 ACP OVERLAY, PAVEMENT MARKINGS AND GUARDFENCE | 0.0 |
0912-72-498 | Harris/ Houston | CS | Actual | $22,463 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS, AND | 0.0 |
0912-72-497 | Harris/ Houston | CS | Actual | $18,536 | 10 | REMOVED DAMAGED CABINET, INSTALLED NEW CABINET | 0.0 |
0912-70-145 | Harris/ Houston | CS | Actual | $18,536 | 10 | REPLACED TRAFFIC SIGNAL CABINET, ELECTRICAL COMPONENTS AND | 0.0 |
1575-04-017 | Harrison/ Atlanta | SL 390 | Actual | $310,849 | 8 | INSTALL TRAF SIG, INST ADV WARNING SIG (INTERSECTION | 0.0 |
0238-02-038 | Hartley/ Amarillo | US 54 | Actual | $37,050,701 | 1 | HIGHWAY IMPROVEMENT | 1.5 |
0113-07-066 | Hays/ Austin | US 290 | Actual | $518,639 | 8 | PROFILE EDGELINE & CENTERLINE MARKINGS | 0.0 |
0113-07-069 | Hays/ Austin | US 290 | Actual | $493,763 | 8 | INTERCONNECT SIGNALS & INSTALL FLASHING YELLOW ARROW | 0.0 |
0108-03-042 | Henderson/ Tyler | SH 19 | Actual | $661,919 | 8 | INSTALL PROFILE EDGELINE & CENTERLINE MARKINGS | 0.0 |
0179-09-035 | Jackson/ Yoakum | SH 35 | Actual | $28,920 | 10 | EMERGENCY REPAIR-FHWA ER | 0.0 |
1090-01-025 | Jackson/ Yoakum | FM 530 | Actual | $21,332 | 10 | EMERGENCY REPAIR SHOULDER AND ROADWAY-HARVEY FLOODING | 0.0 |
0296-05-034 | Jones/ Abilene | US 180 | Actual | $8,315,917 | 1 | BASE REPAIR LEVEL UP AND OVERLAY | 4.0 |
0100-05-185 | Karnes/ Corpus Christi | US 181 | Actual | $754,374 | 1 | SAFETY LIGHTING | 0.0 |
0691-01-042 | Karnes/ Corpus Christi | FM 81 | Actual | $9,475,075 | 1 | REHAB AND WIDEN ROADWAY | 5.0 |
0918-11-089 | Kaufman/ Dallas | CR | Actual | $792,336 | 6 | REPLACE BRIDGE AND APPROACHES | 6.0 |
0918-11-090 | Kaufman/ Dallas | CR | Actual | $1,638,715 | 6 | REPLACE BRIDGE AND APPROACHES | 5.0 |
0136-07-050 | Lamar/ Paris | BU 271B | Actual | $1,791,506 | 1 | MILL AND OVERLAY | 0.0 |
0901-00-055 | Lamar/ Paris | VA | Actual | $2,460,232 | 1 | REPLACE CHEVRONS AND CURVE SIGNS | 0.0 |
0346-06-053 | Lavaca/ Yoakum | SH 111 | Actual | $21,343 | 10 | EMERGENCY REPAIR-FHWA ER | 0.0 |
0473-02-038 | Lee/ Austin | SH 21 | Actual | $2,284,546 | 1 | LEVEL-UP, REPAIR, STRUCT OVERLAY TY-D & TOM OVERLAY | 0.0 |
0241-02-054 | Matagorda/ Yoakum | SH 60 | Actual | $413,729 | 10 | CONSTRUCT SIDEWALKS, CURBS, DRIVEWAYS AND ACCESSIBILITY RAMP | 0.0 |
1192-01-024 | Mclennan/ Waco | FM 939 | Actual | $6,879,586 | 1 | WIDEN PAVEMENT TO ADD SHOULDERS, PROVIDE SAFETY UPGRADES AND | 6.5 |
0915-45-053 | Medina/ San Antonio | CR | Actual | $455,744 | 6 | REPLACE BRIDGE & APPROACHES | 0.0 |
1188-02-087 | Midland/ Odessa | SL 250 | Actual | $22,542,710 | 2U | CONSTRUCT NEW INTERCHANGE | 7.0 |
0006-01-100 | Mitchell/ Abilene | IH 20 | Actual | $300,128 | 1 | REMOVE EXISTING RAMP | 0.0 |
0138-06-044 | Nacogdoches/ Lufkin | US 259 | Actual | $3,723,258 | 1 | PLANE, OCST AND PERMEABLE FRICTION COURSE | 0.0 |
0092-06-104 | Navarro/ Dallas | IH 45 | Actual | $1,664,855 | 1 | FULL DEPTH CONCRETE PAVEMENT REPAIR | 0.0 |
0617-01-201 | Nueces/ Corpus Christi | SH 358 | Actual | $35,576 | 10 | EMERGENCY WORK REPAIR FOR TRAFFIC SIGNALS AND ILLUNINATION | 0.0 |
0499-03-064 | Orange/ Beaumont | SH 12 | Actual | $19,275 | 10 | TS HARVEY EMERGENCY REPAIR DONE WITH 47Y00279 | 0.0 |
0920-30-078 | Orange/ Beaumont | CS | Actual | $4,428,083 | 6 | REPLACE BRIDGE AND APPROACHES | 3.0 |
0007-10-066 | Palo Pinto/ Ft Worth | US 180 | Actual | $579,280 | 11 | CLEAN DITCH AND LINE WITH ROCK GABION MATTRESS | 0.0 |
0176-05-183 | Polk/ Lufkin | US 59 | Actual | $9,142 | 10 | REPLACE ERODED EMBANKMENT AND REPLACE THE DAMAGED CONCRETE | 0.0 |
0176-05-181 | Polk/ Lufkin | US 59 | Actual | $3,685,521 | 1 | PLANE, HMA & PERMEABLE FRICTION COURSE | 0.0 |
0090-05-098 | Potter/ Amarillo | IH 40 | Actual | $7,931,584 | 1 | OVERLAY | 0.0 |
2635-05-001 | Randall/ Amarillo | SL 335 | Actual | $47,143,849 | 1 | B-2 PHASE I: CONSTRUCT FRT RDS FOR FUTURE FREEWAY | 11.0 |
0139-05-043 | Reeves/ Odessa | US 285 | Actual | $23,870,072 | 11 | ROADWAY REHABILITATION | 2.0 |
2363-01-007 | Rockwall/ Dallas | FM 2453 | Actual | $2,937,209 | 1 | RECONSTRUCT EXISTING PAVEMENT AND ADD SHOULDERS | 0.0 |
0246-01-034 | Rusk/ Tyler | US 79 | Actual | $5,691,717 | 1 | REPAIR & RESURFACE ROADWAY | 0.0 |
0118-12-019 | San Augustine/ Lufkin | FM 353 | Actual | $212,884 | 10 | EMERGENCY REPAIR ON CULVERT | 0.0 |
0916-28-066 | San Patricio/ Corpus Christi | CS | Actual | $430,500 | 3 | CONSTRUCT HIKE AND BIKE TRAIL | 0.0 |
0125-04-033 | Shackelford/ Abilene | US 283 | Actual | $11,343,194 | 11 | REHABILITATE AND WIDEN ROADWAY | 6.0 |
0910-00-107 | Smith/ Tyler | VA | Actual | $1,954,371 | 11 | FY 2019 DISTRICT-WIDE THERMO PROGRAM | 0.0 |
0259-03-057 | Somervell/ Ft Worth | US 67 | Actual | $2,052,657 | 1 | REPAIR BASE FAILURES, MILL, TOM OVERLAY, PAVEMENT MARKINGS | 2.0 |
0008-07-035 | Tarrant/ Ft Worth | SH 180 | Actual | $5,919,084 | 1 | REPAIR BASE FAILURES, MILL, HMAC OVERLAY, PAVEMENT MARKINGS | 0.0 |
0902-00-186 | Tarrant/ Ft Worth | VA | Actual | $650,000 | 7 | MAINTENANCE & OPERATIONS PROJECT | 0.0 |
0902-90-114 | Tarrant/ Ft Worth | VA | Actual | $2,530,383 | 3 | MOBILITY ASST PATROL THAT PROVIDES ASST TO STRANDED MOTORIST | 0.0 |
0907-00-173 | Tom Green/ San Angelo | VA | Actual | $1,355,953 | 1 | PAVEMENT MARKINGS | 0.0 |
0016-01-125 | Travis/ Austin | SL 275 | Actual | $1,111,037 | 1 | TOM OVERLAY WITH EDGE MILLING | 0.0 |
1186-01-097 | Travis/ Austin | FM 969 | Actual | $368,628 | 1 | IMPROVE TRAFFIC SIGNAL, INSTALL FLASHING YELLOW ARROW | 0.0 |
0914-00-411 | Travis/ Austin | VA | Actual | $2,470,562 | 1 | INSTALL OR REBUILD TRAFFIC SIGNALS | 0.0 |
0152-01-083 | Travis/ Austin | US 183 | Actual | $2,839,896 | 1 | TOM OVERLAY | 0.0 |
0392-02-096 | Upshur/ Atlanta | US 259 | Actual | $10,828,867 | 1 | REHABILITATION OF EXISTING 4-LANE ROADWAY | 0.0 |
0245-04-022 | Van Zandt/ Tyler | FM 279 | Actual | $630,279 | 8 | INSTALL FLASHING CHEVRONS ON CURVE | 0.0 |
0371-01-091 | Victoria/ Yoakum | US 77 | Actual | $15,690 | 10 | EMERGENCY REPAIR-FHWA ER | 0.0 |
0088-05-101 | Victoria/ Yoakum | US 59 | Actual | $6,609 | 10 | EMERGENCY REPAIR-FHWA ER | 0.0 |
0144-01-071 | Victoria/ Yoakum | US 87 | Actual | $18,561 | 10 | EMERGENCY REPAIR-FHWA ER | 0.0 |
0432-02-094 | Victoria/ Yoakum | SH 185 | Actual | $19,263 | 10 | EMERGENCY REPAIR-FHWA ER | 0.0 |
1418-01-012 | Waller/ Houston | FM 1489 | Actual | $1,444,822 | 1 | 1.5 IN ACP OVERLAY | 0.0 |
0457-03-028 | Washington/ Bryan | FM 50 | Actual | $7,109,457 | 1 | REHABILITATE EXISTING ROAD CONSISTING OF GRADING, STRUCTURES | 5.5 |
0018-05-095 | Webb/ Laredo | IH 35 | Actual | $12,545,295 | 1 | RESURFACE OF EXISTING HIGHWAY | 5.0 |
0709-02-056 | Wharton/ Yoakum | FM 102 | Actual | $102,140 | 10 | EMERGENCY RELIEF | 0.0 |
0240-02-033 | Wharton/ Yoakum | SH 60 | Actual | $5,818 | 10 | EMERGENCY REPAIR-FHWA ER | 0.0 |
0838-01-032 | Wharton/ Yoakum | FM 442 | Actual | $28,414 | 10 | EMERGENCY REPAIR-FHWA ER | 0.0 |
0089-07-157 | Wharton/ Yoakum | US 59 | Actual | $8,806 | 10 | EMERGENCY REPAIR-FHWA ER | 0.0 |
0089-10-025 | Wharton/ Yoakum | SH 60 | Actual | $7,873 | 10 | EMERGENCY REPAIR-FHWA ER | 0.0 |
1260-03-015 | Wharton/ Yoakum | FM 640 | Actual | $14,571 | 10 | EMERGENCY REPAIR-FHWA ER | 0.0 |
0089-07-146 | Wharton/ Yoakum | US 59 | Actual | $32,542,217 | 11 | CONSTRUCT FRONTAGE ROADS & OVERPASS | 7.0 |
0089-07-156 | Wharton/ Yoakum | US 59 | Actual | $296,965 | 1 | SLOPE REPAIR | 0.0 |
0043-08-078 | Wichita/ Wichita Falls | US 287 | Actual | $490,147 | 8 | INSTALL ADVANCE WARNING SIGNS (CURVE), HIGH FRICTION SURFACE | 0.0 |
0043-08-076 | Wichita/ Wichita Falls | US 287 | Actual | $978,809 | 8 | SAFETY LIGHTING | 0.0 |
0043-09-137 | Wichita/ Wichita Falls | US 287 | Actual | $6,568,972 | 1 | MILL AND OVERLAY, SB ONLY | 0.0 |
0273-04-036 | Williamson/ Austin | US 183 | Actual | $4,373,096 | 1 | FULL DEPTH REPAIR & OVERLAY | 0.0 |
2103-01-035 | Williamson/ Austin | RM 2243 | Actual | $1,414,956 | 1 | DEPTH REPAIR, UNDERSEAL AND THIN OVERLAY | 0.0 |
0015-08-142 | Williamson/ Austin | IH 35 | Actual | $11,390,404 | 2M | CONVERT EXISTING 2-LANE NB & SB 2-WAY FRONTAGE ROADS TO 2-LN | 9.0 |
0914-05-190 | Williamson/ Austin | VA | Actual | $320,485 | 3 | SHARED USE PATH: ADJACENT TO ROADWAY | 0.0 |
3240-01-019 | Wood/ Tyler | SL 564 | Actual | $5,912,280 | 1 | REPAIR & RESURFACE ROADWAY | 3.0 |
0134-03-032 | Young/ Wichita Falls | US 380 | Actual | $2,718,623 | 1 | PAVEMENT REPAIR AND OVERLAY | 0.0 |
|