Letting Schedule for March, 2017 County (FY 2017)

Last Update: Monday, October 16, 2017
March, 2017 (FY 2017)(see Links)
SEP 2016 | OCT 2016 | NOV 2016 | DEC 2016 | JAN 2017 | FEB 2017 | MAR 2017 | APR 2017 | MAY 2017 | JUN 2017 | JUL 2017 | AUG 2017 |
CCSJCounty/
District
HighwayLet StatusContract
Cost
Fund
Cat
Description
0910-08-067Anderson/
Tyler
CRActual$804,5586REPLACE BRIDGE AND APPROACHES
0176-02-120Angelina/
Lufkin
US 59Actual$3,119,6551RESURFACE EXISTING PAVEMENT
0265-05-079Bastrop/
Austin
SH 71Actual$6,156,1651LEVEL-UP & THIN OVERLAY MIXTURE
2686-01-012Bastrop/
Austin
FM 2571Actual$1,636,9421FULL DEPTH, LEVEL-UP & SEAL COAT
3292-01-014Bell/
Waco
FM 93Actual$89,4031FLASHING BEACONS AND SAFETY LIGHTING
0231-16-032Bell/
Waco
FM 436Actual$159,8961CENTERLINE TEXTURING
1477-01-040Bexar/
San Antonio
FM 1516Actual$13,999,1471EXPAND FROM 2 TO 4 LANES WITH CONTINUOUS LT LANE, SDWLKS &
0586-01-065Brazoria/
Houston
SH 332Actual$241,4651REMOVE AND REPLACE DRAINAGE STRUCTURE
0923-06-075Brown/
Brownwood
CSActual$469,5533CONSTRUCT ALTERNATE TRANSPORTATION ROUTE CONSISTING OF SIDEW
0273-02-026Burnet/
Austin
US 183Actual$2,566,2281LEVEL-UP & FULL DEPTH REPAIR
0273-02-024Burnet/
Austin
US 183Actual$1,435,1358CONVERT 4-LANE UNDIVIDED TO SUPER 2 WITH SHOULDERS AND
1378-04-050Burnet/
Austin
RM 1431Actual$851,5908CONVERT 4-LANE UNDIVIDED TO SUPER 2 WITH SHOULDERS
0535-03-023Caldwell/
Austin
IH 10Actual$1,514,3861ACP OVERLAY
0437-02-016Callahan/
Abilene
US 283Actual$2,834,1001CEMENT TREAT BASE, 1-COURSE SURFACE TREATMENT & 3 SP D
0091-03-025Collin/
Dallas
SH 289Actual$1,793,15310LANDSCAPE TREATMENT OF MEDIANS
0047-06-159Collin/
Dallas
US 75Actual$775,8771FULL DEPTH CONCRETE REPAIR
0047-06-160Collin/
Dallas
US 75Actual$730,2961CLEAN AND PAINT CONCRETE BARRIER AND WALLS
0016-05-115Comal/
San Antonio
IH 35Actual$7,811,8031REPLACE EXISTING BRIDGE, CONSTRUCT NEW TURNARAOUNDS AND
3192-02-009Cooke/
Wichita Falls
FM 1199Actual$917,9361FULL DEPTH REPAIR AND OVERLAY
0724-01-050Coryell/
Waco
FM 116Actual$4,426,6571ADD LEFT TURN LANE
0918-45-714Dallas/
Dallas
VAActual$2,072,3393CONSTRUCT NEW 12' WIDE HIKE/BIKE AND PEDESTRIAN TRAIL IN THE
0918-47-143Dallas/
Dallas
CSActual$2,437,9393MILITARY PARKWAY TRAIL - SHARED-USE PATH ALONG MILITARY PKWY
0918-47-141Dallas/
Dallas
VAActual$575,7733SAFE ROUTES TO SCHOOL - SIDEWALK IMPROVEMENTS AT VARIOUS
0143-09-069Dewitt/
Yoakum
US 87Actual$2,022,1761ACP OVERLAY
0007-06-084Eastland/
Brownwood
IH 20Actual$80,051,1624REALIGN EXISTING ROADWAY INCLUDING GRADING, PAVEMENT
0906-00-156Ector/
Odessa
VAActual$1,159,0631PAVEMENT MARKINGS
0906-00-173Ector/
Odessa
VAActual$660,4491PAVEMENT MARKINGS
0924-06-506El Paso/
El Paso
VAActual$1,100,0005PURCHASE OF 2 BUSES
0079-05-054Erath/
Ft Worth
US 67Actual$4,915,3841WEDGE MILL, SEAL COAT, & HMAC OVERLAY MAIN LANES & SHOULDERS
1482-02-019Fannin/
Paris
FM 1550Actual$3,485,0681REHABILITATION OF EXISTING ROAD
0543-03-072Fort Bend/
Houston
FM 762Actual$2,513,3131BASE REPAIR AND 1.5" ACP OVERLAY
0389-06-105Galveston/
Houston
SH 146Actual$344,0511CONSTRUCT 1.5" ACP RAMP
0072-01-054Gillespie/
Austin
US 87Actual$390,6311CONVERT 4-LANE UNDIVIDED TO SUPER 2 WITH SHOULDER
0535-04-030Gonzales/
Yoakum
IH 10Actual$16,121,9831ACP OVERLAY
0200-12-015Hardin/
Beaumont
FM 418Actual$270,2668MILLED CENTERLINE RUMBLE STRIPS
0912-72-364Harris/
Houston
CSActual$576,0003CONSTRUCT 10 FOOT WIDE HIKE AND BIKE TRAIL
0138-13-018Harrison/
Atlanta
FM 2208Actual$46,56710PAVEMENT/CULVERT REPAIR
0632-03-046Harrison/
Atlanta
FM 134Actual$31,66610PAVEMENT/CULVERT REPAIR
0096-09-076Harrison/
Atlanta
US 80Actual$1,656,1531RESURFACE EXISTING 4-LANE HIGHWAY
1921-02-014Harrison/
Atlanta
FM 1999Actual$9,87310PAVEMENT/CULVERT REPAIR
0030-06-059Hemphill/
Amarillo
US 83Actual$434,6848INSTALL FLASHING BEACON, INSTALL ADV WARN SIGNALS AND SIGNS
0921-02-318Hidalgo/
Pharr
VAActual$1,321,97310CONSTRUCT CURB RAMPS AT VARIOUS LOCATION ALONG US 281
0005-05-110Howard/
Abilene
IH 20Actual$6,407,0111SPOT BASE REPAIR, 1-COURSE SURFACE TREATMENT, 2 SMA-D
0254-07-009Jim Wells/
Corpus Christi
US 281Actual$7,243,8591SPOT BASE REPAIR AND OVERLAY
0916-29-006Live Oak/
Corpus Christi
CRActual$768,1176REPLACE BRIDGE AND APPROACHES
0299-04-068Maverick/
Laredo
US 277Actual$7,945,7991RESURFACE OF EXISTING HIGHWAY
0071-02-032Mcculloch/
Brownwood
US 87Actual$453,8668PROFILE EDGELINE AND CENTERLINE MARKINGS
0909-22-173Mclennan/
Waco
CSActual$382,4913INCREASE SUPERELEVATION
0049-01-092Mclennan/
Waco
SH 6Actual$5,458,3971MILL AND PFC OVERLAY
1810-01-032Nacogdoches/
Lufkin
FM 1878Actual$2,046,1996REPLACE BRIDGE AND APPROACHES
0006-03-132Nolan/
Abilene
IH 20Actual$16,843,8081ROADWAY REHABILITATION / ARMORINGA
0006-14-004Nolan/
Abilene
BI 20-LActual$1,789,4238HIGH FRICTION SURFACE TREATMENT OF CURVE AND INSTALL
1052-01-076Nueces/
Corpus Christi
FM 666Actual$9,334,9171WIDEN AND SEAL ROADWAY
0916-00-084Nueces/
Corpus Christi
VAActual$1,800,1751DISTRICT WIDE SMALL SIGN REPLACEMENT
0246-02-049Panola/
Atlanta
BU 79-GActual$951,2271RESURFACE EXISTING 2-LANE HIGHWAY
0139-08-037Pecos/
Odessa
US 285Actual$1,168,40011ROADWAY WIDENING
2451-03-015Reeves/
Odessa
RM 652Actual$5,198,4836BRIDGE REPLACEMENT
0207-01-021Rusk/
Tyler
SH 43Actual$5,717,2981REPAIR AND RESURFACE ROADWAY
0118-10-060San Augustine/
Lufkin
SH 21Actual$2,703,2866REPLACE BRIDGE AND APPROACHES
0180-09-018San Patricio/
Corpus Christi
SL 90Actual$168,26410LANDSCAPE WORK
0372-01-098San Patricio/
Corpus Christi
US 77Actual$3,254,9081BASE REPAIR, MILL, SEAL AND OVERLAY (NB & SB LANES) ON US 77
0910-16-121Smith/
Tyler
PWActual$1,451,29810OVERLAY PARK ROADS, PARKING LOTS & CAMPSITE PULLOUTS
0910-16-130Smith/
Tyler
VAActual$2,192,8591CONSTRUCT RIGHT TURN LANES AT VARIOUS INTERSECTIONS
0245-05-047Smith/
Tyler
SH 64Actual$1,972,2041PLANE & RESURFACE ROADWAY
0718-02-068Tarrant/
Ft Worth
FM 156Actual$184,0851INSTALL TRAFFIC SIGNAL AND ADD LEFT TURN LANE
0094-02-123Tarrant/
Ft Worth
SH 10Actual$4,159,7631MILL, BASE REPAIR, HMAC OVERLAY
1330-01-062Tarrant/
Ft Worth
FM 1187Actual$6,421,8911MILL, HMAC OVERLAY & PAVEMENT MARKINGS
0914-00-395Travis/
Austin
VAActual$1,721,3051FY 17 NON-SITE SPECIFIC SIGNALS
3417-01-024Travis/
Austin
FM 734Actual$1,509,1041PAVEMENT REPAIR,UNDERSEAL & OVERLAY
0015-11-063Travis/
Austin
SL 275Actual$172,4026UPGRADE BRIDGE AND APPROACH RAILING
0319-01-064Trinity/
Lufkin
US 287Actual$2,234,8771RECONSTRUCT EXISTING PAVEMENT
1237-01-032Tyler/
Beaumont
FM 1013Actual$512,0068INCREASE SUPERELEVATION
0275-12-072Wheeler/
Childress
IH 40Actual$4,739,5496BRIDGE REPLACEMENT
0043-14-024Wichita/
Wichita Falls
SL 11Actual$320,6126UPGRADE BRIDGE AND APPROACH RAILING
1076-02-040Young/
Wichita Falls
FM 209Actual$2,500,3591EXTEND CULVERTS


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract