Letting Schedule for June, 2017 County (FY 2017)
June, 2017 (FY 2017) | (see Links) |
SEP 2016 | OCT 2016 | NOV 2016 | DEC 2016 | JAN 2017 | FEB 2017 | MAR 2017 | APR 2017 | MAY 2017 | JUN 2017 | JUL 2017 | AUG 2017 | | ||||||
CCSJ | County/ District | Highway | Let Status | Contract Cost | Fund Cat | Description |
---|---|---|---|---|---|---|
0200-02-031 | Angelina/ Lufkin | US 69 | Actual | $10,575,167 | 1 | WIDEN FROM 2 LANES TO 4 LANE DIVIDED RURAL |
1835-02-054 | Bell/ Waco | FM 1741 | Actual | $1,054,695 | 1 | MILL AND INLAY |
2452-01-064 | Bexar/ San Antonio | SL 1604 | Actual | $7,934,767 | 1 | INTERSECTION OPERATIONAL IMPROVEMENTS |
0010-11-069 | Bowie/ Atlanta | US 67 | Actual | $1,620,126 | 6 | BRIDGE PREVENTATIVE MAINTENANCE |
0610-06-080 | Bowie/ Atlanta | IH 30 | Actual | $681,304 | 8 | INSTALL SAFETY LIGHTING |
0046-06-079 | Bowie/ Atlanta | US 82 | Actual | $1,862,877 | 1 | RESURFACE EXISTING 4-LANE ROADWAY |
0598-02-092 | Brazoria/ Houston | SH 288 | Actual | $167,882,847 | 3 | CONSTRUCT 4 TOLL LANES |
0598-02-047 | Brazoria/ Houston | SH 288 | Actual | $2,124,872 | 11 | CONSTRUCT NB EXIT AND ENTRANCE RAMPS AND TIE-IN ROAD AT |
0282-01-016 | Clay/ Wichita Falls | SH 79 | Actual | $6,090,000 | 6 | REPLACE BRIDGE |
0816-05-019 | Collin/ Dallas | FM 2862 | Actual | $1,614,825 | 6 | REPLACE BRIDGE AND APPROACHES |
1973-01-014 | Collin/ Dallas | FM 1461 | Actual | $2,718,046 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
0918-24-215 | Collin/ Dallas | CS | Actual | $550,000 | 3 | PRINCETON SAFE ROUTES TO SCHOOL - CONSTRUCT SIDEWALKS |
0027-03-071 | Colorado/ Yoakum | US 90A | Actual | $4,348,748 | 11 | CONSTRUCT SUPER 2 LANES |
0196-07-031 | Dallas/ Dallas | SS 366 | Actual | $713,064 | 1 | CONCRETE FULL DEPTH REPAIR AND PAVEMENT MARKINGS ON |
0353-06-057 | Dallas/ Dallas | SH 114 | Actual | $44,768,156 | 1 | CONSTRUCT 0 TO 4 LANE SIGNATURE BRIDGE AND RAMP |
0095-13-037 | Dallas/ Dallas | IH 20 | Actual | $4,734,207 | 5 | INSTALLATION OF WIRELESS ITS |
0196-03-268 | Dallas/ Dallas | IH 35E | Actual | $80,160,549 | 1 | CONSTRUCT 0 TO 3/4 COLLECTOR DISTRIBUTOR, RCNST 1/3 LN SB FR |
2374-04-049 | Dallas/ Dallas | IH 20 | Actual | $56,411,983 | 3 | CONSTRUCT 0 TO 6 LANE FRONTAGE ROADS, RAMP MODIFICATIONS AND |
0009-03-045 | Dallas/ Dallas | SH 66 | Actual | $1,772,191 | 10 | LANDSCAPE TREATMENT OF RIGHT OF WAY MEDIANS |
0136-04-035 | Delta/ Paris | SH 19 | Actual | $2,195,062 | 6 | REPLACE BRIDGE AND APPROACHES |
0081-13-057 | Denton/ Dallas | IH 35W | Actual | $18,895,356 | 1 | CONSTRUCT 2 LANE NORTHBOUND FRONTAGE ROADS WITH RAMP |
0918-46-274 | Denton/ Dallas | CS | Actual | $1,741,225 | 6 | REPLACE BRIDGE AND APPROACHES |
0918-46-280 | Denton/ Dallas | CS | Actual | $1,243,696 | 3 | IMPROVE TRAFFIC SIGNALS |
0037-05-051 | Dimmit/ Laredo | US 83 | Actual | $428,885 | 8 | INSTALL INTERSECTION FLASHING BEACON |
0027-06-046 | Fort Bend/ Houston | US 90A | Actual | $24,637,330 | 2M | REPLACE RAILROAD UNDERPASS |
0010-04-021 | Franklin/ Paris | US 67 | Actual | $711,506 | 1 | PROFILE EDGELINE AND CENTERLINE MARKINGS |
1414-01-019 | Galveston/ Houston | FM 528 | Actual | $240,719 | 8 | IMPROVE TRAFFIC SIGNALS |
0392-03-047 | Gregg/ Tyler | US 259 | Actual | $459,892 | 1 | CONSTRUCT RIGHT TURN LANE ON NBL |
0910-07-069 | Gregg/ Tyler | VA | Actual | $1,413,190 | 1 | INSTALL FLASHING YELLOW LEFT TURN ARROWS ON TRAFFIC SIGNALS |
0917-17-065 | Grimes/ Bryan | CR | Actual | $903,926 | 6 | REPLACEMENT OF AN EXISTING BRIDGE FACILITY CONSISTING OF |
0339-04-035 | Hardin/ Beaumont | SH 105 | Actual | $2,943,647 | 11 | MILL AND OVERLAY EXISTING ROADWAY |
0065-06-063 | Hardin/ Beaumont | US 69 | Actual | $9,395,320 | 1 | CONSTRUCT FRONTAGE ROADS OVER PINE ISLAND BAYOU |
0508-01-346 | Harris/ Houston | IH 10 | Actual | $17,536,553 | 1 | SPALL REPAIR, FULL DEPTH REPAIR, AR, 1" CAM, PFC ACP |
0912-72-409 | Harris/ Houston | CS | Actual | $245,791 | 8 | FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 288 014F) |
0912-72-412 | Harris/ Houston | CS | Actual | $79,507 | 8 | FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 755 618Y) |
0912-72-410 | Harris/ Houston | CS | Actual | $402,798 | 8 | FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 758 512N) |
0912-72-336 | Harris/ Houston | CR | Actual | $12,106,015 | 7 | CONSTRUCT RAILROAD GRADE SEPARATION WITH MEDIAN & SIDEWALKS |
0912-72-411 | Harris/ Houston | CS | Actual | $434,975 | 8 | FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 758 513V) |
0912-71-896 | Harris/ Houston | CS | Actual | $7,052,614 | 3 | CONSTRUCT 4 LANE DIVIDED SECTION |
0912-72-313 | Harris/ Houston | CS | Actual | $5,846,697 | 3 | RECONSTRUCT ROADWAY WITH ANGLED PARKING AND PEDESTRIAN IMPRO |
1919-02-037 | Harrison/ Atlanta | FM 1997 | Actual | $864,970 | 1 | UPGRADE SIDEWALKS AND RETAINING WALLS AT ETBU |
0157-04-051 | Haskell/ Abilene | US 277 | Actual | $725,959 | 1 | UPGRADE SAFETY LIGHTING |
7107-08-004 | Irion/ San Angelo | RL SO | Actual | $9,517,331 | RL | INFRASTRUCTURE REHAB TO REPLACE RAIL, REPLACE TIES, BALLAST, |
0916-37-030 | Jim Wells/ Corpus Christi | CR | Actual | $299,563 | 6 | REPLACE BRIDGE AND APPROACHES |
0918-11-085 | Kaufman/ Dallas | CS | Actual | $400,000 | 3 | PEDESTRIAN FACILITIES AND AMENITIES; CONSTRUCT SIDEWALK |
0751-03-038 | Kaufman/ Dallas | FM 148 | Actual | $4,345,802 | 1 | RECONSTRUCT EXISTING PAVEMENT AND ADD SHOULDERS |
0095-14-028 | Kaufman/ Dallas | IH 20 | Actual | $1,304,145 | 1 | CONCRETE PAVEMENT REPAIR AND SLOT STITCHING |
1042-01-032 | Kendall/ San Antonio | RM 474 | Actual | $5,512,148 | 1 | WIDEN EXISTING ROADWAY TO ADD SHOULDERS |
0913-29-031 | Lavaca/ Yoakum | CR | Actual | $616,181 | 6 | REPLACE BRIDGE AND APPROACHES |
0593-01-114 | Liberty/ Beaumont | SH 321 | Actual | $1,094,888 | 1 | OVERLAY EXISTING ROADWAY |
0348-11-015 | Live Oak/ Corpus Christi | FM 99 | Actual | $2,760,300 | 1 | REHAB AND WIDEN |
0150-02-038 | Llano/ Austin | SH 29 | Actual | $574,282 | 8 | INSTALL ADVANCE CURVE WARNING SIGNALS AND SIGNS, INSTALL LED |
0905-00-080 | Lubbock/ Lubbock | VA | Actual | $2,533,759 | 10 | CONSTRUCT CURB RAMPS AT VARIOUS LOCATION IN |
0328-07-014 | Mcmullen/ San Antonio | SH 97 | Actual | $4,364,281 | 1 | REHAB AND WIDEN ROADWAY TO PROVIDE PASSING LANES AND |
0848-01-041 | Medina/ San Antonio | FM 462 | Actual | $3,788,273 | 1 | REHABILITATE & WIDEN NARROW ROADWAY TO ADD SHOULDERS |
0463-03-049 | Midland/ Odessa | SH 158 | Actual | $4,979,653 | 1 | PAVEMENT OVERLAY |
0917-12-080 | Milam/ Bryan | CR | Actual | $554,707 | 6 | REPLACEMENT OF AN EXISTING BRIDGE FACILITY CONSISTING OF |
0720-02-091 | Montgomery/ Houston | FM 149 | Actual | $413,027 | 8 | INSTALL LED FLASHING CHEVRONS ON CURVE |
0920-06-033 | Newton/ Beaumont | CR | Actual | $579,522 | 6 | REPLACE BRIDGE AND APPROACHES |
0908-20-025 | Nolan/ Abilene | CR | Actual | $368,648 | 8 | SIGNALS,LIGHTS,GATES |
0916-35-164 | Nueces/ Corpus Christi | PW | Actual | $1,528,912 | 10 | RESURFACING OF ROADWAYS,PARKING LOT,AND LEVEE ROADS |
0074-06-228 | Nueces/ Corpus Christi | IH 37 | Actual | $748,896 | 1 | IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS (FRTG LANES) |
0007-08-028 | Palo Pinto/ Ft Worth | SH 16 | Actual | $302,145 | 8 | MILLED EDGELINE & CENTERLINE RUMBLE STRIPS |
0314-07-052 | Parker/ Ft Worth | IH 20 | Actual | $32,478,439 | 1 | RECONSTRUCT 2 LN BRIDGE TO 1 LN U-TURN BRIDGE, CONST 0 TO 4 |
0302-01-020 | Parmer/ Lubbock | SH 86 | Actual | $920,762 | 6 | BRIDGE MAINTENANCE |
0090-05-099 | Potter/ Amarillo | IH 40 | Actual | $1,888,909 | 6 | REPLACE WEST BOUND BRIDGE |
0493-01-013 | Reeves/ Odessa | RM 652 | Actual | $7,108,009 | 1 | ROADWAY RESTORATION |
0059-04-046 | Shelby/ Lufkin | SH 7 | Actual | $2,253,039 | 8 | TEXTURIZE SHOULDERS (PROFILE EDGELINE MARKINGS; PROFILE |
0034-01-129 | Taylor/ Abilene | US 83 | Actual | $2,046,615 | 1 | REMOVE THE EXISTING PAVEMENT AND REPLACE WITH CONCERETE TO |
0006-06-103 | Taylor/ Abilene | IH 20 | Actual | $2,636,356 | 6 | REHAB EXISTING BRIDGE |
0033-06-107 | Taylor/ Abilene | US 83 | Actual | $8,908,639 | 1 | PLANING, UNDERSEAL, SMA SURFACES TREATMENT, BRIDGE RAIL |
0221-05-064 | Titus/ Atlanta | US 271 | Actual | $10,866,737 | 6 | REPLACE BRIDGES AND APPROACHES |
0248-01-072 | Titus/ Atlanta | SH 49 | Actual | $413,107 | 8 | IMPROVE TRAFFIC SIGNAL, INSTALL ADVANCE WARNING SIGNS, |
0683-02-068 | Travis/ Austin | RM 620 | Actual | $177,395 | 3 | INSTALL TRAFFIC SIGNAL |
0113-13-165 | Travis/ Austin | SH 71 | Actual | $820,942 | 10 | LANDSCAPING AND IRRIGATION |
0015-13-401 | Travis/ Austin | IH 35 | Actual | $149,004 | 8 | IMPROVE TRAFFIC SIGNAL |
0015-13-377 | Travis/ Austin | IH 35 | Actual | $6,968,552 | 2M | RESURFACE ROADWAY |
0248-04-068 | Upshur/ Atlanta | US 271 | Actual | $374,114 | 8 | INSTALL PAVEMENT MARKINGS & INSTALL PEDESTRIAN CROSSWALK |
0022-10-064 | Val Verde/ Laredo | US 90 | Actual | $530,001 | 1 | IMPROVE TRAFFIC SIGNALS |
0495-02-063 | Van Zandt/ Tyler | IH 20 | Actual | $2,092,608 | 8 | IMPROVE GUARDRAIL TO DESIGN STANDARDS |
0910-12-066 | Van Zandt/ Tyler | CR | Actual | $1,522,412 | 6 | REPLACE RAILROAD OVERPASS & APPROACHES |
0522-02-037 | Van Zandt/ Tyler | SH 243 | Actual | $6,560,717 | 1 | WIDEN FROM 2 LNS TO 4 LNS W/FLUSH MEDIAN |
0917-27-044 | Walker/ Bryan | CR | Actual | $517,235 | 6 | REPLACE EXISTING BRIDGE FACILITY CONSISTING OF GRADING, |
0271-04-071 | Waller/ Houston | IH 10 | Actual | $143,849,747 | 1 | CONSTRUCT 1 ADDITIONAL MAIN LANE IN EACH DIRECTION |
0156-07-109 | Wichita/ Wichita Falls | IH 44 | Actual | $1,062,496 | 8 | INTALL MEDIAN BARRIER |
0903-03-083 | Wichita/ Wichita Falls | CS | Actual | $1,085,464 | 6 | REPLACE BRIDGE AND APPROACHES |
0903-03-111 | Wichita/ Wichita Falls | VA | Actual | $559,992 | 3 | CONSTRUCT SIDEWALKS |
1202-01-018 | Williamson/ Austin | FM 972 | Actual | $3,582,125 | 1 | REHABILITATE PAVEMENT, ADD SHOULDERS & SAFETY TREAT |
|