Letting Schedule for August, 2017 County (FY 2017)
August, 2017 (FY 2017) | (see Links) |
SEP 2016 | OCT 2016 | NOV 2016 | DEC 2016 | JAN 2017 | FEB 2017 | MAR 2017 | APR 2017 | MAY 2017 | JUN 2017 | JUL 2017 | AUG 2017 | | ||||||
CCSJ | County/ District | Highway | Let Status | Contract Cost | Fund Cat | Description |
---|---|---|---|---|---|---|
0206-01-049 | Anderson/ Tyler | US 79 | Actual | $1,382,585 | 6 | CLEAN/PAINT STEEL GIRDERS,REPL BR RAIL,CONCRETE DECK OVERLAY |
0328-06-030 | Atascosa/ San Antonio | SH 97 | Actual | $2,903,319 | 1 | WIDEN RDWY TO PROVIDE PASSING LANES |
0328-03-035 | Atascosa/ San Antonio | SH 97 | Actual | $10,141,518 | 1 | RESTORE EXISTING ROADWAY |
0915-00-203 | Bexar/ San Antonio | VA | Actual | $2,000,000 | 1 | DISTRICTWIDE ITS OPERATION AND MAINTENANCE FY 2017 |
0915-12-592 | Bexar/ San Antonio | VA | Actual | $652,384 | 10 | LANDSCAPE DEVELOPMENT AT VARIOUS LOCATIONS IN BEXAR COUNTY |
0915-12-591 | Bexar/ San Antonio | VA | Actual | $528,886 | 10 | LANDSCAPE DEVELOPMENT AT VARIOUS LOCATIONS IN BEXAR COUNTY |
0954-02-020 | Blanco/ Austin | RM 165 | Actual | $407,380 | 10 | DEMOLISH OLD STRUCTURE DAMAGE BY FLOODWATER AND FLOODWATER |
0179-01-048 | Brazoria/ Houston | SH 35 | Actual | $2,665,454 | 1 | BRIDGE DECK REPLACEMENT |
0912-31-221 | Brazoria/ Houston | CR | Actual | $571,800 | 6 | REPLACE BRIDGE AND APPROACHES (NBI# 12020AA0848001) |
0917-29-129 | Brazos/ Bryan | VA | Actual | $1,885,784 | 3 | MISCELLANEOUS WORK CONSISTING OF SHARED USE PATH, SIDEWALK, |
0908-34-022 | Callahan/ Abilene | CR | Actual | $1,469,479 | 6 | REPLACE BRIDGE AND APPROACHES |
3187-02-011 | Chambers/ Beaumont | SH 99 | Actual | $579,757,592 | 3 | CONSTRUCT 4-LANE TOLLWAY & INTERCHANGES |
0130-02-023 | Cochran/ Lubbock | SH 114 | Actual | $1,575,526 | 8 | RUMBLE STRIPS (MILLED-IN) |
0091-04-062 | Collin/ Dallas | SH 289 | Actual | $2,257,149 | 8 | IMPROVE TRAFFIC SIGNALS |
0387-01-014 | Collin/ Dallas | FM 75 | Actual | $1,369,798 | 1 | RECONSTRUCT EXISTING PAVEMENT |
0918-00-280 | Dallas/ Dallas | VA | Actual | $1,301,562 | 3 | DART VANPOOL PROGRAM |
0918-00-255 | Dallas/ Dallas | VA | Actual | $500,000 | 3 | REGIONAL IMPLEMENTATION OF INNOVATIVE EMISSIONS REDUCTION |
0918-00-274 | Dallas/ Dallas | VA | Actual | $50,000 | 3 | APPLY SUSTAINABILITY BEST PRACTICES TO A FEASIBILITY STUDY |
0918-47-196 | Dallas/ Dallas | CS | Actual | $20,636 | 10 | REPAIR ROADWAY |
0918-47-136 | Dallas/ Dallas | CS | Approved | $3,999,955 | 3 | FM 1382 HIKE AND BIKE TRAIL (PHASE 2) |
0918-47-114 | Dallas/ Dallas | VA | Actual | $2,602,839 | 10 | CONSTRUCT CURB RAMPS IN NORTHEAST DALLAS COUNTY IN CITIES |
0918-47-137 | Dallas/ Dallas | CS | Approved | $5,039,856 | 3 | NORTHAVEN TRAIL (PHASES 2B AND 2C) - |
0918-45-757 | Dallas/ Dallas | CS | Actual | $2,779,162 | 6 | REPLACE BRIDGE AND APPROACHES |
0918-46-301 | Denton/ Dallas | VA | Actual | $895,050 | 3 | VANPOOL SUBSIDY INITIATIVE FOR COMMUTERS TRAVELING LONG DIST |
0167-02-059 | El Paso/ El Paso | SL 478 | Approved | $1,250,000 | 3 | CONSTRUCTION OF PEDESTRIAN ENHANCEMENTS ALONG THE DYER RTS R |
0924-06-535 | El Paso/ El Paso | VA | Actual | $4,340,000 | 7 | HIGHWAY EMERGENCY RESPONSE OPERATIONS (HERO) |
0167-01-095 | El Paso/ El Paso | US 54 | Actual | $36,061,674 | 1 | WIDEN BY ADDING 2 INSIDE LANES, HIGHMAST ILLUMINATION, AND |
0924-06-536 | El Paso/ El Paso | VA | Actual | $2,000,000 | 5 | WEST EL PASO TRAFFIC MITIGATION CIRCULATOR SERVICE YR2-2017 |
2121-03-154 | El Paso/ El Paso | IH 10 | Actual | $14,968,586 | 5 | RAMP IMPROVEMENTS |
0752-04-024 | Falls/ Waco | FM 935 | Actual | $4,006,979 | 1 | WIDEN PAVEMENT TO ADD SHOULDERS, PROVIDE SAFETY UPGRADES |
0279-02-045 | Fannin/ Paris | SH 78 | Actual | $90,000 | 6 | EMERGENCY BRIDGE BENT REPAIR WORK |
0265-07-049 | Fayette/ Yoakum | SH 71 | Actual | $2,627,050 | 1 | ACP OVERLAY |
0573-04-015 | Gonzales/ Yoakum | FM 1116 | Actual | $4,971,747 | 8 | SAFETY TREAT FIXED OBJECTS |
0047-18-075 | Grayson/ Paris | US 75 | Actual | $3,513,164 | 1 | CONSTRUCT RAMP REVERSAL |
0047-02-134 | Grayson/ Paris | US 75 | Actual | $864,702 | 8 | SAFETY TREAT FIXED OBJECTS |
0045-03-043 | Grayson/ Paris | SH 56 | Actual | $2,501,149 | 1 | OVERLAY |
0315-03-059 | Grimes/ Bryan | SH 90 | Actual | $3,008,656 | 1 | OVERLAY CONSISTING OF PLANING, HMA, PAVEMENT MARKINGS AND |
0915-46-043 | Guadalupe/ San Antonio | VA | Actual | $1,206,888 | 3 | CONSTRUCT SIDEWALKS ALONGSIDE AND WITHIN THE NEW COMMUNITY |
0915-46-042 | Guadalupe/ San Antonio | CS | Actual | $3,439,837 | 3 | WIDEN ROADWAY & ADD CONTINUOUS LEFT TURN LANE, BIKE LANES |
0339-03-037 | Hardin/ Beaumont | SH 105 | Actual | $239,364 | 8 | SAFETY TREAT FIXED OBJECTS, TEXTURIZE SHOULDERS (MILLED IN) |
0271-16-143 | Harris/ Houston | IH 610 | Actual | $620,992 | 8 | FY 2017 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 912 021M & |
0271-06-126 | Harris/ Houston | IH 10 | Actual | $841,860 | 10 | LANDSCAPING ENHANCEMENT |
0912-00-517 | Harris/ Houston | VA | Actual | $400,000 | 1 | FREEWAY FLOW SIGNAL CONTROLLER UPGRADE |
0271-17-161 | Harris/ Houston | IH 610 | Actual | $263,845,369 | 1 | RECONSTRUCTION OF IH 610 MAIN LANE BRIDGE WITHIN THE |
0177-07-112 | Harris/ Houston | IH 69 | Actual | $747,710 | 10 | LANDSCAPING ENHANCEMENT |
0051-02-100 | Harris/ Houston | SH 3 | Actual | $348,053 | 1 | ADD RIGHT TURN LANES |
0912-70-121 | Harris/ Houston | CS | Actual | $427,921 | 8 | FY 2016 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 758 523B) |
0912-72-375 | Harris/ Houston | CS | Actual | $222,784 | 3 | EROSION REPAIR |
0912-70-118 | Harris/ Houston | CS | Actual | $445,038 | 8 | FY 2016 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 758 521M) |
0912-70-119 | Harris/ Houston | CS | Actual | $372,497 | 8 | FY 2016 RR SIGNAL AND WARNING DEVICES (UPRR DOT# 758 525P) |
0912-72-418 | Harris/ Houston | CR | Actual | $16,007 | 10 | EROSION REPAIR |
0912-00-496 | Harris/ Houston | VA | Actual | $1,562,000 | 3 | CLEAN AIR ACTION PROGRAM DEVELOPMENT, IMPLEMENTATION AND |
0912-00-487 | Harris/ Houston | VA | Actual | $6,250,000 | 3 | REGIONAL FREEWAY INCIDENT MANAGEMENT-MOTORIST ASSISTANCE, |
3510-06-014 | Harris/ Houston | SH 99 | Actual | $4,927,914 | 1 | CONSTRUCT SOUNDWALL |
0912-00-507 | Harris/ Houston | VA | Actual | $5,125,000 | 5 | DEVELOPING TRANSIT MARKET FLEET EXPANSION PROGRAM (YEAR 3) |
0495-08-098 | Harrison/ Atlanta | IH 20 | Actual | $713,318 | 8 | INSTALL SAFETY LIGHTING |
0843-07-016 | Harrison/ Atlanta | FM 2625 | Actual | $2,562,226 | 3 | CONSTRUCT OVERPASS OVER LIGNITE MINING HAUL ROAD |
0016-02-148 | Hays/ Austin | IH 35 | Actual | $1,255,279 | 1 | MILL, SEAL & PFC |
0914-33-070 | Hays/ Austin | CR | Actual | $153,305 | 3 | INSTALL WARNING/GUIDE SIGNS, INSTALL DELINEATORS |
0921-02-212 | Hidalgo/ Pharr | CR | Actual | $808,282 | 6 | REPLACE BRIDGE & RECONST APPROACHES |
1586-01-069 | Hidalgo/ Pharr | FM 907 | Actual | $10,851,189 | 1 | WIDEN TO 4 LANE DIVIDED - CURB & GUTTER |
0937-03-016 | Houston/ Lufkin | FM 227 | Actual | $1,792,986 | 8 | SAFETY TREAT FIXED OBJECTS |
0005-06-119 | Howard/ Abilene | IH 20 | Actual | $2,398,600 | 8 | INSTALL MEDIAN BARRIER |
0005-06-117 | Howard/ Abilene | IH 20 | Actual | $1,137,493 | 6 | BRIDGE REHAB |
0420-01-040 | Jackson/ Yoakum | SH 172 | Actual | $875,733 | 8 | SAFETY TREAT FIXED OBJECTS |
0920-38-187 | Jefferson/ Beaumont | CS | Actual | $2,155,787 | 3 | RESURFACE ROADWAY |
0739-02-161 | Jefferson/ Beaumont | IH 10 | Actual | $101,970,748 | 1 | WIDEN FREEWAY FROM 4 TO 6 LANES |
0197-03-073 | Kaufman/ Dallas | US 175 | Actual | $2,881,205 | 1 | FLEXIBLE PAVEMENT REPAIR, LEVEL UP, SEALCOAT AND |
0197-05-054 | Kaufman/ Dallas | US 175 | Actual | $1,253,698 | 1 | FLEXIBLE PAVEMENT REPAIR, LEVEL UP, SEALCOAT AND |
0918-11-086 | Kaufman/ Dallas | CS | Actual | $488,625 | 3 | PEDESTRIAN FACILITY; MULITLEVEL SIDEWALK; ACCESSIBLE CURBS |
0141-20-009 | Kimble/ San Angelo | SL 481 | Actual | $1,149,555 | 6 | REPAIR RETAINING WALL, FOUNDATIONS AND EXPANSION JOINTS |
0045-11-038 | Lamar/ Paris | US 82 | Actual | $2,119,084 | 8 | INSTALL CONTINUOUS TURN LANE |
0913-29-050 | Lavaca/ Yoakum | CR | Actual | $462,864 | 6 | REPLACE BRIDGE AND APPROACHES |
0114-07-082 | Lee/ Austin | US 290 | Actual | $1,529,925 | 8 | INSTALL MEDIAN BARRIER |
0675-03-081 | Leon/ Bryan | IH 45 | Actual | $7,628,931 | 1 | RAMP RELOCATION_CONSISTING OF GRADING, STRUCTURES, FLEXIBLE |
2866-01-009 | Limestone/ Waco | FM 2838 | Actual | $1,756,167 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
1959-01-014 | Live Oak/ Corpus Christi | FM 2049 | Actual | $6,657,915 | 1 | REHAB AND WIDEN |
0905-06-110 | Lubbock/ Lubbock | CS | Actual | $97,364 | 6 | BRIDGE REHABILITATION |
0905-06-102 | Lubbock/ Lubbock | NR | Actual | $265,000 | 3 | BIKE/PEDESTRIAN STUDY |
0905-06-086 | Lubbock/ Lubbock | CS | Actual | $5,042,437 | 3 | WIDEN NON-FREEWAY |
0300-01-080 | Maverick/ Laredo | US 277 | Actual | $21,531,183 | 11 | RECONSTRUCTION OF EXISTING HIGHWAY |
0299-03-050 | Maverick/ Laredo | US 277 | Actual | $25,597,734 | 1 | ADDING PASSING LANES & SURFACING |
0262-07-033 | Milam/ Bryan | FM 485 | Actual | $676,950 | 6 | REPLACE EXISTING BRIDGE CONSISTING OF GRADING, STRUCTURES |
3510-07-003 | Montgomery/ Houston | SH 99 | Actual | $314,944,029 | 3 | CONSTRUCT 4-LANE TOLLWAY WITH INTERCHANGES AND TWO |
0110-04-129 | Montgomery/ Houston | SH 75 | Actual | $1,451,453 | 7 | WIDEN TO 4 LANES |
0912-37-230 | Montgomery/ Houston | VA | Actual | $1,420,000 | 3 | PED INFRASTRUCTURE: CURB & GUTTER, PLANTING STRIP BARRIERS, |
0916-35-200 | Nueces/ Corpus Christi | CS | Approved | $636,000 | 3 | CONSTRUCTION HIKE & BIKE TRAIL |
0916-35-201 | Nueces/ Corpus Christi | CS | Approved | $330,000 | 3 | CONSTRUCT HIKE AND BIKE TRAIL |
0916-35-204 | Nueces/ Corpus Christi | VA | Approved | $3,350,000 | 3 | WIDEN ROADWAY, ADD TURN LANES |
0920-30-079 | Orange/ Beaumont | CS | Actual | $392,269 | 6 | REPLACE BRIDGE AND APPROACHES |
0008-03-089 | Parker/ Ft Worth | IH 20 | Actual | $4,831,194 | 1 | REHABILITATE EXISTING FR RDS; CONVERT TO ONE WAY OPERATION; |
0104-10-006 | Presidio/ El Paso | US 67 | Actual | $6,408,847 | 11 | NEW TWO-LANE TWIN BRIDGE STRUCTURE FOR SOUTHBOUND TRAFFIC |
0108-11-019 | Rains/ Paris | SH 19 | Actual | $7,177,415 | 1 | REHABILITATION OF EXISTING ROAD |
0725-02-019 | Rains/ Paris | FM 275 | Actual | $610,390 | 1 | WIDEN PAVEMENT |
0554-01-034 | Real/ San Angelo | RM 336 | Actual | $1,323,420 | 8 | INSTALL LED FLASHING CHEVRONS ON CURVE |
0139-03-039 | Reeves/ Odessa | US 285 | Actual | $20,665,254 | 1 | ROADWAY WIDENING TO A MODIFIED SUPER 2 |
0916-28-067 | San Patricio/ Corpus Christi | VA | Actual | $681,368 | 3 | CONSTRUCT SHARED USE PATH |
0916-28-068 | San Patricio/ Corpus Christi | CS | Actual | $134,532 | 3 | CONSTRUCT SIDEWALK |
1163-01-022 | Smith/ Tyler | FM 850 | Actual | $1,209,584 | 6 | REPLACE BRIDGE & APPROACHES |
0910-00-108 | Smith/ Tyler | VA | Actual | $277,650 | 10 | LANDSCAPE & PLANT TREES IN STATE ROW, PROVIDE IRRIGATION |
0902-00-185 | Tarrant/ Ft Worth | VA | Actual | $750,000 | 7 | LAND USE/TRANS & BIKE/PED INIT INCL BIKE/PED PLANNING, |
0902-48-576 | Tarrant/ Ft Worth | CS | Actual | $4,223,190 | 3 | INTERSECTION IMPROVEMENTS |
1068-01-216 | Tarrant/ Ft Worth | IH 30 | Actual | $942,715 | 6 | REPLACE BRIDGE DECK AND APPROACH SLABS |
2374-05-081 | Tarrant/ Ft Worth | IH 20 | Actual | $1,037,754 | 6 | REPLACE BRIDGE & APPROACH RAILING OR ADD SAFETY END |
0902-90-059 | Tarrant/ Ft Worth | VA | Actual | $2,014,500 | 7 | VANPOOL PROGRAM FY 17; OPER VANPOOL SUBSIDY INITIATIVE FOR |
0902-90-030 | Tarrant/ Ft Worth | VA | Actual | $489,515 | 3 | SIDEWALK ADDITION, CURB RAMPS |
2266-02-146 | Tarrant/ Ft Worth | SH 360 | Actual | $302,591 | 8 | INSTALL PROTECTION FOR RAILROAD BRIDGE COLUMN, DRAINAGE & |
0902-00-155 | Tarrant/ Ft Worth | VA | Actual | $1,918,608 | 10 | CONSTRUCT CURB RAMPS AT VARIOUS LOCATIONS ALONG BU 67, |
0094-02-121 | Tarrant/ Ft Worth | SH 183 | Actual | $3,359,706 | 3 | CORRIDOR IMPRVMNTS AT 3 LOCATIONS, INCLUDING SIDEWALKS & C |
0172-06-092 | Tarrant/ Ft Worth | US 287 | Approved | $857,747 | 3 | INT IMPROV; UPGRADE TRAFFIC SIGNAL; VEHICLE & PED ILLUM & |
0353-03-099 | Tarrant/ Ft Worth | SH 114 | Approved | $1,819,209 | 3 | LANDSCAPE ENHANCEMENT |
0094-02-132 | Tarrant/ Ft Worth | SH 10 | Actual | $800,000 | 3 | LANDSCAPE ENHANCEMENTS |
0008-15-050 | Tarrant/ Ft Worth | IH 820 | Actual | $547,966 | 7 | REPLACE ELECTRICAL CONDUCTORS AND CONDUIT FOR ROADWAY |
0902-90-071 | Tarrant/ Ft Worth | VA | Actual | $3,202,981 | 1 | ILLUMINATION REFURBISHMENT ON DFW CONNECTOR |
0902-00-183 | Tarrant/ Ft Worth | VA | Actual | $350,000 | 3 | REVENUE & PROJECT TRACKING, SOFTWARE DEVELOPMENT, & FISCAL |
0902-00-158 | Tarrant/ Ft Worth | VA | Actual | $1,530,000 | 7 | AQ PLNG, EVAL & DEV, DATA & FEASIBILITY ANALYSES,POL & BEST |
0902-00-170 | Tarrant/ Ft Worth | VA | Actual | $3,750,000 | 3 | CLEAN TECH REVOLVING LOAN, EST INNOV FIN TO OFFSET COST OF |
0015-13-402 | Travis/ Austin | IH 35 | Actual | $1,035,401 | 8 | INSTALL TRAFFIC SIGNAL |
0914-00-386 | Travis/ Austin | VA | Actual | $3,600,000 | 1 | HERO PROGRAM |
0914-00-408 | Travis/ Austin | VA | Actual | $750,000 | 3 | GENERAL PLANNING CONSULTANT CONTRACT TO PERFORM_CAMPO METRO- |
0015-13-382 | Travis/ Austin | IH 35 | Actual | $173,608,423 | 11 | ADD SHOULDERS, AUXILIARY LANES, RAMP IMPROVEMENTS, DIRECT |
3136-01-015 | Travis/ Austin | SL 1 | Actual | $49,208,622 | 1 | GRADE SEPARATION OF MAIN LANES AT SLAUGHTER AND LACROSSE |
2689-01-026 | Travis/ Austin | FM 2304 | Actual | $398,010 | 8 | CHANNELIZATION (STRIPING) |
0914-00-409 | Travis/ Austin | VA | Actual | $300,000 | 3 | STRATEGIC PLAN AND EVALUATION MODEL FOR THE INCIDENT MGMT |
0914-04-302 | Travis/ Austin | VA | Approved | $2,136,301 | 3 | INSTALL PEDESTRIAN SAFETY DEVICES CITYWIDE |
3621-01-012 | Val Verde/ Laredo | SL 79 | Actual | $5,700,828 | 1 | REHABILITATION OF AN EXISTING HIGHWAY |
2350-01-054 | Victoria/ Yoakum | SL 463 | Actual | $4,584,424 | 11 | CONSTRUCT EAST BOUND FRONTAGE ROAD |
0675-07-101 | Walker/ Bryan | IH 45 | Actual | $112,921,646 | 1 | WIDEN FREEWAY CONSISTING OF GRADING, STRUCTURES, FLEXIBLE |
0913-09-065 | Wharton/ Yoakum | CR | Actual | $317,596 | 6 | REPLACE BRIDGE AND APPROACHES |
0913-09-100 | Wharton/ Yoakum | CR | Actual | $365,028 | 8 | FEDERAL RAILROAD SIGNAL PROGRAM |
0327-10-057 | Willacy/ Pharr | US 77 | Actual | $21,236,609 | 11 | CONSTRUCT MAINLANES & OVERPASS |
|