Letting Schedule for April, 2017 County (FY 2017)

Last Update: Monday, October 16, 2017
April, 2017 (FY 2017)(see Links)
SEP 2016 | OCT 2016 | NOV 2016 | DEC 2016 | JAN 2017 | FEB 2017 | MAR 2017 | APR 2017 | MAY 2017 | JUN 2017 | JUL 2017 | AUG 2017 |
CCSJCounty/
District
HighwayLet StatusContract
Cost
Fund
Cat
Description
0133-07-026Archer/
Wichita Falls
SH 114Actual$488,9778CENTERLINE TEXTURING
0573-01-033Bastrop/
Austin
SH 304Actual$228,94510REMOVE RIPRAP,BACKFILL,EXCAVATION (CHANNEL), EMBANKMENT AND
1308-01-024Bell/
Waco
FM 1123Actual$3,332,8446REPLACE BRIDGE AND APPROACHES
2230-01-018Bexar/
San Antonio
FM 1560Actual$5,014,2881CONSTRUCT 2 LANE ROADWAY ON NEW LOCATION
0915-00-204Bexar/
San Antonio
VAActual$1,465,3101DISTRICTWIDE NON-SITE SPECIFIC TRAFFIC SIGNALS-FY 2017
0909-28-022Bosque/
Waco
CRActual$1,359,2976REPLACE BRIDGE AND APPROACHES
0085-04-035Bowie/
Atlanta
US 259Actual$5,660,7571REHABILITATE AND WIDEN EXISTING 2-LANE HIGHWAY
0178-02-088Brazoria/
Houston
SH 35Actual$235,5251ADD LEFT TURN LANE
0050-01-079Brazos/
Bryan
BS 6-RActual$1,824,0273SAFETY WORK CONSISTING OF IMPROVEMENT OF TRAFFIC SIGNALS
3583-01-006Caldwell/
Austin
SH 130Actual$400,0003DETENTION MITIGATION-CONSTRUCTION
0384-04-030Caldwell/
Austin
FM 1854Actual$1,069,3598SAFETY TREAT FIXED OBJECTS
0287-01-016Caldwell/
Austin
SH 80Actual$42,00010FLOWABLE BACKFILL
0007-01-054Callahan/
Abilene
IH 20Actual$10,417,1951SPOT BASE REPAIR, 1-COURSE SURFACE TREATMENT, 2 SMA-D
0342-04-032Cameron/
Pharr
SH 107Actual$4,573,15711WIDEN TO 4 LANE UNDIVIDED CURB & GUTTER
0913-26-058Colorado/
Yoakum
CRActual$233,2976REPLACE BRIDGE AND APPROACHES
0312-01-078Cooke/
Wichita Falls
FM 51Actual$793,9891ADD SHOULDERS
0233-01-044Culberson/
El Paso
US 62Actual$4,151,4608MODERNIZE BRIDGE RAIL AND APPROACH GUARDRAIL, SAFETY TREAT F
0918-45-820Dallas/
Dallas
VAActual$513,8003ASSESSMENT AND IMPLEMENTATION OF DALLAS SAFETY PROGRAM
0581-02-145Dallas/
Dallas
SL 12Actual$1,550,2091MILL, FULL DEPTH REPAIR & OVERLAY ON FRONTAGE ROADS
2638-01-022Eastland/
Brownwood
SH 206Actual$391,3638PROFILE CENTER AND EDGELINE MARKINGS
2638-01-023Eastland/
Brownwood
SH 206Actual$912,5491RECONSTRUCT ROADWAY
0002-12-023El Paso/
El Paso
US 62Actual$3,564,5708IMPROVE TRAFFIC SIGNAL
0027-12-153Fort Bend/
Houston
IH 69Actual$1,562,56810CONSTRUCTION OF MISCELLANEOUS WORK CONSISTING OF EMBANKMENT
0027-08-179Fort Bend/
Houston
US 90AActual$12,30610REPLACEMENT OF TRAFFIC SIGNAL CABINET
2940-02-010Fort Bend/
Houston
FM 2919Actual$5,68910REMOVAL AND DISPOSAL OF ALL DAMAGED ASPHALT AND DEBRIS.
3422-01-011Fort Bend/
Houston
PR 72Actual$583,592101.5 INCH PLANING, 1.5 INCH ACP OVERLAY AND PAVEMENT MARKINGS
3595-01-017Galveston/
Houston
SH 275Actual$839,15211 MILLING, FULL DEPTH REPAIR, 316 SEAL COAT, 1.75 TOM
0053-04-042Garza/
Lubbock
US 84Actual$3,036,2994RESTORATION OF ROADWAY
0072-01-052Gillespie/
Austin
US 87Actual$1,156,9201INSTALL CONTINUOUS TURN LANE
0096-04-066Gregg/
Tyler
US 80Actual$3,129,4571RECONSTRUCT RDWY W/CENTER 2-WAY LEFT TURN LN & CURB & GUTTER
0393-01-097Gregg/
Tyler
SH 149Actual$2,454,5886REPLACE BRIDGE RAIL
0912-72-408Harris/
Houston
CRActual$78,86810REPAIR WASHOUT AT BRIDGE
0912-72-407Harris/
Houston
CRActual$55,24310REPAIR WASHOUT AT BRIDGE
0028-01-101Harris/
Houston
BU 90-UActual$663,5881INSTALL MBGF/SGTS
0500-03-107Harris/
Houston
IH 45Actual$95,599,2104WIDEN TO 10 MAIN LANES, TWO 3-LANE FRONTAGE ROADS AND ACCESS
0912-71-003Harris/
Houston
CSActual$10,971,7573ROADWAY RECONSTRUCTION
0912-00-495Harris/
Houston
VAActual$1,560,0003URBAN CORE FREIGHT/RELIEF ROUTE STUDY
0471-02-073Hays/
Austin
SH 21Actual$1,252,95410RIPRAP, BOX CULVERT,WINGWALLS, BACKFILL,TRAFFIC CONTROL,ROCK
0914-33-032Hays/
Austin
CSActual$2,155,5673INTERSECTION, SIGNAL, & BICYCLE PEDESTRIAN IMPROVEMENTS
3123-01-014Hood/
Ft Worth
FM 4Actual$3,904,8211WIDEN PAVEMENT AND ADD SHOULDERS
0911-28-033Houston/
Lufkin
CRActual$754,0296REPLACE BRIDGE AND APPROACHES
0173-07-055Hunt/
Paris
SH 34Actual$1,884,7511MILL AND INLAY
0913-18-029Jackson/
Yoakum
CRActual$548,5676REPLACE BRIDGE AND APPROACHES
0710-01-049Jasper/
Beaumont
FM 105Actual$1,162,3911OVERLAY EXISTING ROADWAY
0902-50-113Johnson/
Ft Worth
VAActual$1,208,3673CONSTRUCT BICYCLE/PEDESTRIAN PATH
0918-11-091Kaufman/
Dallas
CRActual$793,7286REPLACE BRIDGE AND APPROACHES
1016-06-011Kaufman/
Dallas
FM 1392Actual$5,983,1641RECONSTRUCT EXISTING PAVEMENT AND ADD SHOULDERS
0197-03-075Kaufman/
Dallas
US 175Actual$5,866,0731MILL, OVERLAY, BRIDGE JOINT REPAIR AND PAVEMENT MARKINGS
0907-20-006Kimble/
San Angelo
VAActual$2,954,1581REPLACE AND REFURBISH LARGE SIGNS
0023-04-065Kinney/
Laredo
US 90Actual$12,718,5791RESURFACE OF EXISTING HIGHWAY
0018-01-076La Salle/
Laredo
IH 35Actual$1,601,3551REHABILITAITON OF EXISTING HIGHWAY
0334-05-033Lee/
Austin
FM 141Actual$27,87110REMOVE STR,RIPRAP,CUT & RESTORE PAVEMENT,FLOWABLE BACKFILL
3114-01-014Lee/
Austin
FM 180Actual$83,95810RIPRAP,REMOVE STR,CUT & RESTORE PAVEMENT,FLOWABLE BACKFILL,
1564-02-010Lee/
Austin
FM 1697Actual$412,4428SAFETY TREAT FIXED OBJECTS
0150-02-035Llano/
Austin
SH 29Actual$375,3978TEXTURIZE SHOULDER- PROFILE PAVEMENT MARKERS
0052-07-070Lubbock/
Lubbock
US 84Actual$7,009,7614RESTORATION
0068-13-003Lynn/
Lubbock
SL 472Actual$1,018,3651OVERLAY
2697-01-034Matagorda/
Yoakum
FM 2668Actual$3,778,7298SAFETY TREAT FIXED OBJECTS
0035-05-057Menard/
San Angelo
US 83Actual$2,119,8371ACP OVERLAY
0044-04-059Montague/
Wichita Falls
US 82Actual$6,503,6721FULL DEPTH REPAIR AND OVERLAY
0121-05-050Navarro/
Dallas
SH 22Actual$2,496,4031FULL DEPTH CONCRETE REPAIR AND OVERLAY
0305-04-037Newton/
Beaumont
SH 87Actual$2,498,2271OVERLAY EXISTING ROADWAY
0916-35-205Nueces/
Corpus Christi
VAActual$460,0003STRATEGIC INTEGRATION (TRAVEL DEMAND MODEL) FEASIBILITY STUD
0916-35-209Nueces/
Corpus Christi
CSActual$295,5008RAILROAD SIGNAL INSTALLATION (2017 PROGRAM PROJECT)
1069-01-037Nueces/
Corpus Christi
SH 357Actual$6,687,4021NOVACHIP ROADWAY
0306-02-069Orange/
Beaumont
SH 73Actual$4,797,8331OVERLAY EXISTING ROADWAY
0882-01-013Orange/
Beaumont
FM 2177Actual$362,8658PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0250-02-050Palo Pinto/
Ft Worth
US 281Actual$4,782,9916CLEAN AND PAINT STEEL TRUSS
0080-06-030Parker/
Ft Worth
US 377Actual$8,650,7921MILL, BASE REPAIR, OVERLAY
0275-01-187Potter/
Amarillo
IH 40Actual$5,461,0766REPLACE BRIDGES WITH 1 BRIDGE
0139-05-044Reeves/
Odessa
US 285Actual$961,3186REPAIR BEAMS AND REPLACE BENT CAPS_(NBI 06-195-0-0003-07-177
0916-28-066San Patricio/
Corpus Christi
CSActual$430,5003CONSTRUCT HIKE AND BIKE TRAIL
0180-10-077San Patricio/
Corpus Christi
SH 361Actual$3,831,3391OVERLAY BOTH DIRECTIONS
0911-39-048Shelby/
Lufkin
CRActual$483,1006REPLACE BRIDGE AND APPROACHES
0910-16-138Smith/
Tyler
VAActual$143,4971CONSTRUCT SIDEWALKS AND CURB RAMPS 2015 GOVERNORS COMMUNITY
0910-16-134Smith/
Tyler
VAActual$500,00012PURCHASE 7.25 MILE ABANDONED UNION PACIFIC RAILROAD CORRIDOR
0257-01-041Stephens/
Brownwood
US 183Actual$4,044,2391REHABILITATE EXISTING ROADWAY
0902-48-873Tarrant/
Ft Worth
VAActual$4,011,7551DFW CONNECTOR COMPREHENSIVE MAINTENANCE AGREEMENT FY17
1068-02-142Tarrant/
Ft Worth
IH 30Actual$6,916,8881MILL, BASE REPAIR, SMA OVERLAY AND PAVEMENT MARKINGS
0006-04-079Taylor/
Abilene
IH 20Actual$1,839,1171INSTALLATION OF PAVEMENT MARKINGS AND RAISED REFLECTIVE
0114-02-103Travis/
Austin
US 290Actual$3,265,2971OVERLAY
0151-09-145Travis/
Austin
US 183Actual$2,788,7281REPAIR, MILL, SEAL & OVERLAY NB & SB FRONTAGE ROADS
0914-04-299Travis/
Austin
VAActual$1,000,0003INSTALL 18 BICYCLE SHARE STATIONS
1385-01-036Upshur/
Atlanta
SH 300Actual$3,114,0001RESURFACE EXISTING 4-LANE HIGHWAY
1673-02-017Van Zandt/
Tyler
FM 1861Actual$2,579,4671REPAIR, REPAVE AND WIDEN TO 24'
0114-11-078Waller/
Houston
US 290Actual$9,861102 BUCKET TRUCKS REMOVAL AND PROPER DISPOSAL OF DAMAGED
0913-09-059Wharton/
Yoakum
CRActual$776,8716REPLACE BRIDGE AND APPROACHES
0266-06-047Wharton/
Yoakum
SH 71Actual$1,687,2291PAVEMENT REPAIR AND SURFACING
1200-01-023Williamson/
Austin
FM 1660Actual$4,896,8901REHAB RDWY
0902-20-114Wise/
Ft Worth
VAActual$212,5003CONSTRUCT SIDEWALK


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract