Detail Letting Schedule for Wood County (FY 2015)

Last Update: Tuesday, September 29, 2015
Wood County (FY 2015)

CCSJ: 0083-06-038

District: Tyler Let Date: NOV 2014
Highway: SH 11 Let Status: Actual
Project ID: STP 2015(312) CSJ: 0083-06-038
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: .2 MI N OF FM 852 IN WINNSBORO, E Fund Cat: 1
Limits To: 0.6 MI E OF FM 1647 (CAMP C/L) Estimate: $324,672
Length: 9.0 Miles Actual: $716,125
 
District: Tyler Let Date: NOV 2014
Highway: US 80 Let Status: Actual
Project ID: STP 2015(312) CSJ: 0095-06-067
Description: SEAL COAT & PAVEMENT MARKINGS EBL & WBL Handling
Code:
 
Limits From: .4 MI E OF SH64(BGN DEP MED,WLS PT) Fund Cat: 1
Limits To: 4 MI W OF FM1504(END DEP MED,EDGWD) Estimate: $365,638
Length: 4.8 Miles Actual: $330,146
 
District: Tyler Let Date: NOV 2014
Highway: SH 19 Let Status: Actual
Project ID: STP 2015(312) CSJ: 0108-03-038
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: VAN ZANDT C/L, S Fund Cat: 1
Limits To: 0.2 MI S OF FM 2709 Estimate: $128,518
Length: 3.7 Miles Actual: $114,999
 
District: Tyler Let Date: NOV 2014
Highway: SH 19 Let Status: Actual
Project ID: STP 2015(326) CSJ: 0108-13-007
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: US 79 IN PALESTINE, S Fund Cat: 1
Limits To: US 84 Estimate: $67,986
Length: 0.7 Miles Actual: $61,516
 
District: Tyler Let Date: NOV 2014
Highway: US 84 Let Status: Actual
Project ID: NH 2015(311) CSJ: 0109-01-061
Description: SEAL COAT & PAVEMENT MARKINGS EBL & WBL Handling
Code:
 
Limits From: US 287 (OAK ST) IN P'STINE, E & S Fund Cat: 1
Limits To: 0.2 MI N OF US 287 (REAGAN ST) Estimate: $87,978
Length: 1.0 Miles Actual: $79,972
 
District: Tyler Let Date: NOV 2014
Highway: US 259 Let Status: Actual
Project ID: NH 2015(311) CSJ: 0138-05-055
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: US 84 IN MT ENTERPRISE, S Fund Cat: 1
Limits To: NACOGDOCHES C/L Estimate: $382,731
Length: 5.0 Miles Actual: $350,184
 
District: Tyler Let Date: NOV 2014
Highway: US 175 Let Status: Actual
Project ID: NH 2015(311) CSJ: 0198-02-034
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: FM 315 IN POYNER, SE Fund Cat: 1
Limits To: ANDERSON C/L Estimate: $62,466
Length: 1.8 Miles Actual: $55,985
 
District: Tyler Let Date: NOV 2014
Highway: US 175 Let Status: Actual
Project ID: NH 2015(311) CSJ: 0198-03-033
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: HENDERSON C/L, SE Fund Cat: 1
Limits To: CHEROKEE C/L Estimate: $318,899
Length: 8.2 Miles Actual: $303,402
 
District: Tyler Let Date: NOV 2014
Highway: US 175 Let Status: Actual
Project ID: NH 2015(311) CSJ: 0198-04-039
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: ANDERSON C/L, SE Fund Cat: 1
Limits To: FM 347 IN JACKSONVILLE Estimate: $417,645
Length: 10.6 Miles Actual: $384,500
 
District: Tyler Let Date: NOV 2014
Highway: US 69 Let Status: Actual
Project ID: STP 2015(312) CSJ: 0203-05-038
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: 0.35 MI N OF SH 182 (RAINS C/L), S Fund Cat: 1
Limits To: 1.65 MI S OF FM 779 NEAR GOLDEN Estimate: $476,780
Length: 8.9 Miles Actual: $428,789
 
District: Tyler Let Date: NOV 2014
Highway: US 79 Let Status: Actual
Project ID: NH 2015(311) CSJ: 0205-07-074
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: 0.1 MI S OF LP 256(4TH ST)P'STINE,W Fund Cat: 1
Limits To: 1.7 MI S OF SL 256 (TILE FAC RD) Estimate: $118,066
Length: 1.6 Miles Actual: $106,146
 
District: Tyler Let Date: NOV 2014
Highway: SL 127 Let Status: Actual
Project ID: STP 2015(326) CSJ: 0205-13-004
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: US 84 IN PALESTINE, NW Fund Cat: 1
Limits To: SL 256 Estimate: $49,916
Length: 1.6 Miles Actual: $46,012
 
District: Tyler Let Date: NOV 2014
Highway: US 84 Let Status: Actual
Project ID: STP 2015(326) CSJ: 0205-14-007
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: US 79, NW Fund Cat: 1
Limits To: US 287 IN PALESTINE Estimate: $49,201
Length: 0.9 Miles Actual: $45,351
 
District: Tyler Let Date: NOV 2014
Highway: SH 43 Let Status: Actual
Project ID: STP 2015(115)HESG CSJ: 0207-01-019
Description: INSTALL MILLED CENTERLINE RUMBLE STRIPS Handling
Code:
 
Limits From: FM 1716/FM 1251, SW Fund Cat: 8
Limits To: N OF US 259 IN HENDERSON Estimate: $19,553
Length: 3.6 Miles Actual: $17,073
 
District: Tyler Let Date: NOV 2014
Highway: SH 43 Let Status: Actual
Project ID: STP 2015(312) CSJ: 0207-01-020
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: FM 1716/FM 1251, SW Fund Cat: 1
Limits To: US 259 AT TRAFFIC STAR IN HENDERSON Estimate: $180,988
Length: 3.9 Miles Actual: $122,274
 
District: Tyler Let Date: NOV 2014
Highway: SH 43 Let Status: Actual
Project ID: STP 2015(125)HESG CSJ: 0207-02-025
Description: INSTALL MILLED CENTERLINE RUMBLE STRIPS Handling
Code:
 
Limits From: 2.2 MI S OF FM 2658 (BEG C-S), SW Fund Cat: 8
Limits To: FM 1716/FM 1251 Estimate: $38,394
Length: 8.0 Miles Actual: $33,359
 
District: Tyler Let Date: NOV 2014
Highway: SH 43 Let Status: Actual
Project ID: STP 2015(312) CSJ: 0207-02-026
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: 4 MI S OF FM 2658 (CR2136), SW Fund Cat: 1
Limits To: FM 1716/FM 1251 Estimate: $271,483
Length: 6.1 Miles Actual: $258,361
 
District: Tyler Let Date: NOV 2014
Highway: SH 43 Let Status: Actual
Project ID: STP 2015(135)HESG CSJ: 0207-03-025
Description: INSTALL MILLED CENTERLINE RUMBLE STRIPS Handling
Code:
 
Limits From: N OF FM 3231 IN TATUM, SW Fund Cat: 8
Limits To: 2.2 MI S OF FM 2658 (END C-S) Estimate: $33,852
Length: 6.4 Miles Actual: $29,271
 
District: Tyler Let Date: NOV 2014
Highway: US 259 Let Status: Actual
Project ID: STP 2015(326) CSJ: 0392-03-045
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: UPSHUR C/L, S Fund Cat: 1
Limits To: FM 1844, N OF LONGVIEW Estimate: $478,321
Length: 5.4 Miles Actual: $439,854
 
District: Tyler Let Date: NOV 2014
Highway: SH 155 Let Status: Actual
Project ID: STP 2015(326) CSJ: 0520-08-065
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: 1 MI N OF FM 315, S Fund Cat: 1
Limits To: US 79 IN PALESTINE Estimate: $146,232
Length: 1.7 Miles Actual: $132,972
 
District: Tyler Let Date: NOV 2014
Highway: SL 256 Let Status: Actual
Project ID: STP 2015(312) CSJ: 0520-09-042
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: 0.2 MI N OF US 79, SE Fund Cat: 1
Limits To: 0.3 MI S OF US 84 IN PALESTINE Estimate: $177,010
Length: 2.1 Miles Actual: $160,068
 
District: Tyler Let Date: NOV 2014
Highway: SH 243 Let Status: Actual
Project ID: STP 2015(312) CSJ: 0522-02-035
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: KAUFMAN C/L, E Fund Cat: 1
Limits To: E OF SH 198 IN CANTON Estimate: $462,406
Length: 12.4 Miles Actual: $393,666
 
District: Tyler Let Date: NOV 2014
Highway: SH 243 Let Status: Actual
Project ID: STP 2015(313)HESG CSJ: 0522-02-036
Description: INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS Handling
Code:
 
Limits From: KAUFMAN C/L, E Fund Cat: 8
Limits To: W OF SH 64 IN CANTON Estimate: $92,288
Length: 13.7 Miles Actual: $55,305
 
District: Tyler Let Date: NOV 2014
Highway: FM 16 Let Status: Actual
Project ID: STP 2015(312) CSJ: 0522-03-024
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: SH 64, E Fund Cat: 1
Limits To: IH 20 Estimate: $205,467
Length: 6.0 Miles Actual: $170,550
 
District: Tyler Let Date: NOV 2014
Highway: FM 16 Let Status: Actual
Project ID: STP 2015(330)HESG CSJ: 0522-03-025
Description: INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS Handling
Code:
 
Limits From: SH 64, E Fund Cat: 8
Limits To: W OF SH 110 IN VAN Estimate: $76,780
Length: 9.8 Miles Actual: $44,580
 
District: Tyler Let Date: NOV 2014
Highway: FM 839 Let Status: Actual
Project ID: STP 2015(312) CSJ: 0545-05-016
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: US 79, S Fund Cat: 1
Limits To: FM 1798 Estimate: $221,447
Length: 7.3 Miles Actual: $201,652
 
District: Tyler Let Date: NOV 2014
Highway: SH 274 Let Status: Actual
Project ID: STP 2015(312) CSJ: 0561-02-036
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: KAUFMAN C/L, S Fund Cat: 1
Limits To: 0.75 MI S OF FM 3225 IN TOOL Estimate: $267,344
Length: 8.0 Miles Actual: $240,813
 
District: Tyler Let Date: NOV 2014
Highway: FM 13 Let Status: Actual
Project ID: STP 2015(312) CSJ: 0591-01-007
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: SH 135 IN TROUP, S Fund Cat: 1
Limits To: CHEROKEE C/L Estimate: $43,150
Length: 1.1 Miles Actual: $39,948
 
District: Tyler Let Date: NOV 2014
Highway: FM 13 Let Status: Actual
Project ID: STP 2015(312) CSJ: 0591-02-019
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: CHEROKEE C/L, NE Fund Cat: 1
Limits To: SH 42 Estimate: $105,857
Length: 3.1 Miles Actual: $95,646
 
District: Tyler Let Date: NOV 2014
Highway: FM 13 Let Status: Actual
Project ID: STP 2015(312) CSJ: 0591-03-009
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: SMITH C/L, SE & E Fund Cat: 1
Limits To: CHEROKEE C/L Estimate: $263,932
Length: 7.7 Miles Actual: $237,509
 
District: Tyler Let Date: NOV 2014
Highway: FM 47 Let Status: Actual
Project ID: STP 2015(312) CSJ: 0646-02-026
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: IH 20, S Fund Cat: 1
Limits To: SH 243 Estimate: $191,829
Length: 5.4 Miles Actual: $162,884
 
District: Tyler Let Date: NOV 2014
Highway: FM 47 Let Status: Actual
Project ID: STP 2015(329)HESG CSJ: 0646-02-027
Description: INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS Handling
Code:
 
Limits From: US 80 IN WILLS POINT, S Fund Cat: 8
Limits To: N OF SH 243 Estimate: $128,457
Length: 11.3 Miles Actual: $74,848
 
District: Tyler Let Date: NOV 2014
Highway: FM 316 Let Status: Actual
Project ID: STP 2015(312) CSJ: 0646-04-009
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: SH 198 AT PHALBA, S Fund Cat: 1
Limits To: FM 1861 AT HENDERSON C/L (SECTIONS) Estimate: $95,000
Length: 2.6 Miles Actual: $85,411
 
District: Tyler Let Date: NOV 2014
Highway: SH 198 Let Status: Actual
Project ID: STP 2015(312) CSJ: 0646-05-035
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: 1.8 MI S OF FM316(PAYNE SPRG LIM),S Fund Cat: 1
Limits To: SH 31 IN MALAKOFF Estimate: $274,144
Length: 7.1 Miles Actual: $245,336
 
District: Tyler Let Date: NOV 2014
Highway: FM 757 Let Status: Actual
Project ID: STP 2015(312) CSJ: 0679-01-011
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: 2.2 MI S OF IH 20(END NEW PRJCT), S Fund Cat: 1
Limits To: SH 31 Estimate: $97,089
Length: 2.8 Miles Actual: $87,492
 
District: Tyler Let Date: NOV 2014
Highway: FM 607 Let Status: Actual
Project ID: STP 2015(312) CSJ: 0745-03-019
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: FM 317 AT LEAGUEVILLE, S Fund Cat: 1
Limits To: SL 60 AT LA RUE Estimate: $263,107
Length: 8.6 Miles Actual: $217,387
 
District: Tyler Let Date: NOV 2014
Highway: FM 607 Let Status: Actual
Project ID: STP 2015(331)HESG CSJ: 0745-03-021
Description: INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS Handling
Code:
 
Limits From: FM 317, S Fund Cat: 8
Limits To: SL 60 IN LARUE Estimate: $71,959
Length: 8.9 Miles Actual: $42,180
 
District: Tyler Let Date: NOV 2014
Highway: FM 1805 Let Status: Actual
Project ID: STP 2015(312) CSJ: 0745-04-009
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: VAN ZANDT C/L, NE 1.8 MI Fund Cat: 1
Limits To: FM 1253 Estimate: $52,782
Length: 1.8 Miles Actual: $44,426
 
District: Tyler Let Date: NOV 2014
Highway: FM 1805 Let Status: Actual
Project ID: STP 2015(327)HESG CSJ: 0745-04-010
Description: INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS Handling
Code:
 
Limits From: VAN ZANDT C/L Fund Cat: 8
Limits To: SW OF FM 1253 Estimate: $16,157
Length: 1.8 Miles Actual: $9,305
 
District: Tyler Let Date: NOV 2014
Highway: FM 1805 Let Status: Actual
Project ID: STP 2015(312) CSJ: 0745-05-010
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: SH 110, NE Fund Cat: 1
Limits To: 1.8 MI W OF FM 1253 (SMITH C/L) Estimate: $95,776
Length: 3.3 Miles Actual: $78,491
 
District: Tyler Let Date: NOV 2014
Highway: FM 1805 Let Status: Actual
Project ID: STP 2015(328)HESG CSJ: 0745-05-011
Description: INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS Handling
Code:
 
Limits From: SH 110, N OF VAN, NE Fund Cat: 8
Limits To: SMITH C/L Estimate: $31,788
Length: 3.4 Miles Actual: $18,013
 
District: Tyler Let Date: NOV 2014
Highway: FM 756 Let Status: Actual
Project ID: STP 2015(098)HESG CSJ: 0889-05-007
Description: INSTALL PROFILE MARKING CENTERLINE RUMBLE STRIPS Handling
Code:
 
Limits From: FM 346, S Fund Cat: 8
Limits To: N OF FM 344 AT WALNUT GROVE Estimate: $29,952
Length: 3.2 Miles Actual: $17,004
 
District: Tyler Let Date: NOV 2014
Highway: FM 756 Let Status: Actual
Project ID: STP 2015(326) CSJ: 0889-05-008
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: FM 346, S Fund Cat: 1
Limits To: FM 344 Estimate: $102,553
Length: 3.2 Miles Actual: $83,456
 
District: Tyler Let Date: NOV 2014
Highway: SL 7 Let Status: Actual
Project ID: STP 2015(312) CSJ: 1099-05-034
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: SH 19(S) IN ATHENS, W Fund Cat: 1
Limits To: E END OF US 59 O/P Estimate: $133,995
Length: 1.7 Miles Actual: $121,504
 
District: Tyler Let Date: NOV 2014
Highway: SH 19 Let Status: Actual
Project ID: STP 2015(326) CSJ: 1099-05-035
Description: SEAL COAT & PAVEMENT MARKINGS ON LP 7 Handling
Code:
 
Limits From: US 175(S), SW Fund Cat: 1
Limits To: SH 19(S) IN ATHENS Estimate: $185,288
Length: 2.4 Miles Actual: $167,603
 
District: Tyler Let Date: NOV 2014
Highway: US 175 Let Status: Actual
Project ID: STP 2015(326) CSJ: 1099-05-036
Description: SEAL COAT & PAVEMENT MARKINGS ON LP 7 Handling
Code:
 
Limits From: 0.4 MI W OF FM1616(END R/R O/P),E&S Fund Cat: 1
Limits To: US 175(S) IN ATHENS Estimate: $429,776
Length: 4.0 Miles Actual: $388,378
 
District: Tyler Let Date: NOV 2014
Highway: FM 779 Let Status: Actual
Project ID: STP 2015(312) CSJ: 1111-01-012
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: US 69, E Fund Cat: 1
Limits To: SH 37 Estimate: $171,044
Length: 5.9 Miles Actual: $156,115
 
District: Tyler Let Date: NOV 2014
Highway: FM 1798 Let Status: Actual
Project ID: STP 2015(312) CSJ: 1669-03-007
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: FM 225, E Fund Cat: 1
Limits To: US 259 Estimate: $200,858
Length: 6.9 Miles Actual: $182,758
 
District: Tyler Let Date: NOV 2014
Highway: FM 1798 Let Status: Actual
Project ID: STP 2015(312) CSJ: 1670-01-011
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: US 79, S Fund Cat: 1
Limits To: FM 839 Estimate: $117,742
Length: 3.9 Miles Actual: $107,727
 
District: Tyler Let Date: NOV 2014
Highway: RM 2329 Let Status: Actual
Project ID: STP 2015(312) CSJ: 2196-01-013
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: FM 316, S & E Fund Cat: 1
Limits To: US 175 AT PICKENS Estimate: $281,223
Length: 7.1 Miles Actual: $258,675
 
District: Tyler Let Date: NOV 2014
Highway: FM 1667 Let Status: Actual
Project ID: STP 2015(312) CSJ: 2476-01-009
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: SH 31, S Fund Cat: 1
Limits To: FM 764 IN TRINIDAD Estimate: $51,087
Length: 1.5 Miles Actual: $47,066
 
District: Tyler Let Date: NOV 2014
Highway: FM 2475 Let Status: Actual
Project ID: STP 2015(312) CSJ: 3263-01-007
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: HUNT C/L AT LAKE TAWAKONI ST PK, S Fund Cat: 1
Limits To: FM 47 Estimate: $181,819
Length: 4.2 Miles Actual: $163,358
 
District: Tyler Let Date: NOV 2014
Highway: FM 3328 Let Status: Actual
Project ID: STP 2015(312) CSJ: 3411-01-005
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: BEG ST MAINTENANCE, E Fund Cat: 1
Limits To: FM 645 Estimate: $46,406
Length: 1.4 Miles Actual: $42,730
 
District: Tyler Let Date: NOV 2014
Highway: FM 288 Let Status: Actual
Project ID: STP 2015(312) CSJ: 3424-01-001
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: SH 154, S Fund Cat: 1
Limits To: SH 182 NEAR LAKE FORK RESERVOIR Estimate: $54,910
Length: 2.0 Miles Actual: $50,528
 
Back...

Totals for 0083-06-038
Length: 268.5 Miles
Estimate: $9,239,741
Actual: $8,548,703

CCSJ: 0190-02-038

District: Tyler Let Date: JAN 2015
Highway: SH 37 Let Status: Actual
Project ID: STP 2015(534) CSJ: 0190-02-038
Description: REPAIR PAVEMENT & RESURFACE ROADWAY Handling
Code:
 
Limits From: 0.4 MI S OF FM 515 IN WINNSBORO, S Fund Cat: 1
Limits To: FM 2088 IN QUITMAN Estimate: $7,037,813
Length: 13.9 Miles Actual: $7,688,422
 
Back...

Totals for 0190-02-038
Length: 13.9 Miles
Estimate: $7,037,813
Actual: $7,688,422

CCSJ: 2958-01-013

District: Tyler Let Date: JUN 2015
Highway: FM 2869 Let Status: Actual
Project ID: SSW 2958-01-013 CSJ: 2958-01-013
Description: WIDEN ROAWAY FROM 20' TO 24' FOR SAFETY Handling
Code:
 
Limits From: FM 852, S OF WINNSBORO, S Fund Cat: 8
Limits To: N OF FM 2088 Estimate: $3,972,292
Length: 8.3 Miles Actual: $4,585,715
 
Back...

Totals for 2958-01-013
Length: 8.3 Miles
Estimate: $3,972,292
Actual: $4,585,715


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract