Detail Letting Schedule for Wood County (FY 2008)

 
 
Last Update: Monday, February 2, 2009
Wood County (FY 2008)

CCSJ: 0083-06-037

District: Tyler Let Date: NOV 2007
Highway: SH 294 Let Status: Actual
Project ID: STP 2008(150) CSJ: 0058-01-017
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: US 79, E Fund Cat: 1
Limits To: FM 322 Estimate: $234,260
Length: 7.4 Miles Actual: $190,906
 
District: Tyler Let Date: NOV 2007
Highway: SH 294 Let Status: Actual
Project ID: STP 2008(150) CSJ: 0058-02-020
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: FM 322, E Fund Cat: 1
Limits To: US 287 IN ELKHART (SECTIONS) Estimate: $196,643
Length: 2.4 Miles Actual: $158,512
 
District: Tyler Let Date: NOV 2007
Highway: SH 294 Let Status: Actual
Project ID: STP 2008(150) CSJ: 0058-03-022
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: 0.1 MI E OF US 287, E Fund Cat: 1
Limits To: FM 228 Estimate: $463,259
Length: 13.5 Miles Actual: $371,179
 
District: Tyler Let Date: NOV 2007
Highway: SH 11 Let Status: Actual
Project ID: STP 2008(150) CSJ: 0083-06-037
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: 0.2 MI W OF FM 852 (FRANKLIN C/L),E Fund Cat: 1
Limits To: 0.6 MI E OF FM 1647 (CAMP C/L) Estimate: $1,755,104
Length: 9.0 Miles Actual: $1,076,180
 
District: Tyler Let Date: NOV 2007
Highway: US 80 Let Status: Actual
Project ID: STP 2008(150) CSJ: 0095-07-056
Description: SEAL COAT AND PAVEMENT MARKINGS Handling
Code:
 
Limits From: 0.2 MI E OF FM 857(GRAND SALINE), E Fund Cat: 1
Limits To: 0.1 MI E OF FM 1255 (SMITH C/L) Estimate: $451,790
Length: 6.0 Miles Actual: $366,185
 
District: Tyler Let Date: NOV 2007
Highway: SH 19 Let Status: Actual
Project ID: STP 2008(150) CSJ: 0108-03-036
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: VAN ZANDT C/L, SOUTH Fund Cat: 1
Limits To: 0.4 MI S OF FM 2709 Estimate: $189,667
Length: 3.8 Miles Actual: $153,267
 
District: Tyler Let Date: NOV 2007
Highway: SH 19 Let Status: Actual
Project ID: STP 2008(150) CSJ: 0108-12-015
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: RAINS C/L, S Fund Cat: 1
Limits To: US 80 Estimate: $372,380
Length: 6.7 Miles Actual: $302,669
 
District: Tyler Let Date: NOV 2007
Highway: US 287 Let Status: Actual
Project ID: STP 2008(150) CSJ: 0109-01-054
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: FM 2419, S OF PALESTINE, S Fund Cat: 1
Limits To: SH 294 (W), IN ELKHART Estimate: $341,392
Length: 5.7 Miles Actual: $278,481
 
District: Tyler Let Date: NOV 2007
Highway: US 287 Let Status: Actual
Project ID: STP 2008(150) CSJ: 0109-02-023
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: SH 294 (W) IN ELKHART, S Fund Cat: 1
Limits To: HOUSTON C/L Estimate: $430,063
Length: 7.0 Miles Actual: $350,402
 
District: Tyler Let Date: NOV 2007
Highway: US 259 Let Status: Actual
Project ID: NH 2008(152) CSJ: 0138-03-138
Description: SEAL COAT & PAVEMENT MARKING Handling
Code:
 
Limits From: FM 850, SOUTH Fund Cat: 1
Limits To: US 79 IN HENDERSON (TRAFFIC STAR) Estimate: $596,844
Length: 8.5 Miles Actual: $482,631
 
District: Tyler Let Date: NOV 2007
Highway: SH 31 Let Status: Actual
Project ID: STP 2008(150) CSJ: 0164-03-050
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: 0.1 MI E OF FM 3204(E), EAST Fund Cat: 1
Limits To: 0.6 MI W OF FM 315(RR BRG IN CHDLR) Estimate: $210,699
Length: 2.1 Miles Actual: $171,351
 
District: Tyler Let Date: NOV 2007
Highway: SH 31 Let Status: Actual
Project ID: STP 2008(150) CSJ: 0164-04-155
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: HENDERSON C/L, E Fund Cat: 1
Limits To: SP 206, W OF TYLER Estimate: $454,986
Length: 4.0 Miles Actual: $370,082
 
District: Tyler Let Date: NOV 2007
Highway: US 271 Let Status: Actual
Project ID: STP 2008(150) CSJ: 0165-02-058
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: GREGG C/L, S Fund Cat: 1
Limits To: 0.3 MI N OF FM 16 Estimate: $240,878
Length: 4.4 Miles Actual: $195,674
 
District: Tyler Let Date: NOV 2007
Highway: US 69 Let Status: Actual
Project ID: NH 2008(152) CSJ: 0191-01-075
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: FM 344, S Fund Cat: 1
Limits To: CHEROKEE C/L Estimate: $837,589
Length: 7.6 Miles Actual: $652,977
 
District: Tyler Let Date: NOV 2007
Highway: US 69 Let Status: Actual
Project ID: STP 2008(150) CSJ: 0191-01-076
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: SH 64 (4TH ST), S Fund Cat: 1
Limits To: 0.1 MI N OF LP 323 IN TYLER Estimate: $134,755
Length: 1.9 Miles Actual: $106,066
 
District: Tyler Let Date: NOV 2007
Highway: US 69 Let Status: Actual
Project ID: NH 2008(152) CSJ: 0191-02-060
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: SMITH C/L IN BULLARD, S Fund Cat: 1
Limits To: 0.1 MI S OF FM 2493(N) Estimate: $105,425
Length: 1.2 Miles Actual: $82,205
 
District: Tyler Let Date: NOV 2007
Highway: US 79 Let Status: Actual
Project ID: NH 2008(152) CSJ: 0206-04-038
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: 2.7 MI W OF SH 110 IN NEW SMRFLD, W Fund Cat: 1
Limits To: 0.2 MI E OF SH 204, IN J'VILLE Estimate: $420,257
Length: 4.8 Miles Actual: $321,697
 
District: Tyler Let Date: NOV 2007
Highway: US 79 Let Status: Actual
Project ID: NH 2008(152) CSJ: 0206-05-029
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: SH 110, W Fund Cat: 1
Limits To: 2.7 MI W OF SH 110 IN NEW SMMRFLD Estimate: $249,874
Length: 2.8 Miles Actual: $191,554
 
District: Tyler Let Date: NOV 2007
Highway: SH 64 Let Status: Actual
Project ID: STP 2008(150) CSJ: 0245-01-029
Description: SEAL COAT AND PAVEMENT MARKINGS Handling
Code:
 
Limits From: US 80 IN WILLS POINT, S Fund Cat: 1
Limits To: 0.1 MI N OF IH 20 Estimate: $383,367
Length: 8.2 Miles Actual: $310,030
 
District: Tyler Let Date: NOV 2007
Highway: SH 64 Let Status: Actual
Project ID: STP 2008(150) CSJ: 0245-19-023
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: 0.3 MI W OF FM 773, E Fund Cat: 1
Limits To: 0.3 MI E OF FM 314 IN EDOM Estimate: $304,005
Length: 7.9 Miles Actual: $245,182
 
District: Tyler Let Date: NOV 2007
Highway: FM 349 Let Status: Actual
Project ID: STP 2008(150) CSJ: 0424-03-022
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: 0.1 MI E OF US 259 IN KILGORE, E Fund Cat: 1
Limits To: 0.1 MI WEST OF SH 322 Estimate: $297,106
Length: 7.4 Miles Actual: $240,511
 
District: Tyler Let Date: NOV 2007
Highway: SH 315 Let Status: Actual
Project ID: STP 2008(150) CSJ: 0462-01-021
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: 0.1 MI NE OF US 259 IN POLK, NE Fund Cat: 1
Limits To: 0.8 MI NE OF FM 840 (PANOLA C/L) Estimate: $472,029
Length: 8.6 Miles Actual: $383,136
 
District: Tyler Let Date: NOV 2007
Highway: FM 14 Let Status: Actual
Project ID: STP 2008(150) CSJ: 0492-01-032
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: FM 16, S Fund Cat: 1
Limits To: 0.1 MI N OF IH 20 Estimate: $194,666
Length: 5.5 Miles Actual: $156,455
 
District: Tyler Let Date: NOV 2007
Highway: SH 42 Let Status: Actual
Project ID: STP 2008(150) CSJ: 0545-03-012
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: 0.1 MI S OF FM 13, SOUTH Fund Cat: 1
Limits To: 0.1 MI N OF US 79 Estimate: $157,824
Length: 5.6 Miles Actual: $125,656
 
District: Tyler Let Date: NOV 2007
Highway: FM 839 Let Status: Actual
Project ID: CPM 545-5-15 CSJ: 0545-05-015
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: FM 1798, SOUTH Fund Cat: 1
Limits To: 0.1 MI N OF US 84 IN REKLAW Estimate: $280,061
Length: 11.7 Miles Actual: $226,336
 
District: Tyler Let Date: NOV 2007
Highway: SH 274 Let Status: Actual
Project ID: STP 2008(150) CSJ: 0561-02-033
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: KAUFMAN COUNTY LINE, S Fund Cat: 1
Limits To: 0.8 MI S OF FM 3225 S OF TOOL Estimate: $290,922
Length: 8.0 Miles Actual: $235,740
 
District: Tyler Let Date: NOV 2007
Highway: FM 47 Let Status: Actual
Project ID: STP 2008(150) CSJ: 0646-01-027
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: 0.1 MI S OF FM 2475, S Fund Cat: 1
Limits To: 0.2 MI N OF US 80, IN WILLS POINT Estimate: $209,206
Length: 5.4 Miles Actual: $168,509
 
District: Tyler Let Date: NOV 2007
Highway: SH 198 Let Status: Actual
Project ID: STP 2008(150) CSJ: 0646-05-031
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: 2.0 MI SE OF FM 316 IN PAYNE SPRG,S Fund Cat: 1
Limits To: SH 31 IN MALKOFF Estimate: $296,438
Length: 7.0 Miles Actual: $239,395
 
District: Tyler Let Date: NOV 2007
Highway: FM 343 Let Status: Actual
Project ID: CPM 926-1-19 CSJ: 0926-01-019
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: 0.1 MI E OF US 69 IN RUSK, E Fund Cat: 1
Limits To: 0.1 MI W OF NACOGDOCHES C/L Estimate: $247,778
Length: 10.9 Miles Actual: $200,259
 
District: Tyler Let Date: NOV 2007
Highway: FM 773 Let Status: Actual
Project ID: CPM 1099-4-11 CSJ: 1099-04-011
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: FM 1255, S Fund Cat: 1
Limits To: FM 16, W OF VAN Estimate: $167,621
Length: 6.2 Miles Actual: $133,306
 
District: Tyler Let Date: NOV 2007
Highway: SL 7 Let Status: Actual
Project ID: STP 2008(150) CSJ: 1099-05-027
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: W END OF FM 59 O/P, W & N Fund Cat: 1
Limits To: SH 31(W) IN ATHENS Estimate: $274,637
Length: 3.3 Miles Actual: $226,473
 
District: Tyler Let Date: NOV 2007
Highway: SH 31 Let Status: Actual
Project ID: STP 2008(150) CSJ: 1099-05-028
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: SL 7(W) IN ATHENS, NE Fund Cat: 1
Limits To: US 175(N) Estimate: $193,356
Length: 2.6 Miles Actual: $157,659
 
District: Tyler Let Date: NOV 2007
Highway: US 175 Let Status: Actual
Project ID: NH 2008(152) CSJ: 1099-05-029
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: SH 31/SL 7 IN NW ATHENS, E Fund Cat: 1
Limits To: SLSW R/R, 0.5 MI W OF FM 1616 Estimate: $198,411
Length: 2.9 Miles Actual: $161,554
 
District: Tyler Let Date: NOV 2007
Highway: FM 17 Let Status: Actual
Project ID: STP 2008(150) CSJ: 1110-02-003
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: 0.1 MI E OF SH 154 IN YANTIS, W & S Fund Cat: 1
Limits To: 0.1 MI W OF 515, AT LAKE FORK RESVR Estimate: $117,809
Length: 4.6 Miles Actual: $93,817
 
District: Tyler Let Date: NOV 2007
Highway: FM 2015 Let Status: Actual
Project ID: STP 2008(150) CSJ: 1934-02-002
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: FM 16, S Fund Cat: 1
Limits To: 0.1 MI N OF US 271 Estimate: $243,450
Length: 8.7 Miles Actual: $193,166
 
District: Tyler Let Date: NOV 2007
Highway: FM 2204 Let Status: Actual
Project ID: STP 2008(150) CSJ: 2072-01-014
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: 0.3 MI W OF US 259 O/P IN KILGORE,E Fund Cat: 1
Limits To: 0.1 MI W OF SH 322 Estimate: $238,847
Length: 6.6 Miles Actual: $191,875
 
District: Tyler Let Date: NOV 2007
Highway: FM 2966 Let Status: Actual
Project ID: STP 2008(150) CSJ: 2409-01-009
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: 0.1 MI E OF SH 154 IN YANTIS, E & S Fund Cat: 1
Limits To: 0.1 MI N OF FM 515 Estimate: $197,686
Length: 7.2 Miles Actual: $157,819
 
District: Tyler Let Date: NOV 2007
Highway: FM 2605 Let Status: Actual
Project ID: CPM 2622-1-4 CSJ: 2622-01-004
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: 2.4 MI W OF FM 1845(END OF ST MNT)E Fund Cat: 1
Limits To: 0.1 MI W OF FM 1845 IN LONGVIEW Estimate: $85,754
Length: 2.2 Miles Actual: $69,043
 
District: Tyler Let Date: NOV 2007
Highway: FM 2659 Let Status: Actual
Project ID: CPM 2655-1-6 CSJ: 2655-01-006
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: 0.1 MI E OF FM 14 E & S Fund Cat: 1
Limits To: 0.1 MI N OF US 80, E OF HAWKINS Estimate: $162,176
Length: 6.0 Miles Actual: $128,920
 
District: Tyler Let Date: NOV 2007
Highway: FM 2709 Let Status: Actual
Project ID: CPM 2743-1-8 CSJ: 2743-01-008
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: 0.1 MI E OF FM 316 NEAR EUSTACE, E Fund Cat: 1
Limits To: 0.1 MI W OF SH 19 Estimate: $243,614
Length: 9.2 Miles Actual: $193,191
 
District: Tyler Let Date: NOV 2007
Highway: LP 571 Let Status: Actual
Project ID: STP 2008(150) CSJ: 3421-01-011
Description: SEAL COAT & PAVEMENT MARKINGS Handling
Code:
 
Limits From: US 259 IN HENDERSON, SW & SE Fund Cat: 1
Limits To: US 79 Estimate: $448,305
Length: 5.8 Miles Actual: $366,737
 
Back...

Totals for 0083-06-037
Length: 250.3 Miles
Estimate: $13,390,933
Actual: $10,426,787

CCSJ: 0190-03-074

District: Tyler Let Date: SEP 2007
Highway: SH 37 Let Status: Actual
Project ID: STP 2008(023)HES CSJ: 0190-03-074
Description: ADD LEFT TURN LANE Handling
Code:
 
Limits From: AT CR 2460 Fund Cat: 8
Limits To: N OF MINEOLA Estimate: $869,204
Length: 0.2 Miles Actual: $510,846
 
District: Tyler Let Date: SEP 2007
Highway: FM 852 Let Status: Actual
Project ID: STP 2008(023)HES CSJ: 0767-04-005
Description: WIDEN PAVEMENT TO 28' Handling
Code:
 
Limits From: FM 515 IN WINNSBORO, SE Fund Cat: 8
Limits To: FM 2088 Estimate: $4,218,443
Length: 10.3 Miles Actual: $3,908,284
 
Back...

Totals for 0190-03-074
Length: 10.5 Miles
Estimate: $5,087,647
Actual: $4,419,130

CCSJ: 0657-03-013

District: Tyler Let Date: APR 2008
Highway: FM 515 Let Status: Actual
Project ID: STP 2008(514) CSJ: 0657-03-013
Description: WIDEN ROADWAY TO 28' Handling
Code:
 
Limits From: .95 MI W OF FM 17(S)(RAINS C/L), E Fund Cat: 1
Limits To: SH 154 AT LAKE FORK RESVR Estimate: $2,549,593
Length: 5.0 Miles Actual: $2,081,641
 
Back...

Totals for 0657-03-013
Length: 5.0 Miles
Estimate: $2,549,593
Actual: $2,081,641


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract