COUNTY: ORANGE HIGHWAY: FM1135 LENGTH: 0.01MI CONTROL NUMBER: 6403-74-001 SBE GOAL: 0.0 % PROJECT NUMBER: RMC - 640374001 TYPE: ACP OVERLAY TIME FOR COMPLETION: 180 WORKING DAYSGUARANTY: 23,000.00 BIDS RECEIVED UNTIL: 1:00 PM AUGUST 04, 2022 EST.COST: 1,170,807.44 BIDS WILL BE OPENED: 1:00 PM AUGUST 04, 2022 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONCHRIS HENRY, P.E. ATTN: CONSTRUCTION DIVISION - M1C3.02 8350 EASTEX FREEWAY 6230 E. STASSNEY LANEBEAUMONT, TX 77708 AUSTIN TX 78744-3147409/898-5787 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: SFR IH 10 LIMITS TO: FM 105 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 134 6001BACKFILL (TY A)STA 212.0001 351 6004FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")SY 2,102.0002 354 6002PLAN & TEXT ASPH CONC PAV(0" TO 2")SY 1,300.0003 432 6045RIPRAP (MOW STRIP)(4 IN)CY 16.0004 500 6001MOBILIZATIONLS 1.0005 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 3.0006 533 6004RUMBLE STRIPS (CENTERLINE) ASPHALTLF 21,049.0007 540 6002MTL W-BEAM GD FEN (STEEL POST)LF 72.0008 540 6013TRANSITION ADJUSTMENTEA 4.0009 540 6014SHORT RADIUSLF 92.00010 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 5.00011 540 6023MTL BEAM GD FEN TRANS(THRIE BEAM)28"EA 4.00012 542 6002REMOVE TERMINAL ANCHOR SECTIONEA 12.00013 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 3.00014 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 24.00015 658 6071INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)EA 24.00016 662 6109WK ZN PAV MRK SHT TERM (TAB)TY WEA 14.00017 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 557.00018 666 6035REFL PAV MRK TY I (W)8"(SLD)(090MIL)LF 108.00019 666 6302RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)LF 42,193.00020 666 6311RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)LF 5,320.00021 666 6314RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)LF 13,927.00022 668 6076PREFAB PAV MRK TY C (W) (24") (SLD)LF 124.00023 668 6089PREFAB PAV MRK TY C (W) (RR XING)EA 2.00024 672 6007REFL PAV MRKR TY I-CEA 7.00025 672 6009REFL PAV MRKR TY II-A-AEA 400.00026 30776023SP MIXES SP-C SAC-B PG70-22TON 6,303.00027 30776075TACK COATGAL 3,347.00028 61856002TMA (STATIONARY)DAY 43.00029 61856005TMA (MOBILE OPERATION)DAY 9.00030