COUNTY: DALLAS HIGHWAY: IH0035E LENGTH: 0.01MI CONTROL NUMBER: 6399-97-001 SBE GOAL: 0.0 % PROJECT NUMBER: RMC - 639997001 TYPE: PERFORMANCE BASED CONTRACT TIME FOR COMPLETION: 730 CALENDAR DAYSGUARANTY: 68,000.00 BIDS RECEIVED UNTIL: 1:00 PM AUGUST 03, 2022 EST.COST: 3,397,939.24 BIDS WILL BE OPENED: 1:00 PM AUGUST 03, 2022 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONDAVID MORREN ATTN: CONSTRUCTION DIVISION - M1C3.02 4777 EAST HIGHWAY 80 6230 E. STASSNEY LANEMESQUITE, TX 75150 AUSTIN TX 78744-3147214/319-3574 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: VARIOUS MANAGED LANES IN DALLAS LIMITS TO: I35E/US67 ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 361 6008FULL - DEPTH REPAIR CRCP (14")SY 150.0001 429 6007CONC STR REPAIR (VERTICAL & OVERHEAD)SF 400.0002 438 6001CLEANING AND SEALING EXISTING JOINTSLF 800.0003 438 6009CLEANING EXISTING JOINTSLF 800.0004 500 6001MOBILIZATIONLS 1.0005 512 6013PORT CTB (DES SOURCE)(SGL SLP)(TY 1)LF 120.0006 512 6049PORT CTB (REMOVE)(SGL SLP)(TY 1)LF 120.0007 536 6002CONC MEDIANSY 170.0008 636 6007REPLACE EXISTING ALUMINUM SIGNS(TY A)SF 5.0009 636 6009REPLACE EXISTING ALUMINUM SIGNS(TY O)SF 5.00010 644 6012IN SM RD SN SUP&AM TY10BWG(1)SB(T)EA 5.00011 644 6042IN SM RD SN SUP&AM TYS80(1)SB(T)EA 5.00012 644 6056IN SM RD SN SUP&AM TYTWT(1)UA(P)EA 5.00013 644 6064IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)EA 3.00014 644 6066IN SM RD SN SUP&AM (RAIL MOUNT)EA 3.00015 650 6204REMOVE OVERHD SIGN SUPEA 2.00016 658 6014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA 125.00017 658 6026INSTL DEL ASSM (D-SY)SZ (BRF)CTBEA 30.00018 658 6061INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2EA 20.00019 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 20.00020 658 6064INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2EA 20.00021 666 6079REFL PAV MRK TY I(W)(ENTR GORE)(060MIL)EA 5.00022 666 6082REFL PAV MRK TY I(W)(EXIT GORE)(060MIL)EA 5.00023 666 6239PAVEMENT SEALER (ENTR GORE)EA 5.00024 666 6240PAVEMENT SEALER (EXIT GORE)EA 5.00025 672 6010REFL PAV MRKR TY II-C-REA 540.00026 672 6038REFL PAV MRKR TY II-C-CEA 381.00027 677 6001ELIM EXT PAV MRK & MRKS (4")LF 80,952.00028 677 6002ELIM EXT PAV MRK & MRKS (6")LF 70,715.00029 677 6005ELIM EXT PAV MRK & MRKS (12")LF 1,770.00030 677 6007ELIM EXT PAV MRK & MRKS (24")LF 36.00031 677 6012ELIM EXT PAV MRK & MRKS (WORD)EA 5.00032 677 6013ELIM EXT PAV MRK & MRKS (ENTR GORE)EA 4.00033 677 6014ELIM EXT PAV MRK & MRKS (EXIT GORE)EA 4.00034 678 6001PAV SURF PREP FOR MRK (4")LF 80,952.00035 678 6002PAV SURF PREP FOR MRK (6")LF 70,715.00036 678 6006PAV SURF PREP FOR MRK (12")LF 1,770.00037 678 6008PAV SURF PREP FOR MRK (24")LF 36.00038 678 6016PAV SURF PREP FOR MRK (WORD)EA 5.00039 678 6017PAV SURF PREP FOR MRK (ENTR GORE)EA 4.00040 678 6018PAV SURF PREP FOR MRK (EXIT GORE)EA 4.00041 720 6001SPALLING REPAIR (HYDRAULIC CEMENT)CF 150.00042 721 6002FIBER REINFORCED POLYMER PATCHING MATLSLB 500.00043 730 6002FULL - WIDTH MOWINGAC 202.00044 731 6006BROADCAST APPLICATIONMI 68.00045 731 6007PAVEMENT EDGES, STRUCTURES & FIXTURESMI 2.00046 734 6001LITTER REMOVALAC 240.00047 740 6002GRAFFITI REMOVAL (PAINTING)SF 200.00048 770 6001REPAIR RAIL ELEMENT (W - BEAM)LF 600.00049 770 6002REPAIR RAIL ELEMENT (THRIE - BEAM)LF 38.00050 770 6003REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)LF 25.00051 770 6008REALIGN EXISTING RAILLF 600.00052 770 6010REM / REPL TIMBER/STL POST W/O CONC FNDEA 96.00053 770 6017REALIGN POSTSEA 96.00054 770 6019REMOVE & REPLACE BLOCKOUTEA 96.00055 770 6021REPLACE SINGLE GDRAIL TERMINAL RAILLF 250.00056 770 6022REPLACE SINGLE GDRAIL TERMINAL POSTEA 12.00057 770 6024REPLACE TERMINAL ANCHOR POSTSEA 12.00058 770 6027REMOVE GDRAIL END TRT / REPL WITH SGTEA 4.00059 770 6028REPL SINGLE GDRAIL TERM IMPACT HEADEA 4.00060 770 6029REM & RESET SGT IMPACT HEADEA 4.00061 770 6055REPAIR SINGLE GUARDRAIL TERMINALEA 4.00062 770 6060REMOVE AND REPLACE DATEA 2.00063 774 6044REMOVE AND REPLACE (SMTC) (N)EA 6.00064 774 6059REPAIR (TRACC) (BAY)EA 6.00065 774 6068REPAIR (SMTC) (N)LF 150.00066 778 6002CONCRETE RAIL REPAIR (MISC)LF 400.00067 785 6001BRIDGE JOINT REPAIR (CONCRETE)LF 400.00068 30256001RAISING AND UNDERSEALING CONCRETE SLABLB 1,000.00069 60386001MULTIPOLYMER PAV MRK (W)(4")(SLD)LF 69,612.00070 60386004MULTIPOLYMER PAV MRK (W)(6")(SLD)LF 69,612.00071 60386005MULTIPOLYMER PAV MRK (W)(6")(BRK)LF 485.00072 60386006MULTIPOLYMER PAV MRK (W)(6")(DOT)LF 618.00073 60386007MULTIPOLYMER PAV MRK (W)(8")(SLD)LF 11,336.00074 60386011MULTIPOLYMER PAV MRK (W)(12")(SLD)LF 1,770.00075 60386013MULTIPOLYMER PAV MRK (W)(24")(SLD)LF 36.00076 60386014MULTIPOLYMER PAV MRK (Y)(4")(SLD)LF 11,340.00077 60386020MULTIPOLYMER PAV MRK (Y)(8")(SLD)LF 400.00078 60386027MULTIPOLYMER PAV MRK (W) (WORD)EA 5.00079 61856002TMA (STATIONARY)DAY 60.00080 72986001PARTIAL ABG REPLACEMENTSLF 36.00081 72986002COMPLETE ABG REPLACEMENTSEA 6.00082 72986003REPLACE VAB SYSTEMS- NETSEA 4.00083 72986004REPLACE VAB SYSTEMS- TAPESEA 16.00084 72986005PERF BASED OPER & MAINT MANAGED LANESMO 24.00085