COUNTY: BEXAR HIGHWAY: SL1604 LENGTH: 0.01MI CONTROL NUMBER: 6374-16-001 SBE GOAL: 0.0 % PROJECT NUMBER: BPM - 637416001 TYPE: BRIDGE PREVENTATIVE MAINTENANCE TIME FOR COMPLETION: 32 WORKING DAYSGUARANTY: 5,000.00 BIDS RECEIVED UNTIL: 1:30 PM MAY 12, 2021 EST.COST: 272,608.44 BIDS WILL BE OPENED: 1:30 PM MAY 12, 2021 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONTIM PARKER SAN ANTONIO DISTRICT9320 SE LOOP 410 ATTN: MAINTENANCE CONTRACT OFFICE, TX 0 4615 NW LOOP 4100 SAN ANTONIO, TX 782290-000 210/615-5801 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: IH 35 NBFR AT LEON CREEK AND LIMITS TO: LOOP 1604 AT MEDINA RIVER ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 161 6017COMPOST MANUF TOPSOIL (4")SY 700.0001 164 6003BROADCAST SEED (PERM) (RURAL) (CLAY)SY 700.0002 169 6001SOIL RETENTION BLANKETS (CL 1) (TY A)SY 700.0003 432 6024RIPRAP (STONE COMMON)(DRY)(12 IN)CY 141.0004 432 6026RIPRAP (STONE COMMON)(DRY)(18 IN)CY 345.0005 459 6007GABION MATTRESSES (GALV)(12 IN)SY 1,145.0006 500 6001MOBILIZATIONLS 1.0007 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 2.0008 506 6020CONSTRUCTION EXITS (INSTALL) (TY 1)SY 224.0009 506 6024CONSTRUCTION EXITS (REMOVE)SY 224.00010 506 6041BIODEG EROSN CONT LOGS (INSTL) (12")LF 200.00011 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 200.00012 734 6001LITTER REMOVALAC 1.00013 752 6015TREE AND BRUSH REMOVALAC 1.30014 61856002TMA (STATIONARY)DAY 5.00015