COUNTY: NEWTON HIGHWAY: FM2829 LENGTH: 1MI CONTROL NUMBER: 6335-67-001 SBE GOAL: 0.0 % PROJECT NUMBER: RMC - 633567001 TYPE: FM 2829 OVERLAY TIME FOR COMPLETION: 39 WORKING DAYSGUARANTY: 18,000.00 BIDS RECEIVED UNTIL: 1:00 PM FEBRUARY 05, 2019*EST.COST: 887,002.73 BIDS WILL BE OPENED: 1:00 PM FEBRUARY 05, 2019 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONBYFORD, VADA P.E. ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 3304 US 190 W 200 E RIVERSIDEJASPER, TX 759510000 AUSTIN TX 78704-1204406/384-5493 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: SH 87 LIMITS TO: END OF MAINTENANCE ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 134 6001BACKFILL (TY A)STA 105.9201 162 6002BLOCK SODDINGSY 260.0002 168 6001VEGETATIVE WATERINGMG 13.0003 340 6064D-GR HMA(SQ) TY-C SAC-B PG76-22TON 3,652.0004 400 6005CEM STABIL BKFLCY 13.0005 400 6008CUT & RESTORE ASPH PAVINGSY 20.0006 402 6001TRENCH EXCAVATION PROTECTIONLF 120.0007 432 6002RIPRAP (CONC)(5 IN)CY 7.8008 462 6052CONC BOX CULV (5 FT X 4 FT)(EXTEND)LF 36.0009 464 6003RC PIPE (CL III)(18 IN)LF 24.00010 467 6182SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)EA 6.00011 467 6358SET (TY II) (18 IN) (RCP) (4: 1) (C)EA 6.00012 467 6377SET (TY II) (24 IN) (CMP) (4: 1) (C)EA 2.00013 480 6001CLEAN EXIST CULVERTSEA 5.00014 496 6006REMOV STR (HEADWALL)EA 8.00015 500 6001MOBILIZATIONLS 1.00016 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 5.00017 506 6041BIODEG EROSN CONT LOGS (INSTL) (12")LF 750.00018 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 750.00019 510 6003ONE-WAY TRAF CONT (PORT TRAF SIG)MO 3.00020 530 6011INTRSCT, DRVWAYS, & TURNOUT (ACP)SY 1,142.00021 530 6016 DRIVEWAYS (BASE)SY 1,142.00022 533 6004RUMBLE STRIPS (CENTERLINE) ASPHALTLF 9,854.00023 658 6048INSTL OM ASSM (OM-2Z)(FLX)GNDEA 4.00024 658 6049INSTL OM ASSM (OM-2Z)(FLX)GND(BI)EA 8.00025 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 1,089.00026 666 6302RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)LF 21,255.00027 666 6311RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)LF 1,820.00028 666 6314RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)LF 10,760.00029 668 6076PREFAB PAV MRK TY C (W) (24") (SLD)LF 25.00030 672 6013TRAFFIC BUTTON TY II-A-AEA 256.00031 752 6003TREE TRIMMING / BRUSH REMOVALMI 1.13032 61856001TMA (STATIONARY)EA 1.00033 61856003TMA (MOBILE OPERATION)HR 16.00034 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK $62,836.62