COUNTY: DALLAS HIGHWAY: US0075 LENGTH: 0.0010MI CONTROL NUMBER: 6333-41-001 SBE GOAL: 0.0 % PROJECT NUMBER: BPM - 633341001 TYPE: BPM - BRIDGE REPAIR TIME FOR COMPLETION: 24 WORKING DAYSGUARANTY: 7,000.00 BIDS RECEIVED UNTIL: 1:00 PM FEBRUARY 05, 2019*EST.COST: 336,285.00 BIDS WILL BE OPENED: 1:00 PM FEBRUARY 05, 2019 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONTERRY BLOCKER ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 4777 E. HWY 80 200 E RIVERSIDEMESQUITE, TX 751500000 AUSTIN TX 78704-1204214/320-6296 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: US 75 SBML LIMITS TO: AT WHITE ROCK CREEK ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 361 6051FULL-DPTH REP(BR APPROACH SLAB)(9"-13")SY 8.6001 429 6005CONC STR REPAIR(DECK REP (FULL DEPTH))SF 1,212.5002 429 6007CONC STR REPAIR (VERTICAL & OVERHEAD)SF 30.0003 454 6004ARMOR JOINT (SEALED)LF 155.0004 500 6001MOBILIZATIONLS 1.0005 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 1.0006 512 6089PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)LF 400.0007 512 6090PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)LF 2,400.0008 512 6091PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)LF 400.0009 545 6001CRASH CUSH ATTEN (INSTL)EA 1.00010 545 6003CRASH CUSH ATTEN (MOVE & RESET)EA 6.00011 545 6005CRASH CUSH ATTEN (REMOVE)EA 1.00012 780 6002CNC CRACK REPAIR (DISCRETE)(INJECT)LF 43.00013 60016002PORTABLE CHANGEABLE MESSAGE SIGNEA 2.00014 61856001TMA (STATIONARY)EA 3.00015 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK $1.00