COUNTY: HIDALGO HIGHWAY: FM0088 LENGTH: 0.01MI CONTROL NUMBER: 6318-30-001 SBE GOAL: 0.0 % PROJECT NUMBER: BPM - 631830001 TYPE: BRIDGE PREVENTIVE MAINTENANCE TIME FOR COMPLETION: 140 WORKING DAYSGUARANTY: 20,000.00 BIDS RECEIVED UNTIL: 1:00 PM FEBRUARY 05, 2019 EST.COST: 1,054,565.00 BIDS WILL BE OPENED: 1:00 PM FEBRUARY 05, 2019 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONREX COSTLEY ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 600 W. INTERSTATE 2 200 E RIVERSIDEPHARR, TEXAS, TX 785770000 AUSTIN TX 78704-1204956/702-6137 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: DISTRICT WIDE LIMITS TO: VARIOUS ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 104 6028REMOVING CONC (MISC)SY 119.0001 110 6002EXCAVATION (CHANNEL)CY 578.0002 132 6003EMBANKMENT (FINAL)(ORD COMP)(TY B)CY 113.0003 340 6104D-GR HMA(SQ) TY-D SAC-B PG64-22TON 118.0004 354 6177PLANE ASPH CONC PAV (1.5"-2")SY 1,272.0005 400 6006CUT & RESTORING PAVSY 668.0006 401 6001FLOWABLE BACKFILLCY 25.0007 409 6002PRESTR CONC PIL (18 IN SQ)LF 540.0008 420 6029CL C CONC (CAP)CY 22.0009 420 6071CL C CONC (COLLAR)EA 4.00010 429 6007CONC STR REPAIR (VERTICAL & OVERHEAD)SF 54.00011 432 6001RIPRAP (CONC)(4 IN)CY 232.00012 432 6002RIPRAP (CONC)(5 IN)CY 281.00013 432 6024RIPRAP (STONE COMMON)(DRY)(12 IN)CY 372.00014 432 6045RIPRAP (MOW STRIP)(4 IN)CY 227.30015 438 6001CLEANING AND SEALING EXISTING JOINTSLF 772.00016 450 6023RAIL (TY SSTR)LF 104.00017 451 6048RETROFIT RAIL (ADD HSS)LF 122.00018 464 6005RC PIPE (CL III)(24 IN)LF 48.00019 467 6390SET (TY II) (24 IN) (RCP) (4: 1) (C)EA 8.00020 496 6007REMOV STR (PIPE)LF 64.00021 500 6001MOBILIZATIONLS 1.00022 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 7.00023 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 620.00024 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 620.00025 512 6014PORT CTB (DES SOURCE)(SGL SLP)(TY 2)LF 1,140.00026 512 6026PORT CTB (MOVE)(SGL SLP)(TY 2)LF 1,140.00027 512 6038PORT CTB (STKPL)(SGL SLP)(TY 2)LF 1,140.00028 540 6001MTL W-BEAM GD FEN (TIM POST)LF 3,150.00029 540 6006MTL BEAM GD FEN TRANS (THRIE-BEAM)EA 20.00030 540 6016DOWNSTREAM ANCHOR TERMINAL SECTIONEA 2.00031 540 6018MTL BM GD FEN TRANS (NON - SYM)EA 12.00032 542 6001REMOVE METAL BEAM GUARD FENCELF 5,602.00033 542 6003REMOVE DOWNSTREAM ANCHOR TERMINALEA 2.00034 542 6004RM MTL BM GD FENCE TRANS (THRIE-BEAM)EA 2.00035 544 6003GUARDRAIL END TREATMENT (REMOVE)EA 16.00036 544 6004GDRAIL END TRT(INST)(WOOD POST)(TY I)EA 16.00037 545 6002CRASH CUSH ATTEN (DES SOURCE)EA 2.00038 545 6003CRASH CUSH ATTEN (MOVE & RESET)EA 2.00039 545 6004CRASH CUSH ATTEN (STKPL)EA 2.00040 658 6002INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)EA 40.00041 658 6014INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)EA 48.00042 666 6300RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)LF 80.00043 666 6303RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF 840.00044 666 6312RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)LF 150.00045 666 6315RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF 360.00046 752 6006TREE REMOVAL (12" - 18" DIA)EA 4.00047 760 6001DITCH CLEANING AND RESHAPING (FOOT)LF 300.00048 770 6006RAISE RAIL ELEMENTLF 200.00049 778 6075CONC RAIL REPAIR(REMOVE AND REPL RAIL)LF 8.00050 788 6002CONCRETE BEAM REPAIR (CFRP)EA 2.00051 61856002TMA (STATIONARY)DAY 40.00052