COUNTY: ANDERSON HIGHWAY: FM 2054 LENGTH: 3.4480MI CONTROL NUMBER: 3199-01-008 SBE GOAL: 0.0 % PROJECT NUMBER: SSW 3199-1-8 TYPE: GR,BS,OCST,ACP SURF,STRS,PVT MRKG TIME FOR COMPLETION: 125 WORKING DAYSGUARANTY: 54,000.00 BIDS RECEIVED UNTIL: 1:00 PM JULY 11, 2018*EST.COST: 2,856,015.70 BIDS WILL BE OPENED: 1:00 PM JULY 11, 2018 MAIL OR DELIVER BIDS TO: FOR PS&E PROJECT QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONMKIM SOUCEK ATTN: CONSTRUCTION DIVISION - ROOM 1A.2 2400 NE SL 7 200 E RIVERSIDEATHENS, TX 75752 AUSTIN TX 78704-1204903/675-4196 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: FM 321 NEAR TENNESSEE COLONY, SW LIMITS TO: .866 MI S OF CR2802 (END ST MAINT) ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 7.0001 104 6009REMOVING CONC (RIPRAP)SY 1.0002 104 6017REMOVING CONC (DRIVEWAYS)SY 90.0003 112 6001SUBGRADE WIDENING (ORD COMP)STA 178.3304 132 6021EMBANKMENT (VEHICLE)(ORD COMP)(TY C)CY 235.0005 134 6001BACKFILL (TY A)STA 47.0006 134 6002BACKFILL (TY B)STA 130.8707 150 6001BLADINGSTA 177.8708 160 6003FURNISHING AND PLACING TOPSOIL (4")SY 9,438.0009 164 6054BOND FBR MTRX SEED (PERM)(RURAL)(SAND)SY 41,306.00010 164 6055BONDED FBR MTRX SEED (TEMP)(WARM)SY 20,653.00011 164 6056BONDED FBR MTRX SEED (TEMP)(COOL)SY 20,653.00012 168 6001VEGETATIVE WATERINGMG 2,165.00013 316 6406ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)GAL 23,373.00014 316 6407AGGR (TY-PD GR-3 OR TY-PL GR-3)CY 557.00015 340 6106D-GR HMA(SQ) TY-D PG64-22TON 126.00016 344 6011SUPERPAVE MIXTURES SP-B PG64-22TON 7,815.00017 344 6119SUPERPAVE MIXTURES SP-D SAC-A PG70-22TON 4,591.00018 351 6002FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")SY 1,200.00019 354 6051PLANE ASPH CONC PAV (0" TO 1 1/2")SY 1,103.00020 403 6001TEMPORARY SPL SHORINGSF 2,170.00021 420 6071CL C CONC (COLLAR)EA 3.00022 432 6002RIPRAP (CONC)(5 IN)CY 7.00023 432 6006RIPRAP (CONC)(CL B)CY 1.00024 432 6026RIPRAP (STONE COMMON)(DRY)(18 IN)CY 39.00025 432 6045RIPRAP (MOW STRIP)(4 IN)CY 31.00026 464 6003RC PIPE (CL III)(18 IN)LF 870.00027 464 6005RC PIPE (CL III)(24 IN)LF 106.00028 464 6009RC PIPE (CL III)(42 IN)LF 20.00029 464 6014RC PIPE (CL III)(72 IN)LF 28.00030 466 6007HEADWALL (CH - FW - 0) (DIA= 30 IN)EA 1.00031 466 6060HEADWALL (CH - FW - 45) (DIA= 72 IN)EA 1.00032 466 6102HEADWALL (CH - PW - 0) (DIA= 42 IN)EA 3.00033 466 6104HEADWALL (CH - PW - 0) (DIA= 54 IN)EA 1.00034 466 6140HEADWALL (CH - PW - S) (DIA= 72 IN)EA 1.00035 467 6358SET (TY II) (18 IN) (RCP) (4: 1) (C)EA 2.00036 467 6363SET (TY II) (18 IN) (RCP) (6: 1) (P)EA 64.00037 467 6390SET (TY II) (24 IN) (RCP) (4: 1) (C)EA 4.00038 467 6395SET (TY II) (24 IN) (RCP) (6: 1) (P)EA 8.00039 467 6463SET (TY II) (42 IN) (RCP) (4: 1) (C)EA 1.00040 480 6001CLEAN EXIST CULVERTSEA 2.00041 496 6016REMOV STR (PIPE)EA 35.00042 500 6001MOBILIZATIONLS 1.00043 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 11.00044 506 6002ROCK FILTER DAMS (INSTALL) (TY 2)LF 900.00045 506 6011ROCK FILTER DAMS (REMOVE)LF 900.00046 506 6029EARTHWORK (EROSN & SEDMT CONT, IN VEH)CY 50.00047 506 6030BACKHOE WORK (EROSION & SEDMT CONT)HR 50.00048 506 6038TEMP SEDMT CONT FENCE (INSTALL)LF 5,500.00049 506 6039TEMP SEDMT CONT FENCE (REMOVE)LF 5,500.00050 506 6046TRACKHOE WORK (EROSION & SEDMT CONT)HR 50.00051 530 6005DRIVEWAYS (ACP)SY 2,701.00052 530 6008TURNOUTS (ACP)SY 141.00053 530 6017DRIVEWAYS (CONC) (HES)SY 64.00054 540 6001MTL W-BEAM GD FEN (TIM POST)LF 312.50055 544 6001GUARDRAIL END TREATMENT (INSTALL)EA 4.00056 560 6004MAILBOX INSTALL-S (TWG-POST) TY 2EA 11.00057 560 6005MAILBOX INSTALL-D (TWG-POST) TY 2EA 3.00058 644 6004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA 4.00059 644 6060IN SM RD SN SUP&AM TYTWT(1)WS(P)EA 28.00060 644 6076REMOVE SM RD SN SUP&AMEA 19.00061 658 6049INSTL OM ASSM (OM-2Z)(FLX)GND(BI)EA 20.00062 658 6062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA 15.00063 662 6029WK ZN PAV MRK NON-REMOV(W)(WORD)EA 2.00064 662 6032WK ZN PAV MRK NON-REMOV (Y)4"(BRK)LF 2,780.00065 662 6034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF 18,940.00066 662 6075WK ZN PAV MRK REMOV (W)24"(SLD)LF 110.00067 662 6093WK ZN PAV MRK REMOV (Y)4"(BRK)LF 1,251.00068 662 6095WK ZN PAV MRK REMOV (Y)4"(SLD)LF 4,266.00069 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 1,781.00070 666 6048REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF 110.00071 666 6342REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)LF 35,256.00072 666 6344REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)LF 2,780.00073 666 6345REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)LF 18,940.00074 668 6085PREFAB PAV MRK TY C (W) (WORD)EA 2.00075 672 6006REFL PAV MRKR TY I-AEA 66.00076 672 6009REFL PAV MRKR TY II-A-AEA 385.00077 60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY 28.00078 61856001TMA (STATIONARY)EA 1.00079 61856002TMA (STATIONARY)DAY 30.00080 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK $7,000.00