COUNTY: HARDIN HIGHWAY: FM 2937 LENGTH: 5.8120MI CONTROL NUMBER: 2952-01-009 SBE GOAL: 0.0 % PROJECT NUMBER: C 2952-1-9 TYPE: REHABILITATION OF EXISTING ROAD TIME FOR COMPLETION: 133 WORKING DAYSGUARANTY: 100,000.00 BIDS RECEIVED UNTIL: 1:00 PM JUNE 05, 2024*EST.COST: 9,527,630.17 BIDS WILL BE OPENED: 1:00 PM JUNE 05, 2024 MAIL OR DELIVER BIDS TO: FOR PS&E PACKAGE QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATIONDAVID COLLINS ATTN: CONSTRUCTION DIVISION - RM M1C3.02 8350 EASTEX FREEWAY 6230 E. STASSNEY LANEBEAUMONT, TX 77708 AUSTIN TX 78744-3147409/898-5836 FOR QUESTIONS REGARDING A PROPOSAL CALL 512/416-2498 TO REQUEST A PROPOSAL GO TO http://www.dot.state.tx.us/business/pr.htm FOR ELECTRONIC BIDDING VISIT THE WEBSITE BELOW: http://www.txdot.gov/business/letting-bids/ebs.html LIMITS FROM: FM 92, SOUTH LIMITS TO: END OF MAINTENANCE ------------------------------------------------------------------------------------------------------------- ITEM DESAPPROXIMATE ALT NO. CD. ITEM DESCRIPTIONUNITQUANTITIESBID PRICEAMOUNTSEQ ------------------------------------------------------------------------------------------------------------- 100 6002PREPARING ROWSTA 137.0001 104 6017REMOVING CONC (DRIVEWAYS)SY 106.0002 112 6001SUBGRADE WIDENING (ORD COMP)STA 308.0003 134 6004BACKFILL (TY A OR B)STA 308.0004 150 6003BLADINGLF 1,900.0005 164 6011BROADCAST SEED (TEMP) (COOL)SY 43,426.0006 164 6021CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)SY 43,426.0007 168 6001VEGETATIVE WATERINGMG 367.0008 247 6041FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)CY 16,914.0009 251 6034REWORK BS MTL (TY C) (8") (ORD COMP)SY 61,569.00010 275 6001CEMENTTON 736.00011 275 6014CEMENT TREAT (MX EXST MTL & NW BS)(8")SY 99,517.00012 316 6029ASPH (RC-250)GAL 19,790.00013 316 6210AGGR(TY-L GR-5 SAC-B)CY 792.00014 400 6005CEM STABIL BKFLCY 72.00015 400 6015 CEM STABIL BKFL (SPL)CY 90.00016 432 6031RIPRAP (STONE PROTECTION)(12 IN)CY 36.00017 462 6050CONC BOX CULV (5 FT X 2 FT)(EXTEND)LF 16.00018 462 6053CONC BOX CULV (5 FT X 5 FT)(EXTEND)LF 8.00019 464 6003RC PIPE (CL III)(18 IN)LF 24.00020 464 6005RC PIPE (CL III)(24 IN)LF 84.00021 2464 6085RC PIPE (CL III) (24 IN) (ALT)LF 4.00022 1464 6087RC PIPE (CL III)(18 IN)(ALT)LF 292.00023 466 6003HEADWALL (CH - FW - 0) (DIA= 18 IN)EA 1.00024 466 6095HEADWALL (CH - PW - 0) (DIA= 18 IN)EA 1.00025 467 6172SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)EA 4.00026 467 6186SET (TY I)(S= 5 FT)(HW= 6 FT)(4:1) (C)EA 2.00027 467 6319SET (TY II) (12 IN) (CMP) (6: 1) (P)EA 2.00028 467 6326SET (TY II) (12 IN) (RCP) (6: 1) (P)EA 2.00029 467 6341SET (TY II) (15 IN) (RCP) (6: 1) (P)EA 4.00030 467 6348SET (TY II) (18 IN) (CMP) (6: 1) (P)EA 16.00031 467 6351SET (TY II) (18 IN) (HDPE) (6: 1) (P)EA 4.00032 467 6358SET (TY II) (18 IN) (RCP) (4: 1) (C)EA 6.00033 467 6363SET (TY II) (18 IN) (RCP) (6: 1) (P)EA 150.00034 467 6373SET (TY II) (21 IN) (RCP) (6: 1) (C)EA 2.00035 467 6384SET (TY II) (24 IN) (HDPE) (6: 1) (P)EA 4.00036 467 6390SET (TY II) (24 IN) (RCP) (4: 1) (C)EA 30.00037 467 6395SET (TY II) (24 IN) (RCP) (6: 1) (P)EA 22.00038 467 6419SET (TY II) (30 IN) (RCP) (4: 1) (C)EA 2.00039 467 6463SET (TY II) (42 IN) (RCP) (4: 1) (C)EA 2.00040 496 6005REMOV STR (WINGWALL)EA 4.00041 496 6006REMOV STR (HEADWALL)EA 4.00042 496 6007REMOV STR (PIPE)LF 275.00043 500 6001MOBILIZATIONLS 1.00044 502 6001BARRICADES, SIGNS AND TRAFFIC HANDLINGMO 9.00045 506 6041BIODEG EROSN CONT LOGS (INSTL) (12")LF 1,064.00046 506 6043BIODEG EROSN CONT LOGS (REMOVE)LF 1,064.00047 530 6004DRIVEWAYS (CONC)SY 77.00048 530 6005DRIVEWAYS (ACP)SY 2,100.00049 530 6016 DRIVEWAYS (BASE)SY 6,872.00050 533 6004RUMBLE STRIPS (CENTERLINE) ASPHALTLF 29,602.00051 560 6003MAILBOX INSTALL-M (TWG-POST) TY 1EA 27.00052 560 6011MAILBOX INSTALL-S (TWW-POST) TY 4EA 39.00053 560 6012MAILBOX INSTALL-D (TWW-POST) TY 4EA 19.00054 644 6001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA 12.00055 644 6002IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)EA 23.00056 644 6033IN SM RD SN SUP&AM TYS80(1)SA(U)EA 1.00057 644 6076REMOVE SM RD SN SUP&AMEA 34.00058 658 6010INSTL DEL ASSM (D-SW)SZ 2(WC)GNDEA 2.00059 658 6060REMOVE DELIN & OBJECT MARKER ASSMSEA 28.00060 658 6099INSTL OM ASSM (OM-2Z)(WFLX)GNDEA 38.00061 662 6037WK ZN PAV MRK NON-REMOV (Y)6"(SLD)LF 29,602.00062 662 6111WK ZN PAV MRK SHT TERM (TAB)TY Y-2EA 2,400.00063 666 6285REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)LF 54,857.00064 666 6317RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)LF 4,170.00065 666 6320RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)LF 31,379.00066 668 6076PREFAB PAV MRK TY C (W) (24") (SLD)LF 310.00067 672 6009REFL PAV MRKR TY II-A-AEA 432.00068 730 6002FULL - WIDTH MOWINGAC 52.00069 734 6001LITTER REMOVALAC 52.00070 30776033SP MIXES SP-C SAC-A PG76-22TON 10,817.00071 30776075TACK COATGAL 5,900.00072 60016001PORTABLE CHANGEABLE MESSAGE SIGNDAY 266.00073 61856002TMA (STATIONARY)DAY 133.00074 61856005TMA (MOBILE OPERATION)DAY 266.00075 62276001SOLAR POWERED LED WARNING SIGNEA 24.00076 1A42166001THERMOPLASTIC PIPE (PP) (18")LF 292.00077 2A42166002THERMOPLASTIC PIPE (PP) (24")LF 4.00078 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PARTICIPATING) $40,000.00 Total Bid Amount _______________________________ ____________________________________ certifies that the unit prices shown on this completed computer print-out for all of the bid items, alternate items, option items, and add alternate items contained in this proposal are the unit prices intended and that its bid will be tabulated using these unit prices and no other information from this print-out. ____________________________________ acknowledges and agrees that the total bid amount shown will be read as its total bid and further agree that the official total bid amount will be determined by multiplying the unit bid prices shown in this print-out by the respective estimated quantities shown in the proposal and then totaling all of the extended amounts. Signed ______________________________________________ Title ______________________________________________ Date ______________________________________________ Additional Signature for Joint Venture: Signed ______________________________________________ Title ______________________________________________ Date ______________________________________________